Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 72551: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 16
Project Number:
Title:
CTUIR Grand Ronde Watershed Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
72551
Contract Title:
1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 16
Contract Continuation:
Previous: Next:
69118: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 15
  • 73982 REL 48: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 18
Contract Status:
Closed
Contract Description:
The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Grande Ronde Subbasin Restoration Project (199608300) was initiated in 1996 to develop and implement a fish habitat program that contributes to the mitigation of Snake River Basin salmon and steelhead losses associated with the Federal Columbia River Hydropower System (FCRPS) and recovery of ESA anadromous fish.  The project works collaboratively with multiple agencies, organizations, and private landowners to identify, prioritize, plan, design, implement, maintain, and monitor tributary fish habitat restoration and enhancement projects.  The Project  embraces the goals of the CTUIR established in its’ Columbia Basin Salmon Policy (CTUIR, 1995) River Vision (Jones, et. al., 2008), Wykan-Ush-Me Wa Kush, Spirit of the Salmon (CRITFC, 1995), and is tiered to the Northwest Power Planning Council Fish and Wildlife Program as amended(NPPC, 2009), Grande Ronde Subbasin Plan (NPPC, 2004), Draft Recovery Plan For Oregon Spring/Summer Chinook Salmon And Steelhead Populations In The Snake River Chinook Salmon Evolutionary Significant Unit And Snake River Steelhead Distinct Population Segment (NMFS, 2010), and the Federal Columbia River Power System Biological Opinion (FCRPS BiOP), (NMFS, 2008).  The CTUIR propose ongoing fish habitat protection, enhancement, maintenance, and monitoring under the Project to achieve the primary goal of protecting habitat and restoring/enhancing degraded habitats to support the recovery of focal species. Project staff participates in BiOp remand efforts in the Basin, including the BiOp expert panel, recovery planning, and technical review and planning team.  Work under the project is directly linked to the CTUIR-BPA Accord.

In FY 2016 the project will be focused on planning, design, and implementation of fish habitat enhancement projects along Catherine Creek and Upper Grande Ronde and tributaries.  Project implementation for summer and fall/winter 2016 include: 1) Catherine Creek, CC44 Phase 3 completion and 2) Rock Creek phase 3 implementation.  Fish passage project work with the USFS on Sheep Creek will continue into FY16 with construction and completion of the Sheep Creek culvert replacement construction.

Project planning and design includes: 1) Catherine Creek CC42; 2) Birdtrack Springs, Grande Ronde River, and 3) Upper Rock Creek and Grande Ronde Tributaries.

Project staff will continue to work on developing new project opportunities in Catherine Creek, Grande Ronde River, and tributaries.

Land acquisition planning will continue during FY2016 with identification and development of acquisition opportunities.

Project staff will continue to coordinate with project partners in the development and prioritization of BiOp and Accord fish habitat projects and develop future project opportunities.
Account Type(s):
Expense
Contract Start Date:
05/01/2016
Contract End Date:
04/30/2018
Current Contract Value:
$1,654,191
Expenditures:
$1,654,191

