Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 73982 REL 10: 1995-060-01 EXP ISQUULKTPE WATERSHED AREA: PROTECT AND ENHANCE
Project Number:
Title:
Isqúulktpe Watershed Project
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Umatilla 100.00%
Contract Number:
73982 REL 10
Contract Title:
1995-060-01 EXP ISQUULKTPE WATERSHED AREA: PROTECT AND ENHANCE
Contract Continuation:
Previous: Next:
71632: 1995-060-01 EXP ISQUULKTPE WATERSHED PROJECT (OPERATE & ENHANCE)
  • 73982 REL 26: 1995-060-01 EXP ISQUULKTPE WATERSHED AREA: PROTECT AND ENHANCE
Contract Status:
Closed
Contract Description:
Summary: This contract supports the continuation of management activities on the Isqúulktpe Watershed Project, and provides direction and support for planned implementation actions during the contract period.  Many of the major tasks are annual in nature, and contribute to ongoing protection and enhancement of the fish and wildlife habitat values, and the ecosystem health and function, desired within the watershed.

Project activities typically focus on the following activities: 1) Planning and Design; 2) Construction and Implementation; 3) Operations and Maintenance; and 4) limited, site-specific Monitoring and Evaluation.  Management efforts undertaken under this contract are designed to promote watershed health and ecosystem function, protect, enhance and mitigate target wildlife mitigation species, and nurture self-sustaining habitats for fish and wildlife.  

Status:  The current SOW provides direction for actions planned or implemented during the contract period. Recurrent management priorities reflected as ongoing activities include:
  --  Administer and operate the watershed habitat area
  --  Renew grazing leases to provide rest from livestock grazing
  --  Monitor and maintain existing fence to control trespass livestock
  --  Maintain wildlife water facilities and spring exclosures
  --  Continue monitoring and treatment strategies to control and eradicate weeds
  --  Continue treatment of Himalayan blackberry, which out-competes desirable vegetation
  --  Maintain seasonal road closure to protect habitat for spawning steelhead
  --  Continue efforts to control sulfur cinquefoil, and re-vegetate with native plants
  --  Plant native grasses and shrubs on previously treated blackberry control sites

Added management actions, newly initiated work, or activities expected to be expanded during the contract period include the following tasks/purposes (2017):
  --  Improve forest habitat on approximately 150 acres on and adjacent to Telephone Ridge, continue thinning and develop contract for hand-piling of woody biomass for FY18
  --  Fence to enclose approximately 0.5 acre of aspen habitat that is unable to regenerate due to heavy ungulate browsing (continue from 2016, no bids received for the work)
  --  Initiate trial of Pseudomonas bacteria to control Medusahead rye (invasive grass specie)
  --  Rehabilitate section of Isqúulktpe Creek where it has washed out the road, restore access to the wildlife area parking and kiosks, improve public access and displays, improve stream and riparian habitat
__________________________________________________________________________________

Background:  The Isqúulktpe Creek watershed is a fifth-order subbasin located in the Umatilla River Basin, encompassing approximately 24,200 acres.  Located on the western slopes of the Blue Mountains in Oregon, Isqúulktpe (formerly known as Squaw) Creek, drains into the Umatilla River upstream of Pendleton, Oregon.  Topography of the Isqúulktpe Watershed is typical of the Blue Mountain foothills, with broad flat ridges dissected by steep canyons with a wide variety of aspects.

The CTUIR developed the Isqúulktpe Watershed Project under the Columbia Basin Fish and Wildlife Program in 1995.  (Note: In 2009, the spelling of the project title was changed from Iskuulpa to Isqúulktpe.)  The purpose of the project is to offset habitat losses from, and provide in-kind mitigation for, the impacts of construction and operation of the John Day and McNary hydroelectric projects.  The Project emphasizes two principle strategies for acquiring, protecting, and enhancing habitat to meet these project purposes: fee acquisitions; and the leasing of Bureau of Indian Affairs (BIA) administered grazing allotments, and resting them from livestock use.
Account Type(s):
Expense
Contract Start Date:
02/01/2017
Contract End Date:
01/31/2018
Current Contract Value:
$205,751
Expenditures:
$205,751

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration A: 119. Project Implementation Management and Contract Administration 01/31/2018 01/31/2018
Documentation and assistance for environmental and cultural resource clearances B: 165. Environmental Compliance Clearance for site maintenance and habitat enhancements 01/31/2018 01/31/2018
Rest 11,219 grassland acres from livestock grazing C: 92. Livestock Grazing Lease (BIA): annual payment 10/31/2017 10/31/2017
Livestock exclusion D: 26. Prevent trespass by unauthorized livestock 12/31/2017 12/27/2017
20 miles of intact fence E: 186. Monitor and maintain existing range unit boundary fence 01/16/2018 12/27/2017
Maintain fire response capability and other protection measures F: 186. Fire Protection and Response Services (Statewide Assessment) 01/31/2018 01/31/2018
Regulate public access and provide visitor information G: 188. Provide and regulate public access 01/31/2018 01/31/2018
Noxious weeds treated on >75 acres, 27 road and riparian miles surveyed H: 198. Control and monitor noxious weeds 01/31/2018 12/20/2017
Establish native plants I: 47. Revegetate invasive plant treatment sites 01/31/2018 01/31/2018
Blackberry removed on up to 24 acres J: 199. Remove blackberry in lower Isqúulktpe Creek 01/31/2018 12/20/2017
Install fence around aspen stand L: 40. Install fence to protect and recover aspen habitat 01/31/2018 11/17/2017
Thin forest stands in telephone ridge area M: 199. Thinning to improve forest habitat 12/31/2017 10/13/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 38 Improve Road for Instream Habitat Benefits
Wildlife
  • 1 instance of WE 198 Maintain Vegetation
  • 2 instances of WE 199 Remove Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 38 Improve Road for Instream Habitat Benefits
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 92 Lease Land
  • 1 instance of WE 115 Produce Inventory or Assessment

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Project Implementation Management and Contract Administration 02/01/2017
B 165 Environmental Compliance Clearance for site maintenance and habitat enhancements 02/01/2017
C 92 Livestock Grazing Lease (BIA): annual payment 02/01/2017
D 26 Prevent trespass by unauthorized livestock 02/01/2017
E 186 Monitor and maintain existing range unit boundary fence 02/01/2017
F 186 Fire Protection and Response Services (Statewide Assessment) 02/01/2017
G 188 Provide and regulate public access 02/01/2017
H 198 Control and monitor noxious weeds 10/23/2017
I 47 Revegetate invasive plant treatment sites 02/01/2017
J 199 Remove blackberry in lower Isqúulktpe Creek 10/23/2017
K 199 Apply bacterium Pseudomonas fluroescens to invaded grassland community 02/01/2017
L 40 Install fence to protect and recover aspen habitat 02/01/2017
M 199 Thinning to improve forest habitat 02/01/2017
N 38 Repair road washout and improve habitat
O 185 Periodic Status Reports for BPA 02/01/2017
P 115 [DEFER] Assess Vegetation Trends to Monitor Changing Habitat Conditions (do not delete) 02/01/2017
Q 132 [Deliverable due next period] Progress Report (2-year): 2016 and 2017 (02/01/2016 - 01/31/2018) 02/01/2017
R 132 [DEFER] Progress Report (2-year): 2016 and 2017 (02/01/2016 - 01/31/2018) 02/01/2017