62758: 2010-001-00 EXP TWISP RIVER FLOODPLAIN |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Complete Environmental Compliance permitting processes | A: 165. Obtain Required Permits, Authorizations, and Documentation for the Twisp River Floodplain project | 09/21/2015 | 09/21/2015 | |
All administrative tasks fulfilled with timely quality products | B: 119. Manage BPA Contracting Requirements | 09/21/2015 | 09/21/2015 | |
Obtain Data to Support Final Design Final Design and Materials Balance | C: 115. Obtain data to inform development of final design | 09/15/2015 | 09/21/2015 | |
Weed management / removal | D: 199. Remove weeds prior to implementation | 09/21/2015 | 09/21/2015 | |
Alternate Water Supply, Abandonment and Decommissioning of Existing Surface Supply | E: 82. Install irrigation well | 09/21/2015 | 09/18/2015 | |
Plant and maintain native riparian vegetation | F: 47. Establish native riparian plantings | 09/21/2015 | 09/21/2015 | |
Final Design and Specifications | G: 175. Complete final design and specs | 09/21/2015 | 09/21/2015 | |
Pre-construction Contracting and Management | H: 100. Conduct pre-construction bid and contracting process | 09/21/2015 | 09/21/2015 | |
Acquisition of construction materials for implementation contract | I: 180. Acquire Complexity Restoration Materials | 09/21/2015 | 09/21/2015 | |
Seasonal maintenance - native riparian vegetation | J: 198. Assess and maintain restoration vegetation (WDFW Floodplain) | 09/21/2015 | 09/21/2015 | |
Assessment and Adaptive Management | K: 186. Assess, monitor, and repair installed habitat elements (WDFW Floodplain) | 09/21/2015 | 09/21/2015 | |
Maintain, Repair, Install and/or Remove | L: 186. Construction Services (WDFW Floodplain) | 09/21/2015 | 09/21/2015 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Obtain Required Permits, Authorizations, and Documentation for the Twisp River Floodplain project | 09/22/2014 | ||||||
B | 119 | Manage BPA Contracting Requirements | 09/22/2014 | ||||||
C | 115 | Obtain data to inform development of final design | 04/14/2015 | ||||||
D | 199 | Remove weeds prior to implementation | 04/15/2015 | ||||||
E | 82 | Install irrigation well | 04/15/2015 | ||||||
F | 47 | Establish native riparian plantings | 04/15/2015 | ||||||
G | 175 | Complete final design and specs | |||||||
H | 100 | Conduct pre-construction bid and contracting process | 09/22/2014 | ||||||
I | 180 | Acquire Complexity Restoration Materials | 04/14/2015 | ||||||
J | 198 | Assess and maintain restoration vegetation (WDFW Floodplain) | 09/22/2014 | ||||||
K | 186 | Assess, monitor, and repair installed habitat elements (WDFW Floodplain) | 09/22/2015 | ||||||
L | 186 | Construction Services (WDFW Floodplain) | 09/22/2014 | ||||||
M | 185 | Periodic Status Reports for BPA | 09/22/2014 | ||||||
N | 132 | Submit Progress Report for the period (Sep 2014) to (Sep 2015) - funded through a separate contract | 09/22/2014 |