Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 73548 REL 34: 2007-224-00 EXP CCT METHOW RESTORATION
Project Number:
Title:
Okanogan Subbasin Habitat Implementation Program (OSHIP)
Stage:
Complete
Area:
Province Subbasin %
Columbia Cascade Okanogan 100.00%
Contract Number:
73548 REL 34
Contract Title:
2007-224-00 EXP CCT METHOW RESTORATION
Contract Continuation:
Previous: Next:
73548 REL 11: 2007-224-00 EXP CCT METHOW RESTORATION
Contract Status:
Closed
Contract Description:
The contractor (CTCR), its designated agents, sub-consultants and project stakeholders will be available, responsive and will collaboratively address contract related issues during the term of the contract. Contract issues include but are not limited to technical, policy, regulatory, project management and associated elements related to the project. Successful execution of this contract is contingent on alignment of the preceding contract issues with the BPI and BPA contracting processes, project management plans, design review protocols (including but not limited to BPA RRT design review, and integration of input and comments from BPA).

CTCR Contract Manager, CTCR's sponsor, and CTCR's design consultants will all cooperate, coordinate, collaborate, and maintain effective communication with BPA PM/COR, EC Lead, RRT Lead, and Hydraulic Engineer during the entire length of this contract with regards to project design.  CTCR and its subcontractors will address BPA comments and concerns, and the two entities will arrive at a mutual beneficial consensus. CTCR contract manager will upload all the subcontracts being executed under this contract.

This contract is to conduct aquatic habitat protection/restoration projects in the Methow Subbasin.  Projects to be implemented will primarily emphasize benefits to ESA listed spring chinook, summer steelhead, and bull trout and secondarily to other salmonids and Pacific lamprey. Work will include regular attendance of coordination meetings with project sponsors and oversight groups to ensure that work is conducted consistent with established needs and in coordination with other existing restoration efforts.

Work under this contract cycle will include: side channel connection to increase rearing habitat and habitat complexity; instream enhancements to increase aquatic complexity; irrigation system improvements to increase efficiency and reduce instream surface withdrawal and improve fish passage; beaver relocation and beaver dam analog placement to promote an increase in salmonid rearing habitat as well as to increase base flows and reduce water temperatures during the summer months;  livestock exclusion (fencing) to protect riparian areas as a precursor to beaver Dam Analog installation; and public outreach to educate local school students and the public at large as to the value of salmon recovery and habitat restortation in the Methow Valley.

Project design and implementation will be subcontracted to local sponsors; The Methow Salmon Recovery Foundation and Trout Unlimited Washington Water Project.  Delays resulting from private landowner negotiations, project revisions in response to new information containted in the recently completed Twisp to Carlton Reach Assessment, loss of key engineering personnel, and longer than anticipated NEPA analyses (including comment and review periods) for Okanogan Wenatchee NF's Mission Restoration Projects have resulted in the need to rescheduled several projects from contract 73548 Release 11 to this contract period.    

Cultural resource surveys as required under Section 106 of the NHPA, unless previously completed prior to this contract period, will be completed by the Colville Confederated Tribes Cultural Resource staff.


Account Type(s):
Expense
Contract Start Date:
07/01/2018
Contract End Date:
06/30/2019
Current Contract Value:
$285,523
Expenditures:
$285,523

