Province | Subbasin | % |
---|---|---|
Columbia River Estuary | Columbia Estuary | 100.00% |
Previous: | Next: |
---|---|
73721: 2010-070-00 EXP WA ESTUARY MOA UMBRELLA CONTRACT |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Compliance Documentation will be provided for all feasibility projects moving to | B: 165. Environmental Compliance | 08/31/2018 | 08/31/2018 | |
All administrative tasks fulfilled with timely quality products | C: 119. Manage and Administer WDFW Project 2010-070-00 | 08/31/2018 | 08/31/2018 | |
Produce accessible, error-checked datasets and deliver to LCEP | D: 157. Perform AEMR for existing and future MOA Estuary Projects | 08/31/2018 | 08/31/2018 | |
MOA Portion of Planning and Project Development | E: 174. South Unit Shillapoo Project Development | 08/31/2018 | 08/31/2018 | |
Produce South Unit Shillapoo and Buckmire Slough (SUBS) Engineering Designs to 50% | F: 175. Subcontract for SUBS 20% (from previous cont) Engineering Design Phase to 50% Design | 08/31/2018 | ||
WSDOT Engineering Design Review for SUBS Restoration Project | G: 122. WSDOT Engineering Design Review of SUBS project | 08/31/2018 | ||
30% to Final Design for South Bachelor Island | H: 175. South Bachelor Island Engineering Design | 06/30/2018 | 06/01/2018 | |
Completed Annual Report | I: 132. Submit Progress Report for the period 9/1/2016 to 8/31/2017 | 11/30/2017 | 11/22/2017 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened) |
|
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened) |
|
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened) |
|
Coho (O. kisutch) - Unspecified Population |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 09/01/2017 | ||||||
B | 165 | Environmental Compliance | 09/01/2017 | ||||||
C | 119 | Manage and Administer WDFW Project 2010-070-00 | 09/01/2017 | ||||||
D | 157 | Perform AEMR for existing and future MOA Estuary Projects | 09/01/2017 | ||||||
E | 174 | South Unit Shillapoo Project Development | |||||||
F | 175 | Subcontract for SUBS 20% (from previous cont) Engineering Design Phase to 50% Design | |||||||
G | 122 | WSDOT Engineering Design Review of SUBS project | 09/01/2017 | ||||||
H | 175 | South Bachelor Island Engineering Design | 05/21/2018 | ||||||
I | 132 | Submit Progress Report for the period 9/1/2016 to 8/31/2017 | 09/01/2017 |