Contract 74975: 1995-001-00 EXP KALISPEL RESIDENT FISH PROGRAM HATCHERY
Project Number:
Title:
Kalispel Tribe Resident Fish Program
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
74975
Contract Title:
1995-001-00 EXP KALISPEL RESIDENT FISH PROGRAM HATCHERY
Contract Continuation:
Previous: Next:
71919: 1995-001-00 EXP KALISPEL RESIDENT FISH HATCHERY
  • 74488 REL 2: 1995-001-00 EXP KALISPEL HATCHERY CONTRACT
Contract Status:
Closed
Contract Description:
The Kalispel Tribal Fish Hatchery (KTFH) is currently in transition from a warmwater Largemouth Bass (LMB) production facility to a dual purpose coldwater facility capable of producing triploid Rainbow Trout (TRBT) for tribal consumption and Westslope Cutthroat Trout (WCT) to support tributary restoration projects. Continued stocking of the Pend Oreille River with LMB is no longer feasible, or desirable for a variety of reasons. First, invasive Northern Pike have become firmly established and caused drastic changes in the fish community and reduced overall LMB population size. Second, Smallmouth Bass have increased in the reservoir and are known to out compete LMB in sympatry. Lastly, habitat improvement and non-native fish suppression and eradication projects being implemented in tributaries to the reservoir are coming to fruition through FERC license implementation and BPA-USACE--Kalispel MOA. It is now feasible to restore self-sustaining, genetically pure populations of WCT to recovered reaches.

We completed a Coldwater Conversion Hatchery Feasibility Study in 2014 in which a consultant team determined that a conversion of the existing facility is feasible and no fatal flaws were identified. The biological criteria used to determine feasibility were based on 3-year piscicide application schedule and restocking salvaged WCT and two cohorts of their offspring, while annually stocking 1,600 catchable TRBT into Indian Creek Pond raised from eyed eggs and fingerlings. Development of the new programs would entail partial reuse and redundancy of groundwater, redesign of surface water pumping plant, replacement of rearing vessels and plumbing, biosecurity measures, and introduction of naturalized rearing elements. Much of the infrastructure could be used and minimal expansion of the footprint would be required. Permitting, design, environmental compliance and Master Planning for the project began 2016 with construction to follow. Minimal effects on production are expected during constructions, as existing raceways with pre-plumbed auxiliary water supplies are currently online for the TRBT program.



During this contract period the KTFH will be rearing up to 1,600 TRBT will be reared from eyed eggs and fingerlings to 8"-16" catchables for outplanting. We will repair the upper Indian Creek pond for a Tribal put-take fishery. The  pond is screened at the inlet and outlet and have a redesigned and constructed water control structure and infiltration system,
Account Type(s):
Expense
Contract Start Date:
02/02/2017
Contract End Date:
02/01/2018
Current Contract Value:
$739,127
Expenditures:
$739,127

* Expenditures data includes accruals and are based on data through 30-Sep-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jason Connor Kalispel Tribe Yes Supervisor jconnor@knrd.org (509) 447-7285
Wayne Gould Kalispel Tribe Yes Contract Manager wgould@knrd.org (509) 445-1147
Joe Maroney Kalispel Tribe Yes Supervisor jmaroney@knrd.org (509) 447-7272
Solomonn Marsh Bonneville Power Administration Yes Contracting Officer spmarsh@bpa.gov (503) 230-3943
Jason Olson Kalispel Tribe Yes Interested Party jolson@knrd.org (509) 447-7290
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Jolene Seymour Kalispel Tribe Yes Administrative Contact jseymour@kalispeltribe.com (509) 445-1147
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Jennifer Snyder Bonneville Power Administration Yes Env. Compliance Lead jasnyder@bpa.gov (503) 230-4187
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Completed Environmental Documentation B: 165. Obtain required environmental clearance to implement affected Work Elements 06/15/2017 06/15/2017
Maintain Hatchery Operations C: 61. Maintain day-to-day hatchery operations 02/01/2018 02/01/2018
Produce TRBT D: 176. Produce KTFH raised TRBT for Kalispel Member harvest 02/01/2018 02/01/2018
Maintain fish health E: 60. Maintain fish health of hatchery raised fish 02/01/2018 02/01/2018
Put and Take Fishery F: 187. Tribal Member harvest of KTFH raised TRBT 02/01/2018
Kalispel Tribal Fish Hatchery Production Plan G: 174. Kalispel Tribal Fish Hatchery Production Plan 02/01/2018
Design, Specifications, and permits for modifications and upgrades to existing hatchery facili H: 175. Design and specifications for modifications and upgrades to existing hatchery facilities 02/01/2018 02/01/2018
Improvements and Modifications to Existing Hatchery Facilities I: 171. Implement modifications and upgrades to existing hatchery facilities. 02/01/2018
Reconstruction of upper pond on Indian Creek property. J: 35. Reconstruct the upper pond on Indian Creek property 09/25/2017 09/30/2017
Kalispel Tribal Hatchery and Natural Resource Department Outreach and Education K: 99. Kalispel Tribal Hatchery and Natural Resource Department Outreach and Education 02/01/2018 02/01/2018
Coordinate with CCT on shared salmon harvest L: 191. Coordinate with CCT on shared salmon harvest 02/01/2018
Attach Progress Report in Pisces M: 132. Submit Progress Report for the period February 2017 to February 2018 01/15/2018 02/01/2018
Hatchery Administration and Management N: 119. Prepare Draft Scope of Work and Budget for FY 18 02/01/2018 02/01/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 35 Develop Pond
  • 1 instance of WE 176 Produce Hatchery Fish
  • 1 instance of WE 60 Maintain Fish Health
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 187 Put and Take Fisheries
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/02/2017
B 165 Obtain required environmental clearance to implement affected Work Elements 02/02/2017
C 61 Maintain day-to-day hatchery operations 02/02/2017
D 176 Produce KTFH raised TRBT for Kalispel Member harvest 02/02/2017
E 60 Maintain fish health of hatchery raised fish 02/02/2017
F 187 Tribal Member harvest of KTFH raised TRBT 08/16/2017
G 174 Kalispel Tribal Fish Hatchery Production Plan 02/02/2017
H 175 Design and specifications for modifications and upgrades to existing hatchery facilities 02/02/2017
I 171 Implement modifications and upgrades to existing hatchery facilities. 08/29/2017
J 35 Reconstruct the upper pond on Indian Creek property 08/16/2017
K 99 Kalispel Tribal Hatchery and Natural Resource Department Outreach and Education 02/02/2017
L 191 Coordinate with CCT on shared salmon harvest 02/02/2017
M 132 Submit Progress Report for the period February 2017 to February 2018 02/02/2017
N 119 Prepare Draft Scope of Work and Budget for FY 18 02/02/2017