Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 71036: 2000-035-00 EXP NPT NEWSOME CREEK RESTORATION
Project Number:
Title:
Newsome Creek Watershed Restoration
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
71036
Contract Title:
2000-035-00 EXP NPT NEWSOME CREEK RESTORATION
Contract Continuation:
Previous: Next:
67263: 2000-035-00 EXP NPT NEWSOME CREEK RESTORATION
Contract Status:
Closed
Contract Description:
Contract History:

Beginning in 2000, this project evolved from the 1996 Newsome Creek Haysfork Gloryhole Project (one of the original Clearwater Early Action projects).  This comprehensive restoration effort focuses on mitigating and restoring limiting factors to fisheries production.  The primary limiting factors are excessive sedimentation into the spawning and rearing areas of streams, and the lack of available habitat and habitat connectivity.  These limiting factors have resulted from forest management practices, specifically road building (watershed has very high road densities), and mining.  

Completed contract work includes the completion of the Newsome Creek Ecosystem Analysis at the Watershed Scale (EAWS), road condition surveys completed for the entire watershed (approximately 220 miles), 26 miles of road decommissioning, 18 miles of road improvement, culvert/stream crossing inventories completed for all high priority sites, replacement of the Mare Creek & Mule Creek culverts, Newsome Creek Channel Restoration Feasibility Study, the completed NEPA process for the Newsome Creek Watershed Restoration Project, and completion of the final design for the Newsome Creek channel reconstruction and restoration.  Implementation of the floodplain and channel restoration began in 2011 with Reaches 5 & 4 being completed, and Reach 3 being completed in 2012.  2013 implementation included approximately half of the floodplain restoration in Reach 2 as well as constructing a new spillway and channel in Haysfork Sediment Settling Pond.  FY 2014 contract implementation focused on continuing the Newsome Stream Restoration Project, with additional floodplain restoration in stream reach 2 (another 22,000 cubic yards of dredge removal) and the re-vegetation of reaches 5, 4, and 3. Reach 2 floodplain restoration was completed in FY 2015 with the removal of approximately 37,000 cubic yards of dredge material from the valley bottom.

This project has been, and is still currently a part of the Nez Perce Clearwater National Forest, Nez Perce Tribe, and BPA Watershed Restoration Partnership.  Since the project’s inception, we have shared project planning, costs, and implementation responsibilities.  


Summary of FY 2016 Contract Implementation:

With the completion of floodplain restoration in Stream Reach 2, we can now focus FY 2016 on re-designing the stream channel configuration in that section of Newsome Creek.  The previous design was based on small-scale selective removal of dredge material, which limited the opportunities to re-configure Newsome Creek and achieve the channel features and geomorphology that Newsome Creek would have historically had in that reach.  The design will utilize data and topography surveys that have already been completed.

A portion of the 2016 funds from this contract have been re-allocated to two separate projects (Red River 2002-072-00 and Lower South Fork Clearwater 2010-003-00).  Both of these projects needed additional funds for implementation of high priority restoration projects.  Due to the fact that the Newsome Stream and Floodplain Restoration Project (Phase I) is in need of an additional design for Reach 2, therefore, delaying implementation of stream restoration by one year, a portion of the contract funds could be re-allocated.  Both Red River and the Lower South Fork projects will implement high priority projects within the South Fork Clearwater River Subbasin and have a deficit of funds to cover the planned actions.
Account Type(s):
Expense
Contract Start Date:
12/01/2015
Contract End Date:
01/31/2017
Current Contract Value:
$307,802
Expenditures:
$307,802

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Stephanie Bransford Nez Perce Tribe Yes Contract Manager stephanieb@nezperce.org (208) 983-0675
Rossana Callejas Bonneville Power Administration No Interested Party rxcallejas@bpa.gov (503) 230-7558
Marcie Carter Nez Perce Tribe Yes Supervisor marciec@nezperce.org (208) 621-3534
Michelle Guay Bonneville Power Administration Yes Env. Compliance Lead mxguay@bpa.gov (503) 230-3459
Tracy Hauser Bonneville Power Administration Yes COR tlhauser@bpa.gov (503) 230-4296
John Skidmore Bonneville Power Administration Yes F&W Approver jtskidmore@bpa.gov (503) 230-5494
Emmit Taylor, Jr. Nez Perce Tribe No Supervisor emmitt@nezperce.org (208) 621-3544
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental compliance documentation submitted to BPA A: 165. Submit environmental compliance documentation to BPA 06/30/2016 06/30/2016
Stream Reach 2 Design B: 175. Newsome Channel Reconstruction and Structure Installation Design - Phase I / Stream Reach 2 10/31/2016 10/31/2016
FY 2017 SOW package and FY 2016 accrual estimate C: 119. Management, Coordination, and Communication 01/31/2017 01/31/2017
Final FY 2016 annual report attached to this contract D: 132. Submit Annual Report for 12/1/15 - 11/30/16 01/31/2017 01/31/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Submit environmental compliance documentation to BPA 12/01/2015
B 175 Newsome Channel Reconstruction and Structure Installation Design - Phase I / Stream Reach 2 12/01/2015
C 119 Management, Coordination, and Communication 12/01/2015
D 132 Submit Annual Report for 12/1/15 - 11/30/16 12/01/2015
E 185 Periodic Status Reports for BPA 12/01/2015