Contract 74017 REL 20: 2010-003-00 EXP LOWER SOUTH FORK CLEARWATER RIVER WATERSHED
Project Number:
Title:
Lower South Fork Clearwater/Slate Creek Watershed Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
74017 REL 20
Contract Title:
2010-003-00 EXP LOWER SOUTH FORK CLEARWATER RIVER WATERSHED
Contract Continuation:
Previous: Next:
75330: 2010-003-00 EXP LOWER SOUTH FORK CLEARWATER/SLATE CREEK WATERSHED
  • 74017 REL 43: 2010-003-00 EXP LOWER SOUTH FORK CLEARWATER RIVER WATERSHED
Contract Status:
Closed
Contract Description:
Contract History:

This project is implemented as part of the Nez Perce-Clearwater National Forests (NPCNF)/Nez Perce Tribe (NPT) restoration partnership.  This project represents a merger of two ongoing Bonneville Power Administration (BPA) and NPT restoration projects, Slate Creek Watershed Restoration (2007-064-00)  and Lower South Fork Clearwater Restoration (2010-003-00).  The restoration partnership has been ongoing in the basin since 1996 and this project unification greatly increases the geographic area covered, and enhances the administrative and financial efficiency in order to maximize the direct benefit to fish and wildlife.

The goal of the project is to restore the physical and biological characteristics of the watershed to provide quality habitat for anadromous and resident fish species that support the historical, cultural, and economic practices of the Nez Perce Tribe.  The South Fork Clearwater River/Slate Creek watersheds contain designated critical habitat for Snake River steelhead trout, bull trout, and has moderate habitat potential for Spring Chinook salmon.  Restoration follows a ridge top to ridge top approach with implementation focused on restoring riparian processes by addressing increased water temperatures, increased sedimentation, cattle grazing effects, aquatic habitat connectivity, and exotic, invasive plants.  The cost share for this project has been contributed by the NPCNF who provides at least a 20% match including cash and in-kind contributions for environmental compliance, contract preparation, administration, and technical oversight.  

FY 18 implementation includes 1 culvert replacement (to improve fish passage and hydrologic capacity, reduce potential sediment delivery and provide connectivity),  1 design to reconnect the floodplain and add off-channel fish habitat, 1 trail crossing restoration project to restore riparian conditions and reduce sediment, 2 passage barrier culvert replacement designs, fence replacement to maintain riparian meadow exclosures, riparian planting (to decrease water temperatures and reduce potential sediment delivery), fence maintenance (to protect riparian plants), and continued planning and coordination for next year's projects and out-year habitat improvements.  NPT Watershed personnel will also continue an inventory of roads and stream crossings throughout the Lower South Fork Clearwater River/Slate Creek watersheds in order to identify fish passage barriers and road associated risks to aquatic species.
Account Type(s):
Expense
Contract Start Date:
02/01/2018
Contract End Date:
01/31/2019
Current Contract Value:
$908,573
Expenditures:
$908,573

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Anthony Broncheau Nez Perce Tribe No Interested Party anthonyb@nezperce.org (208) 843-7317
Marcie Carter Nez Perce Tribe Yes Supervisor marciec@nezperce.org (208) 621-3534
Miranda Gordon Nez Perce Tribe Yes Contract Manager mirandag@nezperce.org (208) 621-3547
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Jenifer Harris Nez Perce Tribe No Interested Party jeniferh@nezperce.org (208) 983-1290
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Mark Johnson Nez Perce Tribe Yes Contract Manager markj@nezperce.org (208) 621-3561
Jennifer Lord Bonneville Power Administration Yes COR jklord@bpa.gov (503) 230-5192
Heidi McRoberts Nez Perce Tribe Yes Supervisor heidim@nezperce.org (208) 621-3548
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Robert Shull Bonneville Power Administration Yes Env. Compliance Lead rwshull@bpa.gov (503) 230-3962
Emmit Taylor, Jr. Nez Perce Tribe No Supervisor emmitt@nezperce.org (208) 621-3544
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental compliance documentation submitted to BPA A: 165. Provide environmental compliance information to BPA for projects 01/31/2019 01/31/2019
Culvert replaced B: 184. Replace Moose Creek Culvert 11/01/2018 09/30/2018
Fence Replaced- McComas Meadows C: 40. Replace Fence - McComas Meadows 10/01/2018 07/12/2018
Floodplain Restoration Design D: 175. South Fork Clearwater River Floodplain Restoration Design 01/01/2019 12/31/2018
Replacement Final Designs E: 175. Whiskey Creek Culvert Replacement Design 12/01/2018 12/03/2018
Replacement Final Design F: 175. Greek Creek Culvert Replacement Design 01/31/2019 01/30/2019
Replacement Final Design G: 175. Peter Ready Creek Culvert Replacement Design 01/31/2019 01/30/2019
Riparian Vegetation Planted H: 47. Plant Riparian Vegetation - Previous Restoration Projects 01/31/2019 12/03/2018
Exclosure Fence Maintained I: 186. Maintain Exclosure Fences - Mill Creek 07/01/2018 07/31/2018
Exclosure fence maintained J: 186. Maintain Exclosure Fences - McComas Meadows 07/01/2018 07/02/2018
Potential Passage Barrier Inventory K: 115. Assess and Inventory Potential Passage Barriers 01/31/2019 12/31/2018
Road Inventory L: 115. Assess Condition of Roads to Identify Aquatic Impacts 01/31/2019 12/31/2018
Manage Projects and Administrative duties M: 119. Management, Coordination, and Communication 01/31/2019 12/31/2018
Upload 2018 Annual Report to Pisces O: 132. 2018 Annual Report - 2/1/2018 - 1/31/2019 01/31/2019 01/31/2019
Upload 2017 Annual Report to Pisces P: 132. Finalize 2017 Annual Report - 3/1/2017 - 1/31/2018 01/31/2019 02/01/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 184 Install Fish Passage Structure
  • 2 instances of WE 115 Produce Inventory or Assessment
  • 4 instances of WE 175 Produce Design
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 184 Install Fish Passage Structure
  • 2 instances of WE 115 Produce Inventory or Assessment
  • 4 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Provide environmental compliance information to BPA for projects 02/01/2018
B 184 Replace Moose Creek Culvert 04/18/2019
C 40 Replace Fence - McComas Meadows 11/01/2017
D 175 South Fork Clearwater River Floodplain Restoration Design 11/01/2017
E 175 Whiskey Creek Culvert Replacement Design 11/01/2017
F 175 Greek Creek Culvert Replacement Design 11/01/2017
G 175 Peter Ready Creek Culvert Replacement Design 11/01/2017
H 47 Plant Riparian Vegetation - Previous Restoration Projects 11/01/2017
I 186 Maintain Exclosure Fences - Mill Creek 11/01/2017
J 186 Maintain Exclosure Fences - McComas Meadows 02/01/2018
K 115 Assess and Inventory Potential Passage Barriers 11/01/2017
L 115 Assess Condition of Roads to Identify Aquatic Impacts 11/01/2017
M 119 Management, Coordination, and Communication 02/01/2018
N 185 Periodic Status Reports for BPA 02/01/2018
O 132 2018 Annual Report - 2/1/2018 - 1/31/2019 02/01/2018
P 132 Finalize 2017 Annual Report - 3/1/2017 - 1/31/2018 02/01/2018