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Julie Burke Umatilla Confederated Tribes (CTUIR) Yes Administrative Contact julieburke@ctuir.org (541) 429-7292
Kevin Cannell Bonneville Power Administration No Interested Party kgcannell@bpa.gov (503) 230-4454
Allen Childs Umatilla Confederated Tribes (CTUIR) Yes Contract Manager allenchilds@ctuir.org (541) 429-7940
Catherine Dickson Umatilla Confederated Tribes (CTUIR) No Technical Contact catherinedickson@ctuir.org (542) 429-7231
Daniel Gambetta Bonneville Power Administration Yes Interested Party dagambetta@bpa.gov (503) 230-3493
Stephanie Green Bonneville Power Administration Yes Contracting Officer sagreen@bpa.gov (360) 418-2710
Tracy Hauser Bonneville Power Administration Yes COR tlhauser@bpa.gov (503) 230-4296
Gary James Umatilla Confederated Tribes (CTUIR) No Interested Party garyjames@ctuir.org (541) 429-7285
Travis Kessler Bonneville Power Administration No Env. Compliance Lead tdkessler@bpa.gov (503) 230-5468
Jake Kimbro Umatilla Confederated Tribes (CTUIR) Yes Interested Party jakekimbro@ctuir.org (541) 429-7941
Michael Lambert Umatilla Confederated Tribes (CTUIR) Yes Supervisor mikelambert@ctuir.org (541) 429-7240
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
John Skidmore Bonneville Power Administration Yes F&W Approver jtskidmore@bpa.gov (503) 230-5494
Jesse Steele Grande Ronde Model Watershed Foundation No Interested Party jesse@grmw.org (541) 663-0570
Connar Stone Grande Ronde Model Watershed Foundation No Interested Party connar@grmw.org (541) 663-0570
Ian Wilson Umatilla Confederated Tribes (CTUIR) Yes Interested Party ianwilson@ctuir.org (541) 429-7994
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Receipt of environmental compliance clearance from BPA. A: 165. Complete and/or initiate Environmental Permitting for Project Activities 04/30/2018 04/30/2018
Receipt of environmental compliance clearance from BPA. B: 165. Rock Creek Fish Habitat Enhancement Project EC requirements 04/30/2018 04/30/2018
All administrative tasks fulfilled with timely quality products C: 119. Phase 3 Rock Creek Project Administration 04/30/2018
Install large wood complexes and habitat boulders to increase habitat complexity and diversity D: 29. Install Large Wood Complexes and habitat boulders along Rock Creek 04/30/2018
Construct meandering stream channel E: 30. Construct Rock Creek Restoration Channel 04/30/2018
Remove draw bottom road F: 33. Obliterate draw bottom road along Rock Creek 04/30/2018
All administrative tasks fulfilled with timely quality products G: 119. Southern Cross Conservation Property Fish Habitat Enhancement Project Administration 04/30/2017 09/30/2016
Construct Riparian Conservation Easement Fences H: 40. Install Riparian Fences on Cunha Easement along Dark Canyon and Meadow Creeks 06/23/2017 06/23/2017
Construct Riparian and Property Fences I: 40. Install Fences on Catherine Creek Conservation Projects 06/30/2017 06/30/2017
Plant native trees, shrubs, and grass on the CC44 Southern Cross Project J: 47. Plant native trees, shrubs, and grasses CC44 Southern Cross Conservation Property 04/30/2017 11/11/2016
Conduct Fish Salvage Operations K: 28. Conduct Fish Salvage operations on the CC44 Project 08/15/2016 08/15/2016
Replace undersized culvert on Sheep Creek L: 184. Conduct site survey, prepare design and install culvert on Sheep Creek 04/30/2017 09/30/2016
Survey & Design for Limber Creek culverts M: 175. Conduct site survey & prepare culvert designs Limber Jim Creek/North Fork Limber Ck 04/30/2017 10/28/2016
Conduct maintenance on McCoy, Dark Canyon, Meadow, Willow, Rock, and Catherine Projects N: 186. Maintain instream structures, fences, and off-channel water developments 04/30/2018 04/30/2018
Maintain vegetation and control weeds on conservation projectst O: 198. Maintain Vegetation and Control Weeds on conservation projects 04/30/2018 04/30/2018
Complete outreach & education activities P: 99. Public Outreach and Education 04/30/2018 04/30/2018
Conduct ongoing project development and coordination activities Q: 114. CTUIR Grande Ronde Subbasin Restoration Coordination 04/30/2018 04/30/2018
BiOp Fish Habitat Project Opportunity Development and Review R: 114. Solicit, review and select BiOp expense & capital projects 04/30/2018 04/30/2018
Develop project design plan sets. S: 174. Develop project designs and produce plans 04/30/2018 04/30/2018
Administer Project T: 119. Manage and Administer CTUIR GR Subbasin Restoration Project 04/30/2018 04/30/2018
Upload 2016 Annual Report U: 132. 2016 Annual Report - May 2016 - April 2017 04/30/2017 06/30/2017
Upload 2017 Annual Report W: 132. 2017 Annual Report - May 2017 - April 2018 04/30/2018 04/30/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 33 Decommission Road/Relocate Road
  • 2 instances of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 184 Install Fish Passage Structure
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 175 Produce Design
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 28 Trap and Haul
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 28 Trap and Haul
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 33 Decommission Road/Relocate Road
  • 2 instances of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 184 Install Fish Passage Structure
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete and/or initiate Environmental Permitting for Project Activities 05/01/2016
B 165 Rock Creek Fish Habitat Enhancement Project EC requirements 05/01/2016
C 119 Phase 3 Rock Creek Project Administration 05/01/2016
D 29 Install Large Wood Complexes and habitat boulders along Rock Creek
E 30 Construct Rock Creek Restoration Channel
F 33 Obliterate draw bottom road along Rock Creek
G 119 Southern Cross Conservation Property Fish Habitat Enhancement Project Administration 05/01/2016
H 40 Install Riparian Fences on Cunha Easement along Dark Canyon and Meadow Creeks 07/04/2016
I 40 Install Fences on Catherine Creek Conservation Projects 05/01/2016
J 47 Plant native trees, shrubs, and grasses CC44 Southern Cross Conservation Property 05/01/2016
K 28 Conduct Fish Salvage operations on the CC44 Project 05/01/2016
L 184 Conduct site survey, prepare design and install culvert on Sheep Creek 03/17/2016
M 175 Conduct site survey & prepare culvert designs Limber Jim Creek/North Fork Limber Ck 03/17/2016
N 186 Maintain instream structures, fences, and off-channel water developments 05/01/2016
O 198 Maintain Vegetation and Control Weeds on conservation projects 05/01/2016
P 99 Public Outreach and Education 05/01/2016
Q 114 CTUIR Grande Ronde Subbasin Restoration Coordination 05/01/2016
R 114 Solicit, review and select BiOp expense & capital projects 05/01/2016
S 174 Develop project designs and produce plans 05/01/2016
T 119 Manage and Administer CTUIR GR Subbasin Restoration Project 05/01/2016
U 132 2016 Annual Report - May 2016 - April 2017 05/01/2016
V 185 Quarterly Status Reports for BPA 05/01/2016
W 132 2017 Annual Report - May 2017 - April 2018 05/01/2016