Province | Subbasin | % |
---|---|---|
Columbia Plateau | John Day | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Compliance | A: 165. Obtain NEPA Compliance | 03/31/2015 | 03/31/2015 | |
Submit drawings and/or specifications to BPA | B: 175. Coordinate with Reclamation on Completion of Design and Plans for Phase 3 | 03/31/2015 | 03/31/2015 | |
Information Sign Updating, Access Regulation, Hunting Program | C: 188. Provide Access, Signs, and Adequate Roads | 03/31/2015 | 03/31/2015 | |
Project Outreach and Opportunities, Information Distribution | D: 99. Public Access and Volunteer Coordination | 03/31/2015 | 03/31/2015 | |
Facility Maintenance | E: 186. Maintain Facilities and Structures throughout the Property | 03/31/2015 | 03/31/2015 | |
Property Patrol | F: 26. Property Patrol | 03/31/2015 | 03/31/2015 | |
Establish Vegetation | G: 47. Plant Seed and Locally Collected Cuttings | 12/26/2014 | 12/05/2014 | |
Completed Grazing Season | H: 92. Grazing Program Oversight and Management | 03/31/2015 | 03/31/2015 | |
Fish, Habitat, Temperature, Weather and Flow Data | I: 157. Monitor Property Fish and Habitat Values | 03/31/2015 | 03/31/2015 | |
Conduct Steelhead and Chinook Redd Surveys with ODFW | J: 191. Conduct Steelhead and Chinook Redd Surveys with ODFW | 09/30/2014 | 09/30/2014 | |
Acquire Trees with Root Wads for Phase 3 Mine Tailings Restoration Project | K: 29. Contract to Acquire Trees with Root Wads for Phase 3B Mine Tailings Restoration Project | 03/31/2015 | ||
Property noxious weed control activities | L: 199. Property Noxious Weed Control Activities | 10/31/2014 | 10/31/2014 | |
Complete a portion of Phase 3 tailings remediation | M: 30. Complete a Portion of Phase 3 Tailings Remediation | 10/31/2014 | 09/19/2014 | |
Coordination and monitoring efforts for the Middle Fork John Day IMW Group | N: 191. Coordination and Monitoring Efforts for the Middle Fork John Day IMW Group | 03/31/2015 | 03/31/2015 | |
Protect and maintain riparian vegetation | O: 198. Protect Riparian Vegetation | 12/31/2014 | 12/23/2014 | |
Annual Progress Report | P: 132. 2013 Annual Progress Report | 11/28/2014 | 11/14/2014 | |
Project Management | R: 119. Manage and Administer Tribal Projects and BPA Activities | 03/31/2015 | 03/31/2015 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Lamprey, Pacific (Entosphenus tridentata) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Trout, Interior Redband (O. mykiss gairdnerii) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Obtain NEPA Compliance | 04/01/2014 | ||||||
B | 175 | Coordinate with Reclamation on Completion of Design and Plans for Phase 3 | 04/01/2014 | ||||||
C | 188 | Provide Access, Signs, and Adequate Roads | 04/01/2014 | ||||||
D | 99 | Public Access and Volunteer Coordination | 04/01/2014 | ||||||
E | 186 | Maintain Facilities and Structures throughout the Property | 04/01/2014 | ||||||
F | 26 | Property Patrol | 04/01/2014 | ||||||
G | 47 | Plant Seed and Locally Collected Cuttings | 04/01/2014 | ||||||
H | 92 | Grazing Program Oversight and Management | 04/01/2014 | ||||||
I | 157 | Monitor Property Fish and Habitat Values | 04/01/2014 | ||||||
J | 191 | Conduct Steelhead and Chinook Redd Surveys with ODFW | 04/01/2014 | ||||||
K | 29 | Contract to Acquire Trees with Root Wads for Phase 3B Mine Tailings Restoration Project | 04/01/2014 | ||||||
L | 199 | Property Noxious Weed Control Activities | 04/01/2014 | ||||||
M | 30 | Complete a Portion of Phase 3 Tailings Remediation | 04/01/2014 | ||||||
N | 191 | Coordination and Monitoring Efforts for the Middle Fork John Day IMW Group | 04/01/2014 | ||||||
O | 198 | Protect Riparian Vegetation | 04/01/2014 | ||||||
P | 132 | 2013 Annual Progress Report | 04/01/2014 | ||||||
Q | 185 | Periodic Status Reports for BPA | 04/01/2014 | ||||||
R | 119 | Manage and Administer Tribal Projects and BPA Activities | 04/01/2014 |