Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 71038: 2007-402-00 EXP IDFG SPRINGFIELD HATCHERY SOCKEYE PRODUCTION
Project Number:
Title:
Snake River Sockeye Captive Propagation
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
71038
Contract Title:
2007-402-00 EXP IDFG SPRINGFIELD HATCHERY SOCKEYE PRODUCTION
Contract Continuation:
Previous: Next:
66636: 2007-402-00 EXP IDFG SPRINGFIELD HATCHERY SOCKEYE PRODUCTION
  • 73979: 2007-402-00 EXP IDFG SPRINGFIELD HATCHERY SOCKEYE PRODUCTION
Contract Status:
Closed
Contract Description:
This contract period marks the transition from water-up and testing activities to traditional fish culture activities.   Approximately 544,790 BY14 fingerlings are in outdoor raceways.   A representative group of these fish will be PIT tagged during winter 2016.  The smolts will be released during May 2016 at a size of approximately 10 fish per pound (fpp).  Baseline data including growth, survival, feed conversion rates, etc. will be collected, reported monthly, and used to set-up future brood year's projections and standard fish culture procedures. Springfield FH anticipates a full production scenario of 1.1 million BY 15 eyed Sockeye Salmon eggs to be received in December 2015.  The resulting fry are to be incubated to the swim-up stage, then transferred to early rearing tanks in January/February 2016.  When these fish reach a size of approximately 90-120 fpp, they will be adipose clipped and transferred from early rearing tanks to the outdoor raceways.  This usually occurs in late June of each year.  Baseline data described above will continue to be collected.

Water delivery systems include fixed speed and variable speed pumps, head-boxes with aeration equipment, and chiller.  Testing and refinement of operational procedures relating to the water delivery systems to ensure a healthy rearing environment and optimal survival will continue into this contract period as necessary.

Hatchery staff will update inventory as equipment is received.  Annual preventative scheduled maintenance activities will be ongoing throughout this and all future contract periods.

Hatchery personnel will attend and participate in Stanley Basis Sockeye Technical Oversight Committee (SBSTOC) and program specific meetings as  program needs necessitate and time allows.
Account Type(s):
Expense
Contract Start Date:
10/01/2015
Contract End Date:
09/30/2016
Current Contract Value:
$919,116
Expenditures:
$919,116

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Dan Baker Idaho Department of Fish and Game (IDFG) Yes Technical Contact dan.baker@idfg.idaho.gov (208) 939-4114
Travis Brown Idaho Department of Fish and Game (IDFG) No Interested Party travis.brown@idfg.idaho.gov (208) 939-4114
Douglas Engemann Idaho Department of Fish and Game (IDFG) Yes Contract Manager dengemann@idfg.idaho.gov (208) 328-9945
Bryan Grant Idaho Department of Fish and Game (IDFG) Yes Supervisor bryan.grant@idfg.idaho.gov (208) 236-1256
Jeff (IDFG) Heindel Idaho Department of Fish and Game (IDFG) Yes Technical Contact jeff.heindel@idfg.idaho.gov (208) 287-2712
Paul Kline Idaho Department of Fish and Game (IDFG) Yes Interested Party paul.kline@idfg.idaho.gov (208) 287-2788
Christine Kozfkay Idaho Department of Fish and Game (IDFG) Yes Technical Contact christine.kozfkay@idfg.idaho.gov (208) 287-2789
Rachel Kutschera D J Warren and Associates, Inc. No Technical Contact rachel.kutschera@djwassociates.com (541) 929-4639
Solomonn Marsh Bonneville Power Administration Yes Contracting Officer spmarsh@bpa.gov (503) 230-3943
Jonathan McCloud Bonneville Power Administration Yes COR jmmccloud@bpa.gov (503) 230-3110
Jenna Peterson Bonneville Power Administration No Interested Party jepeterson@bpa.gov (503) 230-3018
Robert Shull Bonneville Power Administration Yes Env. Compliance Lead rwshull@bpa.gov (503) 230-3962
Dan Warren D J Warren and Associates, Inc. No Technical Contact dan.warren@djwassociates.com (541) 929-4639
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Permits/Authorizations Acquired A: 165. Obtain Permits and submit copies to BPA NEPA group 09/30/2016 09/30/2016
EC Report and Documentation B: 165. Perform environmental compliance for Redfish Lake Creek trap upgrade 09/30/2016
Buy materials and build road for Snake River sockeye smolt releases C: 66. Construction and Materials for Spur Road Snake River Sockeye Release Site 09/30/2016 06/30/2016
Snake River sockeye RPA/BiOp data submission to IDFG project leader D: 202. Snake River sockeye RPA/BiOp Data 02/29/2016 03/01/2016
Maintain Springfield Fish Hatchery E: 61. Maintenance of grounds and buildings at Springfield Hatchery 09/30/2016 09/30/2016
Attendance at program essential and SBSTOC meetings. F: 189. Quarterly SBSTOC coordination meeting and program essential meetings. 09/30/2016 09/30/2016
Rear BY 14 juvenile Sockeye Salmon at Springfield FH G: 176. Rear BY 2014 Springfield sockeye production group 09/30/2016 09/30/2016
Mark BY 2014 Springfield sockeye production group H: 158. Tag BY 2014 Springfield sockeye production group 04/15/2016 01/22/2016
Rear BY 2015 Sockeye Salmon Production Group at Springfield Hatchery I: 176. Rear BY 2015 Springfield sockeye production group 09/30/2016 09/30/2016
Mark BY 2015 Springfield sockeye production group J: 158. Mark BY 2015 Springfield sockeye production group 07/29/2016 07/14/2016
2016 Salmon River AOP K: 174. Salmon River Annual Operating Plan 09/30/2016
Completed Annual Report L: 132. Submit Progress Report for the period (OCT 2014) to (SEP 2015) 02/19/2016 02/29/2016
All administrative tasks fulfilled with timely quality products M: 119. Submit FY17 funding package to BPA 09/30/2016 09/30/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sockeye (O. nerka) - Snake River ESU (Endangered)
  • 2 instances of WE 176 Produce Hatchery Fish
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
  • 2 instances of WE 158 Mark/Tag Animals

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Permits and submit copies to BPA NEPA group 10/01/2015
B 165 Perform environmental compliance for Redfish Lake Creek trap upgrade 10/01/2015
C 66 Construction and Materials for Spur Road Snake River Sockeye Release Site 03/09/2016
D 202 Snake River sockeye RPA/BiOp Data
E 61 Maintenance of grounds and buildings at Springfield Hatchery 10/01/2015
F 189 Quarterly SBSTOC coordination meeting and program essential meetings. 10/01/2015
G 176 Rear BY 2014 Springfield sockeye production group 10/01/2015
H 158 Tag BY 2014 Springfield sockeye production group 10/01/2015
I 176 Rear BY 2015 Springfield sockeye production group 10/01/2015
J 158 Mark BY 2015 Springfield sockeye production group 10/01/2015
K 174 Salmon River Annual Operating Plan 10/01/2015
L 132 Submit Progress Report for the period (OCT 2014) to (SEP 2015) 10/01/2015
M 119 Submit FY17 funding package to BPA 10/01/2015
N 185 Periodic Status Reports for BPA 10/01/2015