Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74313 REL 54: 1992-026-01 EXP CC STATE PARK FISH HABITAT RESTORATION
Project Number:
Title:
Grande Ronde Model Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
74313 REL 54
Contract Title:
1992-026-01 EXP CC STATE PARK FISH HABITAT RESTORATION
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
Catherine Creek State Park is located at RM 48.5-49.2 on Catherine Creek, tributary to the Grande Ronde River in Union County Oregon, within Catherine Creek Atlas Tier 1 BSR CCC3B1. The project reach supports all freshwater life stages of ESA listed spring Chinook salmon and summer steelhead.  It is also a migration corridor for ESA listed bull trout.  Spawning and rearing of spring Chinook salmon and summer steelhead annually occur in the project reach.

Habitat for all life stages of spring Chinook and summer steelhead is rated fair.  Riffles are prevalent and the substrate is gravel with few fines, but little cobble. The project reach lacks suitable pool area, undercut banks, large wood, and cobble substrate.  The historic channel has been blocked off by gravel upstream of the Park’s day use area.  The width to depth ratio is 22.8 and Catherine Creek is channelized throughout the reach. Limiting factors for salmon and steelhead in the project reach include a low abundance of pool habitat, a lack of LWD, floodplain condition, and water temperature.

Restoration funding will be used to increase habitat diversity and address limiting factors. A side channel and swale will be excavated to provide low velocity habitat, cover, and channel complexity.  Both will intersect an existing spring complex enhancing cool-water thermal refuge.  Large wood placements will occur to increase planform complexity, create and maintain scour pools, provide cover, increase deposition, rack wood, and form gravel bars.  Wood will also be used to activate side channels and reconnect floodplains.  Large boulders will be used to provide hydraulic complexity, encourage local scour, and brace large wood. Two gravel bars will be created to narrow the channel, provide planform complexity, facilitate lateral channel migration, and increase sinuosity.  Willows will be planted and interpretive signs will be developed.

Project partners include OPRD, GRMW and BPA.

Objectives:

*  Narrow mainstem Catherine Creek by 40% between RM 49 and 49.2
*  Increase low velocity rearing areas
*  Improve available spawning habitat by increasing gravel and cobble and decreasing fine sediments
*  Increase available pool habitat greater than 1 m deep
*  Increase off-channel salmonid rearing habitat
*  Decrease riffle habitat
*  Improve public education of the purpose and benefits of salmon habitat protection and restoration
Account Type(s):
Expense
Contract Start Date:
04/01/2019
Contract End Date:
11/30/2022
Current Contract Value:
$399,851
Expenditures:
$399,851

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

Contract(s):

74313 REL 54

Dimensions: 1512 x 1512

Contract(s):

74313 REL 54

Dimensions: 1101 x 1101

Contract(s):

74313 REL 54

Dimensions: 1512 x 1512

Contract(s):

74313 REL 54

Dimensions: 526 x 526

Contract(s):

74313 REL 54

Location: 45.151944° N, -117.737222° E

Dimensions: 1512 x 1512

Contract(s):

74313 REL 54

Location: 45.151944° N, -117.737222° E

Dimensions: 1101 x 1101


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Documentation Complete A: 165. Environmental Compliance 11/30/2022 11/30/2022
Completed large wood and boulder placement B: 29. LWD and Boulder Placement to Increase Instream Complexity 11/30/2022 08/15/2022
Completed Gravel Bar Construction C: 29. Gravel Bar and Pool Enhancement 11/30/2022 08/15/2022
Completed Channel Construction D: 30. Excavate Side Channel Along Historical Channel Scar 11/30/2022 08/15/2022
Completed channel construction E: 30. High Flow Swale and Alcove Excavation 11/30/2022 08/15/2022
Willow Planting and Reseeding Completed F: 47. Restoration Planting and Seeding 11/30/2022 11/30/2022
Interpretive Signs Designed and Purchased G: 99. Interpretive Trail and Signboards Planning 11/30/2022 11/30/2022
Effective implementation management and timely contract administration H: 119. Project/Contract Administration 11/30/2022 11/30/2022
Upload Completion Report I: 132. Catherine Creek State Park Restoration Completion Report 11/30/2022 11/30/2022
Construction Management Complete K: 100. Construction oversight and stakeout 11/30/2022 11/30/2022

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 100 Construction Management
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 100 Construction Management

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance 06/01/2019
B 29 LWD and Boulder Placement to Increase Instream Complexity
C 29 Gravel Bar and Pool Enhancement
D 30 Excavate Side Channel Along Historical Channel Scar
E 30 High Flow Swale and Alcove Excavation
F 47 Restoration Planting and Seeding 01/28/2019
G 99 Interpretive Trail and Signboards Planning 04/01/2019
H 119 Project/Contract Administration 06/01/2019
I 132 Catherine Creek State Park Restoration Completion Report 06/01/2019
J 185 Quarterly Status Reports 06/01/2019
K 100 Construction oversight and stakeout