Province | Subbasin | % |
---|---|---|
Columbia Cascade | Okanogan | 100.00% |
Previous: | Next: |
---|---|
73548 REL 11: 2007-224-00 EXP CCT METHOW RESTORATION |
|
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Compliance Documentation | A: 165. Produce Compliance Documentation | 06/30/2019 | 06/30/2019 | |
Methow Restoration Project Management | B: 119. Project Management | 06/30/2019 | 06/30/2019 | |
Watershed coordination | C: 191. Methow Subbasin Coordination | 06/30/2019 | 06/30/2019 | |
Prioritized Project List | D: 114. Project Identification and Selection Process | 06/30/2019 | 06/30/2019 | |
Devany Side Channel/Instream Complexity Final Design | E: 175. Devany Side Channel/Aquatic Complexity Design | 06/30/2019 | ||
Side Channel Re-connection | F: 30. Devany Side Channel | 06/30/2019 | ||
Large wood instream structure | G: 29. Devany Aquatic Complexity | 06/30/2019 | ||
Silver Reach Instream Enhancements Final Design | H: 175. Silver Reach Instream Enhancements Design | 06/30/2019 | ||
Silver Reach Instream Structures | I: 29. Silver Reach Instream Enhancements Phase 2 | 06/30/2019 | ||
Final Design for Mission Beaver Dam Analogs (Buttermilk Creek) | J: 175. Mission Beaver Dam Analogs (Buttermilk Creek) Design | 05/31/2019 | 10/01/2018 | |
Beaver Dam Analogs | K: 29. Mission Beaver Dam Analogs (Buttermilk Creek) | 06/30/2019 | 06/30/2019 | |
Livestock Exclusion | L: 40. Mission Livestock Exclusion (Buttermilk Creek) | 06/30/2019 | 06/14/2019 | |
Final Design Mission Beaver Dam Analogs (Libby Creek) | M: 175. Mission Beaver Dam Analogs (Libby Creek) Design | 05/31/2019 | 10/01/2018 | |
Beaver Dam Analogs | N: 29. Mission Beaver Dam Analogs (Libby Creek) | 06/30/2019 | 06/30/2019 | |
Beavers relocated to the Methow basin. | O: 190. Beaver Relocation Project | 06/30/2019 | 06/30/2019 | |
Maltais Irrigation Well | P: 82. Maltais Irrigation Well | 06/30/2019 | ||
Elimination of Maltais Surface Diversion | Q: 84. Maltais Surface Diversion | 06/30/2019 | ||
Outreach and Education in the Methow Valley | R: 99. Methow Valley Public Outreach | 06/30/2019 | 06/30/2019 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Coho (O. kisutch) - Unspecified Population |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Produce Compliance Documentation | 07/01/2018 | ||||||
B | 119 | Project Management | 07/01/2018 | ||||||
C | 191 | Methow Subbasin Coordination | 07/01/2018 | ||||||
D | 114 | Project Identification and Selection Process | 07/01/2018 | ||||||
E | 175 | Devany Side Channel/Aquatic Complexity Design | |||||||
F | 30 | Devany Side Channel | |||||||
G | 29 | Devany Aquatic Complexity | |||||||
H | 175 | Silver Reach Instream Enhancements Design | |||||||
I | 29 | Silver Reach Instream Enhancements Phase 2 | |||||||
J | 175 | Mission Beaver Dam Analogs (Buttermilk Creek) Design | |||||||
K | 29 | Mission Beaver Dam Analogs (Buttermilk Creek) | 08/28/2018 | ||||||
L | 40 | Mission Livestock Exclusion (Buttermilk Creek) | 08/28/2018 | ||||||
M | 175 | Mission Beaver Dam Analogs (Libby Creek) Design | |||||||
N | 29 | Mission Beaver Dam Analogs (Libby Creek) | 08/28/2018 | ||||||
O | 190 | Beaver Relocation Project | 07/01/2018 | ||||||
P | 82 | Maltais Irrigation Well | 05/21/2019 | ||||||
Q | 84 | Maltais Surface Diversion | |||||||
R | 99 | Methow Valley Public Outreach | 07/01/2018 | ||||||
S | 185 | Periodic Status Reports for BPA | 07/01/2018 | ||||||
T | 132 | No report is required per COR | 07/01/2018 |