Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 73982 REL 48: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 18
Project Number:
Title:
CTUIR Grand Ronde Watershed Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
73982 REL 48
Contract Title:
1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 18
Contract Continuation:
Previous: Next:
72551: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 16
  • 73982 REL 75: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 2019
Contract Status:
Closed
Contract Description:
The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Grande Ronde Subbasin Restoration Project (199608300) was initiated in 1996 to develop and implement a fish habitat program that contributes to the mitigation of Snake River Basin salmon and steelhead losses associated with the Federal Columbia River Hydropower System (FCRPS) and recovery of ESA anadromous fish.  The project works collaboratively with multiple agencies, organizations, and private landowners to identify, prioritize, plan, design, implement, maintain, and monitor tributary fish habitat restoration and enhancement projects.  The Project  embraces the goals of the CTUIR established in its’ Columbia Basin Salmon Policy (CTUIR, 1995) River Vision (Jones, et. al., 2008), Wykan-Ush-Me Wa Kush, Spirit of the Salmon (CRITFC, 1995), and is tiered to the Northwest Power Planning Council Fish and Wildlife Program as amended(NPPC, 2009), Grande Ronde Subbasin Plan (NPPC, 2004), Draft Recovery Plan For Oregon Spring/Summer Chinook Salmon And Steelhead Populations In The Snake River Chinook Salmon Evolutionary Significant Unit And Snake River Steelhead Distinct Population Segment (NMFS, 2010), and the Federal Columbia River Power System Biological Opinion (FCRPS BiOP), (NMFS, 2008).  The CTUIR propose ongoing fish habitat protection, enhancement, maintenance, and monitoring under the Project to achieve the primary goal of protecting habitat and restoring/enhancing degraded habitats to support the recovery of focal species. Project staff participates in BiOp remand efforts in the Basin, including the BiOp expert panel, recovery planning, and technical review and planning team.  Work under the project is directly linked to the CTUIR-BPA Accord.

In FY 2018 the project will be focused on planning, design, and implementation of fish habitat enhancement projects along Catherine Creek and Upper Grande Ronde and tributaries. Project implementation for summer and fall/winter 2018 include: 1) Rock Creek phase 3 implementation, 2) Bird Track Springs Fish Habitat Enhancement Project implementation, and 3) Middle Upper Grande Ronde (MUGRR) Fish Habitat Enhancement Project.

Project planning and design includes: 1) Winter Canyon, 2) Birdtrack Springs, Grande Ronde River, and 3)  Grande Ronde Tributaries.

Project staff will continue to work on developing new project opportunities in Catherine Creek, Grande Ronde River, and tributaries.

Land acquisition planning will continue during FY2018 with identification and development of acquisition opportunities.

Project staff will continue to coordinate with project partners in the development and prioritization of BiOp and Accord fish habitat projects and develop future project opportunities.
Account Type(s):
Expense
Contract Start Date:
05/01/2018
Contract End Date:
04/30/2019
Current Contract Value:
$1,407,767
Expenditures:
$1,407,767

