Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 75277: 1984-025-00 EXP GRANDE RONDE FISH HABITAT IMPROVEMENT
Project Number:
Title:
Grande Ronde and Umatilla Fish Habitat Improvement Program
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
75277
Contract Title:
1984-025-00 EXP GRANDE RONDE FISH HABITAT IMPROVEMENT
Contract Continuation:
Previous: Next:
71935: 1984-025-00 EXP GRANDE RONDE FISH HABITAT IMPROVEMENT
  • 74313 REL 29: 1984-025-00 EXP GRANDE RONDE UMATILLA FISH HABITAT IMPROVEMENT 18
Contract Status:
Closed
Contract Description:
The Grande Ronde Fish Habitat Improvement Project supports the Oregon Department of Fish and Wildlife' s (ODFW) efforts to restore riparian and instream habitats in the Blue Mountain Province as mitigation for fisheries losses resulting from development of the federal Columbia River Power System. The project focuses on the restoration of habitats utilized by Federal Endangered Species Act listed Snake River spring/summer Chinook salmon and Snake River summer steelhead, while benefiting many other species of fish and wildlife. Since initiation of this project in 1984, more than 70  projects have been completed on over 100 miles of streams restoring 3,700 acres of riparian and instream habitat.

Project activities planned for this contract period include coordination with basin partners, project planning, design review, permitting and construction, and inspection and maintenance of projects with current ODFW easements. Continued coordination with landowners and pursuit of additional project will also occur.

Funding for implementation of Phase 1 of the Wallowa River-Baker Project has been received from the GRMW and the McNary Mitigation Fund. Project implementation will begin in June 2017. Activities planned for 2017 include construction of two side channels, installation of engineered log jams, fish salvage, riparian planting, and seeding. A 15-year conservation easement has been signed with the landowner.

The Crow Creek-Krebs project will be implemented including constructing livestock and elk exclosure fencing, installing three off-site watering systems, recountouring streambanks, and riparian planting. A 15-year conservation easement has been signed protecting 40 acres,

Technical assistance funding has been received from BPA and OWEB for a fish habitat restoration project on the Hall Ranch, located on Catherine Creek. An engineering firm was hired to develop detailed designs. Phase 1 designs will be completed by April 01, 2017. Program staff will pursue project implementation funding. If funding is received, Phase 1 project construction will occur approximately June-November 2017.

Program staff are pursuing project design funding. If funding is received, Program staff will be the lead on project design for the Bowman-Upper Grande Ronde and Catherine Creek State Park projects.

Inspection and maintenance of projects with easements will be on-going, including maintaining project vegetation, monitoring for and removing trespassing livestock, maintaining and repairing/reconstructing fence lines, and maintaining reconstructed stream channel and instream structures. These activities will be conducted throughout the year to comply with ODFW easements.

Temperature monitoring and data analysis is planned at 12 sites on 6 streams. Photographs will be taken at approximately 100 photo point locations.

Easements and projects on the Upper Grande Ronde, Catherine Creek, Lostine, and Wallowa Rivers and Chesnimnus and Pine creeks will continue to be pursued.

GRFH staff will participate in the BPA Catherine Creek and Upper Grande Ronde ATLAS process via participation on the Science Technical Advisory Committee, Implementation Team, and Stakeholder Technical Advisory Committee. GRFH staff will assist with identifying high priority project opportunities, selection of opportunity leads, and opportunity development.

GRFH staff will participate in development and implementation of the Wallowa Basin, Joseph Creek, and Imnaha Basin Atlas. Development of this Atlas is being funded by OWEB using Focused Investment Partnership Capacity Building dollars. BPA is assisting with Atlas development.

Program staff will participate in monthly Union County Coordination meetings coordinated by the GRMW.

