Province | Subbasin | % |
---|---|---|
Blue Mountain | Grande Ronde | 100.00% |
Previous: | Next: |
---|---|
n/a |
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental and Cultural Resource compliance assistance and clearance documentation | A: 165. Compliance Documentation & Clearance: habitat protection, restoration or enhancement projects | 03/31/2018 | 03/29/2018 | |
Review and adjustment to design report; produce revised/final construction or site plan. | B: 175. Finalize Design Specifications and Engineering (Completion & Adjustments): Tulley Hill | 06/30/2017 | 06/30/2017 | |
Restored fish passage at the diversion that meets state and federal criteria | C: 184. Install Grade Control Structures and Rock Ribs | 10/16/2017 | 10/16/2017 | |
Improve hydraulic complexity and sediment transport throughout the project reach | D: 29. Install Engineered Riffle with Sinuous Low Flow Channel | 10/16/2017 | 10/16/2017 | |
Enhance stream habitat characteristics throughout the project reach | E: 29. Install structures & place wood to form pools and promote habitat development & complexity | 10/16/2017 | 10/16/2017 | |
(Re)establish streambank, riparian zone and floodplain plant communities | F: 47. Support or Establish Riparian & Floodplain Plant Community | 06/30/2018 | 06/30/2018 | |
Provide pre-construction project management activities; supervise the design build-out | G: 100. Site Preparation, Materials Management, Field Engineering, Quality Assurance, Construction Oversight | 03/31/2018 | 11/30/2017 | |
Effective implementation management and timely contract administration | H: 119. Habitat Project Implementation Management & Contract Administration | 03/31/2018 | 03/29/2018 | |
Upload Completion Report | I: 132. Completion Report: Tulley-Hill (Lostine River) February 2017 - December 2018 | 12/31/2018 | ||
Complete Rock Installation | K: 38. Install rock to stabilization localized erosion around large wood structures | 12/31/2018 | 10/31/2018 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Compliance Documentation & Clearance: habitat protection, restoration or enhancement projects | 04/01/2017 | ||||||
B | 175 | Finalize Design Specifications and Engineering (Completion & Adjustments): Tulley Hill | 01/19/2017 | ||||||
C | 184 | Install Grade Control Structures and Rock Ribs | 06/14/2017 | ||||||
D | 29 | Install Engineered Riffle with Sinuous Low Flow Channel | 06/14/2017 | ||||||
E | 29 | Install structures & place wood to form pools and promote habitat development & complexity | 06/14/2017 | ||||||
F | 47 | Support or Establish Riparian & Floodplain Plant Community | 06/14/2017 | ||||||
G | 100 | Site Preparation, Materials Management, Field Engineering, Quality Assurance, Construction Oversight | 04/01/2017 | ||||||
H | 119 | Habitat Project Implementation Management & Contract Administration | 04/01/2017 | ||||||
I | 132 | Completion Report: Tulley-Hill (Lostine River) February 2017 - December 2018 | 04/01/2017 | ||||||
J | 185 | Quarterly Status Reports | 02/01/2017 | ||||||
K | 38 | Install rock to stabilization localized erosion around large wood structures | 08/27/2018 |