Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 65827: 2010-001-00 EXP UC PROGRAMMATIC - BUREAU DESIGN MID-ENTIAT
Project Number:
Title:
Upper Columbia Programmatic Habitat
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 25.00%
Methow 25.00%
Okanogan 25.00%
Wenatchee 25.00%
Contract Number:
65827
Contract Title:
2010-001-00 EXP UC PROGRAMMATIC - BUREAU DESIGN MID-ENTIAT
Contract Continuation:
Previous: Next:
n/a
  • 69953: 2010-001-00 EXP UC PROGRAMMATIC - BUREAU DESIGN MID-ENTIAT
Contract Status:
Closed
Contract Description:
This contract will serve as a portal for BPA funding to support Reclamation to design the Middle Entiat Project.

The Middle Entiat Project consists of a number of habitat improvement projects in the Gray and Stormy Reaches of the Entiat River in Chelan Co, WA.  Reclamation and BPA are undertaking this work as partial fulfillment of their obligations to improve tributary habitata for spring Chinook and Steelhead un der the 2008 FCRPS BiOp.  The Gray and Stormy Reaches of the Entiat River have been evaluated for habitat rehabilitation and potential projects have been identified through a Reach Assessments (2012) and Map Books illustrating initial habitat improvement concepts (2012).  These documents can be found on Reclamation’s web page here:  

http://www.usbr.gov/pn/programs/fcrps/thp/ucao/index.html

The project area is located roughly between River Miles (RM) 16.1 and 20.9  and includes many proposed in-stream structures, side channel improvements, alcove improvements and bank roughness.

The purpose of this contract is to retain the services of a design engineer to provide technical analysis and coordination for the Middle Entiat project.  The project is broken out into several phases.  This phase of work includes analysis and coordination to advance the concepts outlined in the Stormy Reach and Gray Reach Map Books to preferred concepts and then to 30% design,  This will be done using Reclamation's contractor.

Reclamation's contractor will participate on both the DesignTeam and Project Team for the Middle Entiat project during this and future phases of the project. The Design Team will be led by the contractor and is tasked with understanding and combining in an appropriate way the stakeholder, biological and physical project objectives to be used by the design engineer (contractor) to develop preferred concepts and designs.  The design engineer (contractor), as a member of the design team, is required to track all decisions and design changes for each project element.  Reclamation's contractor is expected to work closely with Reclamation, the Design Team, and the Project Team to ensure project objectives are clearly identified/understood and that proposed concepts will meet those objectives.  

To accomplish the tasks described herein, Reclamation's contractor will perform project management, technical analysis, and design, all of which will require staff time in an office setting as well as travel to the Wenatchee area to coordinate with other stakeholders.
Account Type(s):
Expense
Contract Start Date:
07/15/2014
Contract End Date:
07/14/2015
Current Contract Value:
$827,903
Expenditures:
$827,903

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Roy Beaty Bonneville Power Administration Yes F&W Approver rebeaty@bpa.gov (503) 230-5213
Joseph Connor Bonneville Power Administration Yes COR jwconnor@bpa.gov (503) 230-3172
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Steve Kolk US Bureau of Reclamation (BOR) Yes Supervisor skolk@usbr.gov (509) 667-8494
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Robert Richardson US Bureau of Reclamation (BOR) Yes Technical Contact rrichardson@usbr.gov (208) 378-5233
Jaimee Turner US Bureau of Reclamation (BOR) Yes Contract Manager jmturner@usbr.gov (208) 378-5397


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Permit Development if applicable A: 165. Initiate EC Permitting Process 07/14/2015 07/14/2015
Revised Project Management Plan B: 119. Project Management and Coordination 06/01/2015 06/01/2015
Final Preferred Concept C: 175. Develop Preferred Concept 01/01/2015 01/01/2015
Final 30% Drawings, Design Report, and Cost Estimates D: 175. 30% Design Analysis 06/01/2015 06/01/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 2 instances of WE 175 Produce Design
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 2 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Initiate EC Permitting Process 03/17/2014
B 119 Project Management and Coordination 01/01/2014
C 175 Develop Preferred Concept 07/15/2014
D 175 30% Design Analysis 07/15/2014
E 185 Periodic Status Reports for BPA 01/01/2014
F 132 (no report is required per COTR) 01/01/2014