Contract 66636: 2007-402-00 EXP IDFG SPRINGFIELD HATCHERY SOCKEYE PRODUCTION
Project Number:
Title:
Snake River Sockeye Captive Propagation
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
66636
Contract Title:
2007-402-00 EXP IDFG SPRINGFIELD HATCHERY SOCKEYE PRODUCTION
Contract Continuation:
Previous: Next:
62932: 2007-402-00 EXP IDFG SPRINGFIELD HATCHERY SOCKEYE PRODUCTION
  • 71038: 2007-402-00 EXP IDFG SPRINGFIELD HATCHERY SOCKEYE PRODUCTION
Contract Status:
Closed
Contract Description:
2014 marked the first production cycle of Sockeye smolts at the new Springfield Hatchery.   2015 shall mark the first production cycle of two brood year's of Sockeye at Springfield.   Hatchery staff will update inventory as equipment is received.  Care and maintenance of new buildings, fish rearing units, associated/support tools and equipment and vehicles will be a major work element during this contract period.

Water delivery systems include fixed speed and variable speed pumps, head-boxes with aeration equipment, and chiller.  Testing of these water delivery systems commenced during the previous contract period, and shall be an ongoing part of the project as necessary.

This contract period marks a shift from construction oversight, procurement, and the majority of water-up and testing activities to traditional fish culture activities.    Approximately 215,000  BY 2013 Sockeye Salmon are to be cultured from October 2014 through May 2015 at Springfield Hatchery.  These were received as eyed eggs in December 2013.   The resulting smolts are scheduled for release during the second week of May 2015.

Approximately 650,000-700,000 BY 2014 Sockeye are to be cultured from December 2014 through May 2016.  Eyed sockeye eggs are scheduled for receipt during December, 2014.  The resulting fry are to be incubated to the swim-up stage, then transferred to early rearing tanks until approximately 90-120 fpp.  The fingerlings will be marked and transferred to secondary rearing units for rearing to a project release size of 9-10  fpp.  Baseline data including survival, growth (monthly, growth units per temperature unit), feed conversion, etc.  will be collected, reported monthly, and used to set-up future brood year's projections.

Hatchery personnel will attend and participate in Stanley Basis Sockeye Technical Oversight Committee (SBSTOC) and program specific meetings as  program needs necessitate and time allows.
Account Type(s):
Expense
Contract Start Date:
10/01/2014
Contract End Date:
09/30/2015
Current Contract Value:
$837,448
Expenditures:
$837,448

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Dan Baker Idaho Department of Fish and Game (IDFG) Yes Technical Contact dan.baker@idfg.idaho.gov (208) 939-4114
Travis Brown Idaho Department of Fish and Game (IDFG) No Interested Party travis.brown@idfg.idaho.gov (208) 939-4114
Douglas Engemann Idaho Department of Fish and Game (IDFG) Yes Contract Manager dengemann@idfg.idaho.gov (208) 328-9945
Bryan Grant Idaho Department of Fish and Game (IDFG) Yes Supervisor bryan.grant@idfg.idaho.gov (208) 236-1256
Jeff (IDFG) Heindel Idaho Department of Fish and Game (IDFG) Yes Technical Contact jeff.heindel@idfg.idaho.gov (208) 287-2712
Paul Kline Idaho Department of Fish and Game (IDFG) Yes Interested Party paul.kline@idfg.idaho.gov (208) 287-2788
Christine Kozfkay Idaho Department of Fish and Game (IDFG) No Technical Contact christine.kozfkay@idfg.idaho.gov (208) 287-2789
Rachel Kutschera D J Warren and Associates, Inc. No Technical Contact rachel.kutschera@djwassociates.com (541) 929-4639
Solomonn Marsh Bonneville Power Administration Yes Contracting Officer spmarsh@bpa.gov (503) 230-3943
Jonathan McCloud Bonneville Power Administration Yes COR jmmccloud@bpa.gov (503) 230-3110
Jenna Peterson Bonneville Power Administration Yes Env. Compliance Lead jepeterson@bpa.gov (503) 230-3018
Mike Peterson Idaho Department of Fish and Game (IDFG) No Technical Contact mike.peterson@idfg.idaho.gov (208) 465-8404x234
Dan Warren D J Warren and Associates, Inc. No Technical Contact dan.warren@djwassociates.com (541) 929-4639
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Permits/Authorizations Acquired A: 165. Obtain Permits and submit copies to BPA NEPA group 09/30/2015 09/29/2015
Snake River sockeye RPA/BiOp data submission to IDFG project leader B: 202. Snake River sockeye RPA/BiOp Data 02/28/2015 01/19/2015
Maintain Springfield Fish Hatchery E: 61. Maintenance of grounds and buildings at Springfield Hatchery 09/30/2015 09/29/2015
Procure needed equipment and supplies for sockeye production at Springfield F: 61. Procurement of Hatchery Equipment and Supplies 09/30/2015 09/29/2015
Rear BY 13 juvenile sockeye salmon at Springfield FH G: 176. Rear BY 2013 Springfield sockeye production group 09/30/2015 05/08/2015
PIT tag BY 2013 Springfield sockeye production group with 50K PIT tags H: 158. Tag BY 2013 Springfield sockeye production group 04/17/2015 01/22/2015
Mark BYR 2014 Springfield sockeye production group I: 158. Tag BY 2014 Springfield sockeye production group 07/30/2015 07/03/2015
Rear BY 2014 juvenile sockeye salmon at Springfield FH J: 176. Rear BY 2014 Springfield sockeye production group 09/30/2015 09/29/2015
2015 Salmon River AOP K: 174. Salmon River Annual Operating Plan 04/30/2015 03/27/2015
Attendance at program essential and SBSTOC meetings. L: 189. Quarterly SBSTOC coordination meeting and program essential meetings. 09/30/2015 08/25/2015
Attach FY14 Progress Report in Pisces M: 132. Submit Progress Report for the period (OCT 2013) to (SEP 2014) 12/31/2014 12/31/2014
All administrative tasks fulfilled with timely quality products N: 119. Submit FY16 funding package to BPA 09/30/2015 09/30/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sockeye (O. nerka) - Snake River ESU (Endangered)
  • 1 instance of WE 34 Develop Alternative Water Source
  • 2 instances of WE 176 Produce Hatchery Fish
  • 3 instances of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
  • 2 instances of WE 158 Mark/Tag Animals

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Permits and submit copies to BPA NEPA group 10/01/2014
B 202 Snake River sockeye RPA/BiOp Data
C 61 Install chilled water supply temperature buffering system at Eagle Hatchery 10/15/2014
D 34 Minor modification to artesian well
E 61 Maintenance of grounds and buildings at Springfield Hatchery 10/01/2014
F 61 Procurement of Hatchery Equipment and Supplies 10/01/2014
G 176 Rear BY 2013 Springfield sockeye production group 10/01/2014
H 158 Tag BY 2013 Springfield sockeye production group 10/01/2014
I 158 Tag BY 2014 Springfield sockeye production group 10/01/2014
J 176 Rear BY 2014 Springfield sockeye production group 10/01/2014
K 174 Salmon River Annual Operating Plan 10/01/2014
L 189 Quarterly SBSTOC coordination meeting and program essential meetings. 10/01/2014
M 132 Submit Progress Report for the period (OCT 2013) to (SEP 2014) 10/01/2014
N 119 Submit FY16 funding package to BPA 10/01/2014
O 185 Periodic Status Reports for BPA 10/01/2014