Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 70557: 1991-061-00 EXP SWANSON LAKES WILDLIFE MITIGATION
Project Number:
Title:
Swanson Lake Wildlife Mitigation
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Crab 100.00%
Contract Number:
70557
Contract Title:
1991-061-00 EXP SWANSON LAKES WILDLIFE MITIGATION
Contract Continuation:
Previous: Next:
66989: 1991-061-00 EXP SWANSON LAKES O&M PROJECT IMPLEMENTATION
  • 74314 REL 2: 1991-061-00 EXP SWANSON LAKES WILDLIFE MITIGATION
Contract Status:
Closed
Contract Description:
This contract extends past the normal length of 12 months, running from October 1, 2015 to June 30, 2017, or 21 months. This was done to reset future contract implementation dates, changing them from October 1 to July 1 each year.

The Swanson Lakes Wildlife Area (SLWA) was initially approved as a wildlife mitigation project in 1992 and was re-approved for operations and maintenance (O&M) funding in 2002 under the Sub-basin Planning Process for the Columbia Plateau Province. This project partially addresses adverse impacts caused by the construction of Chief Joseph and Grand Coulee hydroelectric dams. On the Swanson Lakes Wildlife Area, wildlife habitat enhancement efforts to meet mitigation objectives have been performed between 1993 and 2006, with enhancements completed as of 2006. Continued operation and maintenance activities funded by BPA are necessary to maintain wildlife habitat benefits and to ensure BPA's mitigation obligation is met. These activities are essential to further the goal of the Washington Department of Fish and Wildlife (WDFW) to protect shrubsteppe and other habitats necessary to recover and sustain local and region-wide populations of Columbian sharp-tailed grouse.

Management actions planned for FY 16-17 include continued weed control, and management of extant shrubsteppe and riparian habitats, both  pre-existing and restored or enhanced sites, to maintain current HU values at SLWA. This may include activities such as inter-seeding restored grasslands as needed.

Roads, fences, parking areas, signs, and the kiosk will be maintained, repaired and replaced as needed. Debris and garbage will be removed and disposed of. Facilities, vehicles, and equipment will be maintained. One all-terrain vehicle, year model 1995, is scheduled for replacement (replacement was also scheduled for last year, but deferred). Facility maintenance costs may fluctuate unexpectedly, due to the advanced age of the headquarters building, a farmhouse built about 1915. Examples of possible unexpected costs would be minor to extensive sub-roofing or plumbing repairs.

Other tasks listed in the contract will be performed as needed.

Budget modification: during previous contract period, in January 2015, a small increase in funds was applied to this contract to cover COLA.  The increase is distributed evenly across all work elements.
Account Type(s):
Expense
Contract Start Date:
10/01/2015
Contract End Date:
06/30/2017
Current Contract Value:
$381,324
Expenditures:
$381,324

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Annual report of FY 15 activities B: 132. Submit Progress Report for the period October 2014 through September 2015 04/15/2016 03/31/2016
Deliverable: Receipt of environmental compliance clearance from BPA C: 165. Environmental compliance documentation 06/30/2017 06/30/2017
Functional boundary fencing and gates D: 186. Maintain fences and gates 06/30/2017 06/30/2017
Maintained roads, culverts, parking areas, signs, and kiosk E: 188. Maintain roads, culverts, parking areas and signs 06/30/2017 06/30/2017
Land leased from WDNR - WDFW Real Estate section can provide copies of leases. F: 92. Maintain leases 06/30/2017 06/30/2017
Safe, functional buildings and wells G: 186. Maintain facilities 06/30/2017 06/30/2017
Administrative duties completed H: 119. General project administration 06/30/2017 06/30/2017
Maintain extant and restored habitat, control noxious weeds. I: 198. Maintain extant/restored vegetation and control weeds 06/30/2017 06/30/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 198 Maintain Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 92 Lease Land

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 10/01/2015
B 132 Submit Progress Report for the period October 2014 through September 2015 10/01/2015
C 165 Environmental compliance documentation 10/01/2015
D 186 Maintain fences and gates 02/08/2016
E 188 Maintain roads, culverts, parking areas and signs 05/23/2016
F 92 Maintain leases 10/01/2015
G 186 Maintain facilities 02/08/2016
H 119 General project administration 10/01/2015
I 198 Maintain extant/restored vegetation and control weeds 02/08/2016