Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 67263: 2000-035-00 EXP NPT NEWSOME CREEK RESTORATION
Project Number:
Title:
Newsome Creek Watershed Restoration
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
67263
Contract Title:
2000-035-00 EXP NPT NEWSOME CREEK RESTORATION
Contract Continuation:
Previous: Next:
63168: 2000-035-00 EXP NPT NEWSOME CREEK RESTORATION
  • 71036: 2000-035-00 EXP NPT NEWSOME CREEK RESTORATION
Contract Status:
Closed
Contract Description:
Contract History:

Beginning in 2000, this project evolved from the 1996 Newsome Creek Haysfork Gloryhole Project (one of the original Clearwater Early Action projects).  This comprehensive restoration effort focuses on mitigating and restoring limiting factors to fisheries production.  The primary limiting factors are excessive sedimentation into the spawning and rearing areas of streams, and the lack of available habitat and habitat connectivity.  These limiting factors result from forest management activities, specifically road building (watershed has very high road densities), and mining.  

Completed contract work includes the completion of the Newsome Creek Ecosystem Analysis at the Watershed Scale (EAWS), road condition surveys completed for the entire watershed (approximately 220 miles), 26 miles of road decommissioning, 18 miles of road improvement, culvert/stream crossing inventories completed for all high priority sites, replacement of the Mare Creek & Mule Creek culverts, Newsome Creek Channel Restoration Feasibility Study, the completed NEPA process for the Newsome Creek Watershed Restoration Project, and completion of the final design for the Newsome Creek channel reconstruction and restoration.  Implementation of the floodplain and channel restoration began in 2011 with Reaches 5 & 4 being completed, and Reach 3 being completed in 2012.  2013 implementation included approximately half of the floodplain restoration in Reach 2 as well as constructing a new spillway and channel in Haysfork Sediment Settling Pond.  FY 2014 contract implementation focused on continuing the Newsome Stream Restoration Project, with additional floodplain restoration in stream reach 2 (another 22,000 cubic yards of dredge removal) and the re-vegetation of reaches 5, 4, and 3.

This project has been, and is still currently a part of the Nez Perce Clearwater National Forest, Nez Perce Tribe, and BPA Watershed Restoration Partnership.  Since the project’s inception, we have shared project planning, costs, and implementation responsibilities.  


Summary of FY 2015 Contract Implementation:

We will complete the floodplain restoration in stream reach 2, with an estimated 35,000 cubic yards of dredge tailings removal.  Growth of all the riparian plants required for the revegetation of stream reach 2 will also begin under this contract.
Account Type(s):
Expense
Contract Start Date:
12/01/2014
Contract End Date:
11/30/2015
Current Contract Value:
$394,605
Expenditures:
$394,605

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Stephanie Bransford Nez Perce Tribe Yes Contract Manager stephanieb@nezperce.org (208) 983-0675
Michelle Guay Bonneville Power Administration Yes Env. Compliance Lead mxguay@bpa.gov (503) 230-3459
David Kaplowe Bonneville Power Administration Yes COR djkaplowe@bpa.gov (503) 230-5365
Amber MacLachlan Bonneville Power Administration Yes Contracting Officer almcmahon@bpa.gov (503) 230-3983
Heidi McRoberts Nez Perce Tribe Yes Supervisor heidim@nezperce.org (208) 621-3548
Emmit Taylor, Jr. Nez Perce Tribe No Supervisor emmitt@nezperce.org (208) 621-3544
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental compliance documentation submitted to BPA A: 165. Submit environmental compliance documentation to BPA 04/30/2015 04/30/2015
Stream reach 2 tailings removed and re-graded B: 52. Newsome Creek Floodplain Restoration, Reach 2 10/30/2015 09/25/2015
Plant propagation for Newsome Creek, Reach 2 C: 47. Newsome Plant Propagation, Reach 2 10/30/2015 10/19/2015
FY 2016 SOW package and FY 2015 accrual estimate D: 119. Management, Coordination, and Communication 10/30/2015 11/30/2015
Final FY 2015 annual report attached to this contract E: 132. Submit Annual Report for 12/1/14 - 11/30/15 11/30/2015 11/30/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 52 Remove Mine Tailings
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 52 Remove Mine Tailings
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 47 Plant Vegetation
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 47 Plant Vegetation

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Submit environmental compliance documentation to BPA 12/01/2014
B 52 Newsome Creek Floodplain Restoration, Reach 2 10/06/2015
C 47 Newsome Plant Propagation, Reach 2 12/01/2014
D 119 Management, Coordination, and Communication 12/01/2014
E 132 Submit Annual Report for 12/1/14 - 11/30/15 12/01/2014
F 185 Periodic Status Reports for BPA 12/01/2014