Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 73548 REL 127: 2007-224-00 EXP CCT METHOW RESTORATION
Project Number:
Title:
Okanogan Subbasin Habitat Implementation Program (OSHIP)
Stage:
Complete
Area:
Province Subbasin %
Columbia Cascade Okanogan 100.00%
Contract Number:
73548 REL 127
Contract Title:
2007-224-00 EXP CCT METHOW RESTORATION
Contract Continuation:
Previous: Next:
73548 REL 91: 2007-224-00 EXP CCT METHOW RESTORATION
  • 90345: 2007-224-00 EXP TWISP RIVER LARGE WOOD AIRCRAFT SERVICES
  • 73548 REL 151: 2023-001-00 EXP CCT UCHP METHOW HAB RESTORATION
Contract Status:
Closed
Contract Description:
This contract is to conduct aquatic habitat improvement projects in the Methow Subbasin.  Projects to be implemented will primarily emphasize benefits to ESA listed spring Chinook, summer steelhead, and bull trout and secondarily to other salmonids and Pacific lamprey.  Work will include regular attendance of coordination meetings with project sponsors and oversight groups to ensure that work is conducted consistent with established needs and in coordination with other existing restoration efforts.

Projects prioritization is based on the 2014 EDT model run for the Methow Subbasin, the 2017 Regional Technical Team Biological Strategy and the Upper Columbia Salmon Recovery Boards prioritization.    

Work under this contract cycle will include:

•    Upper Twisp River large wood supplementation:  Implementation
•    Little Bridge Creek large and small wood supplementation:  Implementation
•    Devany side channel re-connection:  Secure permits for implementation in 2023
•    Methow River install LW at RM 54–56:  Land owner outreach
•    Ben Canyon Creek culvert:  Re-bid for construction in 2023

Additionally, CTCR will continue supporting public outreach and educate for local students and the general public about the importance of salmon recovery and habitat improvement in the Methow Valley.

Cultural resource surveys as required under Section 106 of the NHPA, unless previously completed prior to this contract period, will be completed by the Colville Confederated Tribes Cultural Resource staff.

CTCR staff funding allocated under this contract are for: Matt Young (CTCR Methow Contract Manager - contract management); and field technician staff are used as available to assist in field work.  Field work to be conducted during this contract period include implementation of wood supplementation projects in the Twisp watershed, pre-site assessments, and other data gathering activities to aid in project development.  
    
The contractor (CTCR), its designated agents, sub-consultants and project stakeholders will be available, responsive and will collaboratively address contract related issues during the term of the contract. Contract issues include but are not limited to technical, policy, regulatory, project management and associated elements related to the project. Successful execution of this contract is contingent on alignment of the preceding contract issues with the BPI and BPA contracting processes, project management plans, design review protocols (including but not limited to BPA RRT design review, and integration of input and comments from BPA).

CTCR Contract Manager and design consultants will cooperate, coordinate, collaborate, and maintain effective communication with BPA PM/COR, EC Lead, and BPA ETS, during the entire length of this design contract. CTCR and its subcontractors will address BPA comments and concerns, and the two entities will arrive at a mutual beneficial consensus.
Account Type(s):
Expense
Contract Start Date:
11/01/2021
Contract End Date:
10/31/2022
Current Contract Value:
$1,002,178
Expenditures:
$1,002,178

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
John Arterburn Colville Confederated Tribes No Interested Party john.arterburn@colvilletribes.com (509) 422-7424
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Joseph Connor Bonneville Power Administration Yes COR jwconnor@bpa.gov (503) 230-3172
Chris Fisher Colville Confederated Tribes No Supervisor chris.fisher@colvilletribes.com (509) 422-7427
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Billy Gunn Colville Confederated Tribes No Interested Party billy.gunn@colvilletribes.com (509) 422-7740
David Kaplowe Bonneville Power Administration Yes F&W Approver djkaplowe@bpa.gov (503) 230-5365
Matt Young Colville Confederated Tribes Yes Contract Manager matt.young.fnw@colvilletribes.com (509) 634-1024


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance Documentation A: 165. Produce Compliance Documentation 10/31/2022 10/31/2022
Methow Restoration Project Management B: 119. Project Management 10/31/2022 10/31/2022
Prioritized Project List C: 114. Project Identification and Selection Process & Coordination w/BPA 06/06/2022 06/06/2022
Watershed coordination D: 191. Methow Subbasin Coordination 10/31/2022 10/31/2022
Supplement large wood in the Upper Twisp River E: 29. Upper Twisp large wood supplementation 10/31/2022 10/31/2022
Supplement large wood in the Little Bridge Creek F: 29. Little Bridge Creek large and small wood supplementation 10/31/2022 10/31/2022
Install Fish passage structure G: 184. Ben Canyon Creek Road Culvert Replacement Project construction 10/31/2022 10/31/2022
Methow Valley Outreach and Education Annual Report H: 99. Methow Valley Public Outreach 10/31/2022 10/31/2022
Completed Annual Report Under Release 119 J: 132. No report is required per COR 10/31/2022 10/31/2022

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 114 Identify and Select Projects
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Produce Compliance Documentation
B 119 Project Management
C 114 Project Identification and Selection Process & Coordination w/BPA
D 191 Methow Subbasin Coordination
E 29 Upper Twisp large wood supplementation 12/05/2022
F 29 Little Bridge Creek large and small wood supplementation 12/05/2022
G 184 Ben Canyon Creek Road Culvert Replacement Project construction
H 99 Methow Valley Public Outreach
I 185 Periodic Status Reports for BPA
J 132 No report is required per COR