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Receipt of environmental compliance clearance from BPA. A: 165. Complete and/or initiate Environmental Permitting for Project Activities 04/30/2019 04/30/2019
Effective implementation management and timely contract administration B: 119. Phase 3 Rock Creek Project Administration 04/30/2019 11/09/2018
Construct meandering stream channel C: 30. Construct Rock Creek Restoration Channel 10/30/2018 10/31/2018
Install large wood complexes and habitat boulders to increase habitat complexity and diversity D: 29. Install Large Wood Complexes and habitat boulders along Rock Creek 10/30/2018 11/02/2018
Conduct Fish Salvage Operations E: 28. Conduct Fish Salvage Operations on the Rock Creek Phase III Project 10/15/2018 10/15/2018
Remove draw bottom road F: 33. Obliterate draw bottom road along Rock Creek 10/30/2018 11/09/2018
Plant native trees, shrubs, and grass on the Rock Creek Phase III Project G: 47. Plant native trees, shrubs, and grasses on the Rock Creek Project 04/30/2019 04/30/2019
Effective implementation management and timely contract administration H: 119. Bird Track Springs Fish Habitat Enhancement Project Administration 04/30/2019 04/30/2019
Conduct Fish Salvage Operations I: 28. Conduct Fish Salvage Operations on the Bird Track Springs Project 10/15/2018 10/15/2018
Plant native trees, shrubs, and grass on the Bird Track Springs Project J: 47. Plant native trees, shrubs, and grasses on the Bird Track Springs Project 04/30/2019 11/30/2018
Effective implementation management and timely contract administration K: 119. Middle Upper Grande Ronde (MUGRR) Fish Habitat Enhancement Project Administration 04/30/2019 04/30/2019
Conduct maintenance on McCoy, Dark Canyon, Meadow, Willow, Rock, and Catherine Creek Projects N: 186. Maintain instream structures, fences, and off-channel water developments 04/30/2019 04/30/2019
Maintain vegetation and control weeds on conservation projects O: 198. Maintain Vegetation and Control Weeds on conservation projects 04/30/2019 04/30/2019
Complete outreach & education activities P: 99. Public Outreach and Education 04/30/2019 04/30/2019
Conduct ongoing project development and coordination activities Q: 114. CTUIR Grande Ronde Subbasin Restoration Coordination 04/30/2019 04/30/2019
BiOp Fish Habitat Project Opportunity Development and Review R: 114. Solicit, review and select BiOp expense & capital projects 04/30/2019 04/30/2019
Develop project design plan sets. S: 174. Develop project designs and produce plans 04/30/2019 04/30/2019
Administer Project T: 119. Manage and Administer CTUIR GR Subbasin Restoration Project 04/30/2019 04/30/2019
Upload 2018 Annual Report U: 132. 2018 Annual Report - May 2018 - April 2019 04/30/2019 04/30/2019
Completed bridge installation W: 184. Replace -5500 Sheep Creek Culvert on USFS Lands 10/15/2018 10/15/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 3 instances of WE 28 Trap and Haul
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 33 Decommission Road/Relocate Road
  • 3 instances of WE 47 Plant Vegetation
  • 1 instance of WE 184 Install Fish Passage Structure
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 198 Maintain Vegetation
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 47 Plant Vegetation
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 3 instances of WE 28 Trap and Haul
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 33 Decommission Road/Relocate Road
  • 2 instances of WE 47 Plant Vegetation
  • 1 instance of WE 184 Install Fish Passage Structure
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 184 Install Fish Passage Structure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete and/or initiate Environmental Permitting for Project Activities 05/01/2018
B 119 Phase 3 Rock Creek Project Administration 05/01/2018
C 30 Construct Rock Creek Restoration Channel 08/15/2018
D 29 Install Large Wood Complexes and habitat boulders along Rock Creek 08/15/2018
E 28 Conduct Fish Salvage Operations on the Rock Creek Phase III Project 08/15/2018
F 33 Obliterate draw bottom road along Rock Creek 08/15/2018
G 47 Plant native trees, shrubs, and grasses on the Rock Creek Project 08/15/2018
H 119 Bird Track Springs Fish Habitat Enhancement Project Administration 05/01/2018
I 28 Conduct Fish Salvage Operations on the Bird Track Springs Project 09/18/2019
J 47 Plant native trees, shrubs, and grasses on the Bird Track Springs Project 08/15/2018
K 119 Middle Upper Grande Ronde (MUGRR) Fish Habitat Enhancement Project Administration 05/01/2018
L 47 Plant native trees, shrubs, and grasses on the Middle Upper Grande Ronde Project 08/15/2018
M 28 Conduct Fish Salvage Operations on the Middle Upper Grande Ronde Project 09/18/2019
N 186 Maintain instream structures, fences, and off-channel water developments 08/15/2018
O 198 Maintain Vegetation and Control Weeds on conservation projects 09/18/2019
P 99 Public Outreach and Education 05/01/2018
Q 114 CTUIR Grande Ronde Subbasin Restoration Coordination 05/01/2018
R 114 Solicit, review and select BiOp expense & capital projects 05/01/2018
S 174 Develop project designs and produce plans 08/15/2018
T 119 Manage and Administer CTUIR GR Subbasin Restoration Project 05/01/2018
U 132 2018 Annual Report - May 2018 - April 2019 05/01/2018
V 185 Quarterly Status Reports 05/01/2018
W 184 Replace -5500 Sheep Creek Culvert on USFS Lands 09/18/2019