Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Compliance | A: 165. Obtain NEPA Compliance | 03/31/2014 | 03/31/2014 | |
Information Sign Updating, Access Regulation, Hunting Program | B: 188. Provide Access, Signs, and Adequate Roads | 03/31/2014 | 03/31/2014 | |
Project Outreach and Opportunities, Information Distribution | C: 99. Public Access and Volunteer Coordination | 03/31/2014 | 03/31/2014 | |
Facility Maintenance | D: 186. Maintain Facilities and Structures throughout the Property | 03/31/2014 | 03/31/2014 | |
Property Patrol | E: 26. Property Patrol | 03/31/2014 | 03/31/2014 | |
Establish Vegetation | F: 47. Plant Seed and Locally Collected Cuttings | 03/28/2014 | 03/28/2014 | |
Completed Grazing Season | G: 92. Grazing Program Oversight and Management | 03/31/2014 | 03/31/2014 | |
Fish, Weather, and Habitat Monitoring | H: 157. Monitor Property Fish and Habitat Values | 03/31/2014 | 03/31/2014 | |
Dredge Tailings Restoration Design and Identify Project Schedules for Other Sites | I: 114. Coordinate with Reclamation on Future Restoration Designs | 03/31/2014 | 03/31/2014 | |
Weed and Vegetation Management | J: 197. Property Weed Control Activities and Vegetation Management | 12/20/2013 | 12/05/2013 | |
Maintain Vegetation | K: 197. Protect Riparian Vegetation | 12/13/2013 | 12/05/2013 | |
Replace Septic Tank and Leach Field for Lufkin Cabin | L: 186. Replace Septic Tank and Leach Field for the Lufkin Cabin | 09/06/2013 | 09/11/2013 | |
Re-build the Lufkin Cabin Front Deck | M: 186. Replace Deck on Lufkin Cabin | 11/29/2013 | 08/16/2013 | |
Conduct Steelhead and Chinook Redd Surveys with ODFW | N: 191. Conduct Steelhead and Chinook Redd Surveys with ODFW | 09/27/2013 | 09/27/2013 | |
Acquire Trees with Root Wads for Phase III Mine Tailings Restoration Project | O: 29. Contract to Acquire Trees with Root Wads for Phase III Mine Tailings Restoration Project | 03/31/2014 | ||
Annual Progress Report | P: 132. 2012 Annual Progress Report | 08/30/2013 | 08/30/2013 | |
Project Management | R: 119. Manage and Administer Tribal Projects and BPA Activities | 03/31/2014 | 03/31/2014 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Lamprey, Pacific (Entosphenus tridentata) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Trout, Interior Redband (O. mykiss gairdnerii) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Obtain NEPA Compliance | 04/01/2013 | ||||||
B | 188 | Provide Access, Signs, and Adequate Roads | 04/01/2013 | ||||||
C | 99 | Public Access and Volunteer Coordination | 04/01/2013 | ||||||
D | 186 | Maintain Facilities and Structures throughout the Property | 04/01/2013 | ||||||
E | 26 | Property Patrol | 04/01/2013 | ||||||
F | 47 | Plant Seed and Locally Collected Cuttings | 07/03/2013 | ||||||
G | 92 | Grazing Program Oversight and Management | 04/01/2013 | ||||||
H | 157 | Monitor Property Fish and Habitat Values | 04/01/2013 | ||||||
I | 114 | Coordinate with Reclamation on Future Restoration Designs | 04/01/2013 | ||||||
J | 197 | Property Weed Control Activities and Vegetation Management | 07/03/2013 | ||||||
K | 197 | Protect Riparian Vegetation | 04/01/2013 | ||||||
L | 186 | Replace Septic Tank and Leach Field for the Lufkin Cabin | 07/03/2013 | ||||||
M | 186 | Replace Deck on Lufkin Cabin | 07/03/2013 | ||||||
N | 191 | Conduct Steelhead and Chinook Redd Surveys with ODFW | 04/01/2013 | ||||||
O | 29 | Contract to Acquire Trees with Root Wads for Phase III Mine Tailings Restoration Project | 04/01/2013 | ||||||
P | 132 | 2012 Annual Progress Report | 04/01/2013 | ||||||
Q | 185 | Periodic Status Reports for BPA | 04/01/2013 | ||||||
R | 119 | Manage and Administer Tribal Projects and BPA Activities | 04/01/2013 |