Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 68051: 1995-001-00 EXP KALISPEL RESIDENT FISH HATCHERY
Project Number:
Title:
Kalispel Tribe Resident Fish Program
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
68051
Contract Title:
1995-001-00 EXP KALISPEL RESIDENT FISH HATCHERY
Contract Continuation:
Previous: Next:
64000: 1995-001-00 EXP KALISPEL RESIDENT FISH HATCHERY
  • 71919: 1995-001-00 EXP KALISPEL RESIDENT FISH HATCHERY
Contract Status:
Closed
Contract Description:
The Kalispel Tribal Fish Hatchery (KTFH) is currently in transition from a warmwater Largemouth Bass (LMB) production facility to a dual purpose coldwater facility capable of producing triploid Rainbow Trout (TRBT) for tribal consumption and Westslope Cutthroat Trout (WCT) to support tributary restoration projects. Continued stocking of the Pend Oreille River with LMB is no longer feasible, or desirable for a variety of reasons. First, invasive Northern Pike have become firmly established and caused drastic changes in the fish community and reduced overall LMB population size. Second, Smallmouth Bass have increased in the reservoir and are known to out compete LMB in sympatry. Lastly, habitat improvement and non-native fish suppression and eradication projects being implemented in tributaries to the reservoir are coming to fruition through FERC license implementation and BPA-USACE--Kalispel MOA. It is now feasible to restore self-sustaining, genetically pure populations of WCT to recovered reaches.

We completed a Coldwater Conversion Hatchery Feasibility Study in 2014 in which a consultant team determined that a conversion of the existing facility is feasible and no fatal flaws were identified. The biological criteria used to determine feasibility were based on 3-year piscicide application schedule and restocking salvaged WCT and two cohorts of their offspring, while annually stocking 1,600 catchable TRBT into Indian Creek Pond raised from eyed eggs and fingerlings. Development of the new programs would entail partial reuse and redundancy of groundwater, redesign of surface water pumping plant, replacement of rearing vessels and plumbing, biosecurity measures, and introduction of naturalized rearing elements. Much of the infrastructure could be used and minimal expansion of the footprint would be required. Permitting, design, environmental compliance and Master Planning for the project will begin in late 2014.

During this contract period the KTFH will be rearing remaining LMB subadults from 2012 and 2013 production years to catchable size for outplanting in a Tribal pond in autumn 2015. No production of LMB is planned for the foreseeable future. Additionally, 1,600 TRBT will be reared from eyed eggs and fingerlings to 8"-16" catchables for outplaning into Indian Creek Pond, a private, Tribally owned 0.5 acre diversion of Indian Creek that is screened at its inlet and outlet. Ordinary maintenance of the hatchery facility and water supply systems will likely remain unchanged during this contract period.
Account Type(s):
Expense
Contract Start Date:
02/02/2015
Contract End Date:
02/01/2016
Current Contract Value:
$206,000
Expenditures:
$206,000

* Expenditures data includes accruals and are based on data through 30-Sep-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Todd Andersen Kalispel Tribe Yes Technical Contact tandersen@knrd.org (509) 447-7245
Jason Connor Kalispel Tribe Yes Interested Party jconnor@knrd.org (509) 447-7285
Wayne Gould Kalispel Tribe Yes Contract Manager wgould@knrd.org (509) 445-1147
Joe Maroney Kalispel Tribe Yes Supervisor jmaroney@knrd.org (509) 447-7272
Solomonn Marsh Bonneville Power Administration Yes Contracting Officer spmarsh@bpa.gov (503) 230-3943
Jason Olson Kalispel Tribe Yes Interested Party jolson@knrd.org (509) 447-7290
Jolene Seymour Kalispel Tribe Yes Interested Party jseymour@kalispeltribe.com (509) 445-1147
Jennifer Snyder Bonneville Power Administration Yes Env. Compliance Lead jasnyder@bpa.gov (503) 230-4187
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Completed Environmental Documentation B: 165. Obtain required environmental clearance to implement affected Work Elements 02/01/2016 02/01/2016
Maintain Hatchery Operations C: 61. Maintain day-to-day hatchery operations 02/01/2016 02/01/2016
Maintain fish health D: 60. Maintain fish health of hatchery raised fish 01/31/2016 01/31/2016
Put and Take Fishery E: 187. Stock hatchery raised fish for Tribal Member harvest 11/01/2015
Kalispel Tribal Fish Hatchery Production Plan F: 174. Kalispel Tribal Fish Hatchery Production Plan 10/31/2015
Attach Progress Report in Pisces G: 132. Submit Progress Report for the period February 2014 to February 2015 09/01/2015 12/15/2015
Attach Progress Report in Pisces H: 132. Submit Progress Report for the period February 2015 to February 2016 02/01/2016 12/15/2015
Hatchery Administration and Management I: 119. Prepare Draft Scope of Work and Budget for FY 16 02/01/2016 02/01/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Bass, Largemouth (Micropterus salmoides)
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 60 Maintain Fish Health
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 187 Put and Take Fisheries

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/02/2015
B 165 Obtain required environmental clearance to implement affected Work Elements 02/02/2015
C 61 Maintain day-to-day hatchery operations 02/02/2015
D 60 Maintain fish health of hatchery raised fish 02/02/2015
E 187 Stock hatchery raised fish for Tribal Member harvest 02/02/2015
F 174 Kalispel Tribal Fish Hatchery Production Plan 02/02/2015
G 132 Submit Progress Report for the period February 2014 to February 2015 02/02/2015
H 132 Submit Progress Report for the period February 2015 to February 2016 02/02/2015
I 119 Prepare Draft Scope of Work and Budget for FY 16 02/02/2015