Province | Subbasin | % |
---|---|---|
Columbia River Estuary | Columbia Estuary | 50.00% |
Elochoman | 5.00% | |
Grays | 5.00% | |
Lower Columbia | Columbia Lower | 30.00% |
Kalama | 5.00% | |
Sandy | 5.00% |
* Expenditures data includes accruals and are based on data through 31-Mar-2025.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Produce the Necessary Environmental Compliance | B: 165. Ensure All Environmental Compliance is Complete | 09/30/2017 | 09/30/2017 | |
All administrative tasks fulfilled with timely quality products | C: 119. Provide Management and Administration of Projects | 09/30/2017 | 09/30/2017 | |
Documentation Describing Priority Projects | D: 114. Identify Priority Land Acquisition and Restoration Projects | 09/30/2017 | 09/30/2017 | |
Final Realty Package for Priority Acquisitions | E: 172. Conduct All Necessary Due Diligence Related to Land Acquisition | 09/30/2017 | 09/30/2017 | |
Produce designs & engineering for estuary projects | F: 175. Produce Conceptual Designs and Preliminary Engineering for Estuary Restoration Projects | 09/30/2017 | 09/30/2017 | |
Restoration design analysis and engineering | G: 175. Restoration design analysis and engineering | 09/30/2017 | 09/30/2017 | |
Presentations attached in Pisces | H: 161. Presentations for Annual Land Trust Rally 2017 | 09/30/2017 | 09/30/2017 | |
Completed 2016 Annual Report uploaded to Pisces | I: 132. Submit Progress Report for the period Jan 2016 to Dec 2016 | 03/31/2017 | 03/31/2017 | |
Wallacut River Planting | N: 47. WALLACUT RIVER-- CONSTRUCTION-- Planting | 08/11/2017 | 08/11/2017 | |
Kerry Island Levee Removal | O: 180. KERRY ISLAND--CONSTRUCTION-- Remaining Levee Removal | 11/30/2016 | 11/30/2016 | |
Kerry Island Planting | P: 47. KERRY ISLAND--CONSTRUCTION-- Planting | 04/30/2017 | 03/31/2017 | |
Level 3 AEMR data-- Wallacut Post-construction | Q: 157. WALLACUT - Collect POST-Construction AEMR Level 3 data | 05/15/2017 | 05/15/2017 | |
Level 3 AEMR data-- Kerry Island Post-construction | R: 157. KERRY ISLAND - Collect POST-Construction AEMR Level 3 data | 09/30/2017 | 09/30/2017 | |
Level 3 AEMR data-- Lower Elochoman Pre-construction data | S: 157. LOWER ELOCHOMAN PHASE II - Collect PRE-Construction AEMR Level 3 data | 09/30/2017 | 09/30/2017 | |
Reimburse DIDCO for Legal and Design Review on CSR | U: 98. Reimburse DIDCO for Legal and Design Review on CSR | 09/30/2017 | 06/30/2017 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (Oncorhynchus tshawytscha) - All Populations |
|
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened) |
|
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened) |
|
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened) |
|
Coho (O. kisutch) - Unspecified Population |
|
Sockeye (Oncorhynchus nerka) - All Populations |
|
Steelhead (Oncorhynchus mykiss) - All Populations |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 09/01/2016 | ||||||
B | 165 | Ensure All Environmental Compliance is Complete | 09/01/2016 | ||||||
C | 119 | Provide Management and Administration of Projects | 09/01/2016 | ||||||
D | 114 | Identify Priority Land Acquisition and Restoration Projects | 09/01/2016 | ||||||
E | 172 | Conduct All Necessary Due Diligence Related to Land Acquisition | 09/01/2016 | ||||||
F | 175 | Produce Conceptual Designs and Preliminary Engineering for Estuary Restoration Projects | 10/01/2016 | ||||||
G | 175 | Restoration design analysis and engineering | 10/01/2016 | ||||||
H | 161 | Presentations for Annual Land Trust Rally 2017 | 09/01/2016 | ||||||
I | 132 | Submit Progress Report for the period Jan 2016 to Dec 2016 | 09/01/2016 | ||||||
J | 132 | Submit Data for estuary 2016 RME Report | 09/01/2016 | ||||||
K | 181 | **CCR-38968 CANCEL WE: LOWER ELOCHOMAN PHASE II--CONSTRUCTION-- Floodplain Contouring | |||||||
L | 180 | **CCR-38968 CANCEL WE: LOWER ELOCHOMAN PHASE II-- CONSTRUCTION-- Levee Removal | |||||||
M | 47 | **CCR-38968 CANCEL WE: LOWER ELOCHOMAN PHASE II--CONSTRUCTION-- Planting | |||||||
N | 47 | WALLACUT RIVER-- CONSTRUCTION-- Planting | 08/11/2016 | ||||||
O | 180 | KERRY ISLAND--CONSTRUCTION-- Remaining Levee Removal | 07/26/2016 | ||||||
P | 47 | KERRY ISLAND--CONSTRUCTION-- Planting | 07/26/2016 | ||||||
Q | 157 | WALLACUT - Collect POST-Construction AEMR Level 3 data | 10/01/2016 | ||||||
R | 157 | KERRY ISLAND - Collect POST-Construction AEMR Level 3 data | 10/01/2016 | ||||||
S | 157 | LOWER ELOCHOMAN PHASE II - Collect PRE-Construction AEMR Level 3 data | 10/01/2016 | ||||||
T | 157 | **CCR-38968 CANCEL WE: LOWER ELOCHOMAN PHASE II - Collect POST-Construction AEMR Level 3 data | 10/01/2016 | ||||||
U | 98 | Reimburse DIDCO for Legal and Design Review on CSR | 10/20/2016 |