Province | Subbasin | % |
---|---|---|
Columbia Gorge | Hood | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
All work complies with environmental regulations | B: 165. Work with BPA on Environmental Compliance requirements. | 09/30/2015 | 09/30/2015 | |
Project administration requirements completed | C: 119. Manage Project | 09/30/2015 | 09/30/2015 | |
Pesticide trend assessment in Hood River subbasin. | D: 115. Pesticide assessment in Hood River Subbasin. | 09/30/2015 | 09/30/2015 | |
Hood River Watershed Group support | E: 114. Provide implementation support | 09/30/2015 | 09/30/2015 | |
Riparian fences maintained. | F: 186. Maintain riparian fences | 09/01/2015 | 08/28/2015 | |
Plantings of riparian vegetation along 600 ft. of Neal Creek.. | G: 47. Plant riparian vegetation to reduce orchard spray drift from entering creeks. | 07/02/2015 | 04/28/2015 | |
Hood River Water Management Plan Development Support | H: 174. Participate in Hood River County Water planning group. | 09/30/2015 | 09/30/2015 | |
Instream Flows Secured | I: 154. Secure water instream. | 09/30/2015 | 09/30/2015 | |
Two abandoned pipeline berms removed from lower Hood River. | J: 180. Lower Hood River pipeline berm removal. | 09/30/2015 | 09/30/2015 | |
Eight LWD placement projects inspected. | K: 186. Inspect large wood placement projects. | 09/28/2015 | 09/28/2015 | |
Large wood placed in 0.6 miles of Red Hill Creek. | L: 29. Red Hill Creek large wood placement. | 09/17/2015 | ||
Maintain vegetation under Big Eddy Power to 4 ft. high where it crosses West Fork Hood River | M: 199. BPA Powerline Vegetation Maintenance | 07/16/2015 | 07/16/2015 | |
FY 2014 Annual Progress Report complete | N: 132. Prepare and submit annual report for FY 14 work | 03/31/2015 | 03/31/2015 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened) |
|
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened) |
|
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened) |
|
Lamprey, Pacific (Entosphenus tridentata) |
|
Lamprey, River (L. ayresi) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 10/01/2014 | ||||||
B | 165 | Work with BPA on Environmental Compliance requirements. | 10/01/2014 | ||||||
C | 119 | Manage Project | 10/01/2014 | ||||||
D | 115 | Pesticide assessment in Hood River Subbasin. | 10/01/2014 | ||||||
E | 114 | Provide implementation support | 10/01/2014 | ||||||
F | 186 | Maintain riparian fences | 10/01/2014 | ||||||
G | 47 | Plant riparian vegetation to reduce orchard spray drift from entering creeks. | 10/01/2014 | ||||||
H | 174 | Participate in Hood River County Water planning group. | 10/01/2014 | ||||||
I | 154 | Secure water instream. | 10/01/2014 | ||||||
J | 180 | Lower Hood River pipeline berm removal. | 07/01/2015 | ||||||
K | 186 | Inspect large wood placement projects. | 10/01/2014 | ||||||
L | 29 | Red Hill Creek large wood placement. | 10/01/2014 | ||||||
M | 199 | BPA Powerline Vegetation Maintenance | 10/01/2014 | ||||||
N | 132 | Prepare and submit annual report for FY 14 work | 10/01/2014 |