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
John Arterburn Colville Confederated Tribes No Interested Party john.arterburn@colvilletribes.com (509) 422-7424
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Joseph Connor Bonneville Power Administration Yes COR jwconnor@bpa.gov (503) 230-3172
Chris Fisher Colville Confederated Tribes No Supervisor chris.fisher@colvilletribes.com (509) 422-7427
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Billy Gunn Colville Confederated Tribes No Administrative Contact billy.gunn@colvilletribes.com (509) 422-7740
Keith Kistler Colville Confederated Tribes Yes Interested Party keith.kistler@colvilletribes.com (509) 422-7429
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Kary Nichols Colville Confederated Tribes No Interested Party kary.nichols@colvilletribes.com (509) 422-4782
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
John Stensgar, Jr Colville Confederated Tribes No Interested Party lj.stensgar.fnw@colvilletribes.com (509) 634-2109
Matt Young Colville Confederated Tribes Yes Contract Manager matt.young.fnw@colvilletribes.com (509) 634-1024
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance Documentation A: 165. Produce Compliance Documentation 06/30/2019 06/30/2019
Methow Restoration Project Management B: 119. Project Management 06/30/2019 06/30/2019
Watershed coordination C: 191. Methow Subbasin Coordination 06/30/2019 06/30/2019
Prioritized Project List D: 114. Project Identification and Selection Process 06/30/2019 06/30/2019
Devany Side Channel/Instream Complexity Final Design E: 175. Devany Side Channel/Aquatic Complexity Design 06/30/2019
Side Channel Re-connection F: 30. Devany Side Channel 06/30/2019
Large wood instream structure G: 29. Devany Aquatic Complexity 06/30/2019
Silver Reach Instream Enhancements Final Design H: 175. Silver Reach Instream Enhancements Design 06/30/2019
Silver Reach Instream Structures I: 29. Silver Reach Instream Enhancements Phase 2 06/30/2019
Final Design for Mission Beaver Dam Analogs (Buttermilk Creek) J: 175. Mission Beaver Dam Analogs (Buttermilk Creek) Design 05/31/2019 10/01/2018
Beaver Dam Analogs K: 29. Mission Beaver Dam Analogs (Buttermilk Creek) 06/30/2019 06/30/2019
Livestock Exclusion L: 40. Mission Livestock Exclusion (Buttermilk Creek) 06/30/2019 06/14/2019
Final Design Mission Beaver Dam Analogs (Libby Creek) M: 175. Mission Beaver Dam Analogs (Libby Creek) Design 05/31/2019 10/01/2018
Beaver Dam Analogs N: 29. Mission Beaver Dam Analogs (Libby Creek) 06/30/2019 06/30/2019
Beavers relocated to the Methow basin. O: 190. Beaver Relocation Project 06/30/2019 06/30/2019
Maltais Irrigation Well P: 82. Maltais Irrigation Well 06/30/2019
Elimination of Maltais Surface Diversion Q: 84. Maltais Surface Diversion 06/30/2019
Outreach and Education in the Methow Valley R: 99. Methow Valley Public Outreach 06/30/2019 06/30/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 175 Produce Design
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 4 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 114 Identify and Select Projects
  • 4 instances of WE 175 Produce Design
  • 1 instance of WE 82 Install Well
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence
  • 2 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Produce Compliance Documentation 07/01/2018
B 119 Project Management 07/01/2018
C 191 Methow Subbasin Coordination 07/01/2018
D 114 Project Identification and Selection Process 07/01/2018
E 175 Devany Side Channel/Aquatic Complexity Design
F 30 Devany Side Channel
G 29 Devany Aquatic Complexity
H 175 Silver Reach Instream Enhancements Design
I 29 Silver Reach Instream Enhancements Phase 2
J 175 Mission Beaver Dam Analogs (Buttermilk Creek) Design
K 29 Mission Beaver Dam Analogs (Buttermilk Creek) 08/28/2018
L 40 Mission Livestock Exclusion (Buttermilk Creek) 08/28/2018
M 175 Mission Beaver Dam Analogs (Libby Creek) Design
N 29 Mission Beaver Dam Analogs (Libby Creek) 08/28/2018
O 190 Beaver Relocation Project 07/01/2018
P 82 Maltais Irrigation Well 05/21/2019
Q 84 Maltais Surface Diversion
R 99 Methow Valley Public Outreach 07/01/2018
S 185 Periodic Status Reports for BPA 07/01/2018
T 132 No report is required per COR 07/01/2018