Province | Subbasin | % |
---|---|---|
Mountain Snake | Salmon | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Dec-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Obtain or complete Environmental consultation documents and provide to BPA | B: 165. Produce EC documents on identified projects | 08/31/2018 | ||
All administrative tasks fulfilled with timely quality products | C: 119. Manage and administer projects within this contract for FY 15/16 | 09/25/2018 | 03/30/2018 | |
Completed Annual Report | D: 132. Submit Progress Report for the period September 26, 2015 thru September 25, 2016 | 09/30/2016 | 12/05/2016 | |
Upload prioritized project list to Pisces | E: 114. Identify and Select projects based on partnership coordination with Pahsimeroi Group | 08/31/2018 | 08/09/2018 | |
Produce Design and/or Specifications | F: 175. Produce Design: P-17 pipeline and on-farm infrastructure | 09/25/2018 | 03/30/2018 | |
Purchase Pipe and install pipeline for the P-17 project | G: 203. Purchase and install Pipe and stockwater for P-17 Water Conservation Project | 09/25/2018 | ||
Install fish friendly diversion structure, remove and re-habilitate existing structure. | H: 84. Install new fish friendly diversion barrier on P-17 | 09/21/2018 | ||
Install Irrigation well to provide 1.66 to 1.8 cfs to supplement or replace the surface water right | I: 82. Install irrigation well to provide supplemental flows to the JP ranch | 09/25/2018 | ||
Install Riparian Fence on Pahsimeroi on DR ranch | J: 40. Install riparian fence along the Pahsimeroi on the DR ranch | 09/25/2018 | 09/21/2018 | |
Identify potential projects and develop conceptual designs for projects for future funding. | K: 175. Produce conceptual designs on proposed project to provide options for out-year projects | 09/21/2018 | 09/20/2018 | |
Plant vegetation to re-habilitate the fords at the DR bridge locations | L: 47. Plant Vegetation on DR bridge to re-vegetate closed ford locations | 11/16/2017 | 11/16/2017 | |
Install water control headgate and measuring device at the Mulvaney Ditch to reduce flowed directed away from Patterson/Big Springs | M: 148. New: Install headgate and flow measuring device at Mulvaney Ditch to provide adequate flow into Patterson/Big Springs Creek | 09/21/2018 | 09/20/2018 | |
Complete repairs on P-16 diversion and headgate | N: 84. New: Provide maintenance on Passage Structure damaged by high water at P-16 | 09/30/2017 | 09/30/2017 | |
Re-install plug that washed out in high water this year. | O: 85. New: Re-install plug from P-13 Ditch to ensure re-connect of Pahsimeroi River | 09/30/2017 | 09/22/2017 | |
Completed Annual Report | P: 132. Submit Progress Report for the period Septemer 26, 2016 to September 25, 2017 | 09/25/2018 | 09/21/2018 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
Sockeye (O. nerka) - Snake River ESU (Endangered) |
|
Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 09/26/2016 | ||||||
B | 165 | Produce EC documents on identified projects | 09/26/2016 | ||||||
C | 119 | Manage and administer projects within this contract for FY 15/16 | 09/26/2016 | ||||||
D | 132 | Submit Progress Report for the period September 26, 2015 thru September 25, 2016 | 09/26/2016 | ||||||
E | 114 | Identify and Select projects based on partnership coordination with Pahsimeroi Group | 09/26/2016 | ||||||
F | 175 | Produce Design: P-17 pipeline and on-farm infrastructure | 07/24/2017 | ||||||
G | 203 | Purchase and install Pipe and stockwater for P-17 Water Conservation Project | |||||||
H | 84 | Install new fish friendly diversion barrier on P-17 | |||||||
I | 82 | Install irrigation well to provide supplemental flows to the JP ranch | 07/24/2017 | ||||||
J | 40 | Install riparian fence along the Pahsimeroi on the DR ranch | 07/24/2017 | ||||||
K | 175 | Produce conceptual designs on proposed project to provide options for out-year projects | 02/28/2017 | ||||||
L | 47 | Plant Vegetation on DR bridge to re-vegetate closed ford locations | 07/24/2017 | ||||||
M | 148 | New: Install headgate and flow measuring device at Mulvaney Ditch to provide adequate flow into Patterson/Big Springs Creek | 06/01/2018 | ||||||
N | 84 | New: Provide maintenance on Passage Structure damaged by high water at P-16 | 08/28/2017 | ||||||
O | 85 | New: Re-install plug from P-13 Ditch to ensure re-connect of Pahsimeroi River | 10/17/2017 | ||||||
P | 132 | Submit Progress Report for the period Septemer 26, 2016 to September 25, 2017 | 09/26/2016 |