Province | Subbasin | % |
---|---|---|
Columbia Gorge | Hood | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
All work complies with environmental regulations | B: 165. Work with BPA on Environmental Compliance requirements. | 09/30/2016 | 09/30/2016 | |
Project administration requirements completed | C: 119. Manage Project | 09/30/2016 | 09/30/2016 | |
Pesticide trend assessment in Hood River subbasin. | D: 115. Pesticide assessment in Hood River Subbasin. | 09/30/2016 | 09/30/2016 | |
Hood River Watershed Group support | E: 114. Provide implementation support | 09/30/2016 | 09/30/2016 | |
Riparian fences maintained. | F: 186. Maintain riparian fences | 09/01/2016 | 09/01/2016 | |
Riparian spray buffers inspected. | G: 47. Inspect riparian spray buffer planting projects. | 09/02/2016 | 09/02/2016 | |
EFID by-pass reach instream flow maintained. | H: 154. Secure water instream. | 09/30/2016 | 09/30/2016 | |
Progress towards a hydro water lease with an irrigation district. | I: 154. Irrigation District Water Transactions Assistance | 09/30/2016 | 09/30/2016 | |
Powerdale water right transferred instream. | J: 154. Powerdale instream water right transfer | 09/30/2016 | 09/30/2016 | |
: Eight LWD placement projects inspected. | K: 186. Inspect large wood placement projects. | 09/30/2016 | 09/30/2016 | |
0.6 mile of fish habitat improved in West Fork Hood River | L: 29. West Fork Red Hill Large Wood Placement – Phase 1. | 09/16/2016 | 08/30/2016 | |
Up to 256 mbf of fish logs procured and stockpiled. | M: 29. Obtain logs for out year fish habitat restoration projects. | 09/30/2016 | ||
Maintain vegetation under Big Eddy Power to 4 ft. high where it crosses West Fork Hood River | N: 198. BPA Powerline Vegetation Maintenance | 08/01/2016 | 06/30/2016 | |
FY 2015 Annual Progress Report complete | O: 132. Prepare and submit annual report for FY 15 work | 02/12/2016 | 02/12/2016 | |
Fish habitat improvement project in East Fork watershed planned | P: 114. Identify and develop instream fish habitat improvement projects in East Fork watershed. | 09/30/2016 | 09/30/2016 | |
Fish habitat improvement project in Neal Creek planned. | Q: 114. Identify and develop instream fish habitat improvement projects in Neal Creek. | 09/30/2016 | 09/30/2016 | |
Stream channel restored. | R: 180. Odell Creek small hydro dam removal stream channel restoration. | 09/30/2016 | 09/23/2016 | |
Telemetry equipment installed at four sites in EFID. | S: 148. East Fork Irrigation District Telemetry System Design and Construction | 09/30/2016 | ||
72 ft. long open arch culvert installed underneath Hudson Rd. along Evans Creek. | T: 184. Replace culvert in Evans Creek. | 09/30/2016 | 09/30/2016 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened) |
|
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened) |
|
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened) |
|
Lamprey, Pacific (Entosphenus tridentata) |
|
Lamprey, River (L. ayresi) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 10/01/2015 | ||||||
B | 165 | Work with BPA on Environmental Compliance requirements. | 10/01/2015 | ||||||
C | 119 | Manage Project | 10/01/2015 | ||||||
D | 115 | Pesticide assessment in Hood River Subbasin. | 10/01/2015 | ||||||
E | 114 | Provide implementation support | 10/01/2015 | ||||||
F | 186 | Maintain riparian fences | 10/01/2015 | ||||||
G | 47 | Inspect riparian spray buffer planting projects. | 10/01/2015 | ||||||
H | 154 | Secure water instream. | 10/01/2015 | ||||||
I | 154 | Irrigation District Water Transactions Assistance | 10/01/2015 | ||||||
J | 154 | Powerdale instream water right transfer | 10/01/2015 | ||||||
K | 186 | Inspect large wood placement projects. | 10/01/2015 | ||||||
L | 29 | West Fork Red Hill Large Wood Placement – Phase 1. | 10/01/2015 | ||||||
M | 29 | Obtain logs for out year fish habitat restoration projects. | 10/01/2015 | ||||||
N | 198 | BPA Powerline Vegetation Maintenance | 10/01/2015 | ||||||
O | 132 | Prepare and submit annual report for FY 15 work | 10/01/2015 | ||||||
P | 114 | Identify and develop instream fish habitat improvement projects in East Fork watershed. | 10/01/2015 | ||||||
Q | 114 | Identify and develop instream fish habitat improvement projects in Neal Creek. | 10/01/2015 | ||||||
R | 180 | Odell Creek small hydro dam removal stream channel restoration. | |||||||
S | 148 | East Fork Irrigation District Telemetry System Design and Construction | 10/01/2015 | ||||||
T | 184 | Replace culvert in Evans Creek. |