Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74488 REL 11: 2011-018-00 EXP PEND OREILLE RIVER BASIN INITIATIVE
Project Number:
Title:
Pend Oreille River Basin Initiative: Land Acquisitions, Watershed Restoration, Conservation Hatchery
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
74488 REL 11
Contract Title:
2011-018-00 EXP PEND OREILLE RIVER BASIN INITIATIVE
Contract Continuation:
Previous: Next:
74488 REL 1: 751642011-018-00 EXP PEND OREILLE RIVER BASIN INITIATIVE
  • 74488 REL 21: 2011-018-00 EXP PEND OREILLE RIVER BASIN INITIATIVE
Contract Status:
Closed
Contract Description:
This project supports implementing larger-scale projects to improve local watershed health and ecosystem conditions and function within the Pend Oreille subbasin, consistent with the NPCC Sub-Basin Plan. The Kalispel Tribe has a history of matching & leveraging funds from various sources (e.g. SRFB, DOE, DOT, BIA, USFS) to implement large scale watershed projects. Land management and watershed restoration will be based upon the jointly-developed objectives and expected performance outcomes.

Harvey Creek subwatershed is a high priority for aquatic restoration on the Colville National Forest. Harvey Creek is the primary tributary to Sullivan Lake which supports a naturally-reproducing, self sustaining population of kokanee salmon. Harvey Creek also supports a population of genetically pure Westslope Cutthroat Trout. An analysis of limiting factors to watershed and aquatic function and aquatic habitat-forming processes in Harvey Creek was completed by the Kalispel Tribe in collaboration with the Colville National Forest. The analysis shows altered stream channel shape and function, floodplain disconnection, lack of pool habitat, unstable banks in certain reaches. Flow characteristics at the mouth of Harvey have been altered from past watershed disturbance. The goal of this project is to identify and design for future project implementation of Lower Harvey Creek.

This project is also to develop designs and specifications for the removal and replacement of an existing culvert and undersized bridge on Harvey Creek. Installing an appropriately sized structure will not only restore fish passage, but will allow for natural stream process, such as large wood and bedload transport, to occur. This project will also develop construction cost estimate which will be used for future implementation as dollars become available or can be cost shared through the Pend Oreille Initiative Project.

This project will also produce design and specifications for future replacement of 2 culverts on Jungle Creek (tributary to Harvey Creek) a fish passable structure and reestablish natural stream channel conditions.

This project will compile all data that has been collected to date in the Priest River to produce a report detailing the physical habitat.

The USGS will be providing in Winter of 2018, a cold-water refuge protection and restoration framework. The framework will help prioritize areas for protection and enhancement of cold-water refuges in the Pend Oreille River. The Kalispel Tribe will put out an RFP for the identification potential drawings for 4 locations.  



Account Type(s):
Expense
Contract Start Date:
12/01/2018
Contract End Date:
11/30/2019
Current Contract Value:
$695,341
Expenditures:
$695,341

* Expenditures data includes accruals and are based on data through 30-Sep-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Eric Berntsen Kalispel Tribe No Interested Party eberntsen@kalispeltribe.com (509) 447-7185
Jason Connor Kalispel Tribe No Contract Manager jconnor@knrd.org (509) 447-7285
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Joe Maroney Kalispel Tribe Yes Supervisor jmaroney@knrd.org (509) 447-7272
Kendra Maroney Kalispel Tribe No Interested Party kmaroney@kalispeltribe.com (509) 671-2376
Christopher Roper Bonneville Power Administration No Interested Party cproper@bpa.gov (503) 230-3514
Jolene Seymour Kalispel Tribe Yes Administrative Contact jseymour@kalispeltribe.com (509) 445-1147
Tybee Sheidler Bonneville Power Administration No Interested Party tasheidler@bpa.gov (503) 230-3820
Jennifer Snyder Bonneville Power Administration Yes Env. Compliance Lead jasnyder@bpa.gov (503) 230-4187
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625
Elham Zolmajd-Haghighi Bonneville Power Administration Yes Contracting Officer ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Obtain Required Permits to Implement Restoration Actions B: 165. Obtain Required Permits from State or Federal Agencies as needed 11/30/2019 11/30/2019
Effective implementation management and timely contract administration C: 119. Manage and Fulfill all Administrative Tasks 11/30/2019 11/30/2019
Completed Annual Progress Report D: 132. Submit Progress Report for the period Dec 2017 to November 30,2018 11/29/2019 11/29/2019
Project coordination among all stakeholders E: 189. Coordination with Other Entities on Restoration Actions & Efforts in the Basin 11/30/2019 11/30/2019
Design and/or Specifications for Lower Harvey Creek F: 175. Lower Harvey Creek Stream Design and Identification 11/30/2019 11/30/2019
Develop designs and specifications for the replacement of an existing culvert and undersized bridge on Harvey Creek G: 175. Survey and Design for Harvey Creek Bridge Crossing 11/30/2019 11/30/2019
Report detailing the physical habitat for the Priest River H: 141. Writing Physical Habitat Report for the Priest River in Idaho 11/30/2019 11/30/2019
Prioritized List of Locales and Enhancement Actions to Promote Cold-Water Refugia I: 114. Identification and Design for Enhancing Cold Water Refugia at 4 Locations within Pend Oreille River Below Albeni Falls Dam 11/30/2019 11/30/2019
Replace Two Existing Non-Passable Culverts on Jungle Creek within the Colville National Forest J: 184. Culvert Replacement Project on Jungle Creek 11/30/2019 11/30/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 184 Install Fish Passage Structure
  • 2 instances of WE 175 Produce Design
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 114 Identify and Select Projects

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 12/01/2018
B 165 Obtain Required Permits from State or Federal Agencies as needed 12/01/2018
C 119 Manage and Fulfill all Administrative Tasks 12/01/2018
D 132 Submit Progress Report for the period Dec 2017 to November 30,2018 12/01/2018
E 189 Coordination with Other Entities on Restoration Actions & Efforts in the Basin 12/01/2018
F 175 Lower Harvey Creek Stream Design and Identification 12/01/2018
G 175 Survey and Design for Harvey Creek Bridge Crossing 12/01/2018
H 141 Writing Physical Habitat Report for the Priest River in Idaho 12/01/2018
I 114 Identification and Design for Enhancing Cold Water Refugia at 4 Locations within Pend Oreille River Below Albeni Falls Dam 12/01/2018
J 184 Culvert Replacement Project on Jungle Creek 12/01/2018