GRFH Program staff will continue to participate on project design and implementation teams for partner's projects in the Upper Grande Ronde, Catherine Creek, and the Wallowa Basin including CC-42, Bird Track, Whiskey Creek, Tamkaliks, and other projects as they arise. ODFW will oversee project construction on Wallowa-Baker, Crow Creek-Krebs, and Hall Ranch and  lead fish salvage operations on Wallowa-Baker and Hall Ranch. Coordination with basin partners will remain a priority.
Account Type(s):
Expense
Contract Start Date:
03/01/2017
Contract End Date:
05/31/2018
Current Contract Value:
$572,095
Expenditures:
$572,095

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Grande Ronde Fish Habitat Program Project Management A: 119. Manage and Administer GRFH Program and Projects 05/31/2018 02/28/2018
Local, state and federal permits B: 165. Environmental Compliance for Construction Activities 05/31/2018 02/28/2018
Conduct Fish Salvage on Wallowa River-Baker and Hall Ranch Projects C: 28. Conduct Fish Salvage on Wallowa River-Baker and Hall Ranch Projects 08/15/2017 08/15/2017
Native Upland Grass Seeding on Wallowa River-Baker Project E: 47. Seed Wallowa River-Baker Project with Native Upland Grass Seed Mix 12/31/2017 11/30/2017
Plant Riparian Vegetation on Wallowa River-Baker Project F: 47. Plant Riparian Vegetation on Wallowa River-Baker Project 12/31/2017 11/30/2017
Native Vegetation Maintenance on Projects with ODFW Easements G: 198. Maintain Vegetation on Projects with ODFW Easements 05/31/2018 02/28/2018
Maintain Riparian Habitat Projects With ODFW Easements H: 186. Maintain Projects With ODFW Easements 05/31/2018 02/28/2018
Inspect Current ODFW Grande Ronde Fish Habitat Projects with Easements for Livestock Trespass I: 26. Monitor Current Projects with ODFW Easements for Livestock Trespass 05/31/2018 02/28/2018
Stream Channel and Instream Structure Maintenance J: 186. Maintain Reconstructed Stream Channels and Instream Structures 05/31/2018 02/28/2018
Collect Stream Temperatures at Representative Restoration Projects K: 186. Collect and Analyze Stream Temperatures at Represenative Restoration Projects 05/31/2018 02/28/2018
Documentation of Project Changes Using Photo Points L: 186. Document Representative Restoration Project Changes Using Photo Points 05/31/2018 02/28/2018
Participation in BPA Atlas Process for Catherine Creek and the Upper Grande Ronde M: 122. Participation in BPA Catherine Creek and Upper Grande Ronde Atlas Process 05/31/2018 02/28/2018
Participation in Atlas Development for Wallowa, Joseph Creek, and Imnaha N: 122. Participate in Wallowa, Joseph Creek, and Imnaha Atlas Development 05/31/2018 02/28/2018
Identify and Assess Potential Projects in the Grande Ronde Basin O: 114. Identify and Assess Potential Projects in the Grande Ronde Basin 05/31/2018 02/28/2018
Watershed Coordination P: 191. Coordinate Project Activities with Regional Partners 05/31/2018 02/28/2018
Off-Site Water Systems on Crow Creek-Krebs Project Q: 34. Install Off-Site Water Systems on Crow Creek-Krebs Project 05/31/2018
Regrading of exposed, vertical banks on West Fork Pine Creek. R: 55. Improve Floodplain Connectivity on Crow Creek-Krebs Project 05/31/2018
Riparian Vegetation Planting on Crow Creek-Krebs Project S: 47. Plant Riparian Vegetation on Crow Creek-Krebs Project 02/28/2018
Hall Ranch Habitat Improvement Project Design T: 175. Develop Detailed Designs for Hall Ranch Habitat Improvement Project 04/30/2017 04/30/2017
Detailed Designs for the Upper Grande Ronde-Bowman Project U: 175. Develop Detailed Designs for Upper Grande Ronde - Bowman Project 05/31/2018
Completed Annual Report W: 132. Submit Progress Report for the Period January 1, 2016 to December 31, 2016 08/15/2017 08/15/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 28 Trap and Haul
  • 4 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 40 Install Fence
  • 2 instances of WE 47 Plant Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 175 Produce Design
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 47 Plant Vegetation
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 28 Trap and Haul
  • 1 instance of WE 34 Develop Alternative Water Source
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage and Administer GRFH Program and Projects 03/01/2017
B 165 Environmental Compliance for Construction Activities 03/01/2017
C 28 Conduct Fish Salvage on Wallowa River-Baker and Hall Ranch Projects 03/01/2017
D 40 Install Fence on Wallowa-Baker Project 03/01/2017
E 47 Seed Wallowa River-Baker Project with Native Upland Grass Seed Mix 03/01/2017
F 47 Plant Riparian Vegetation on Wallowa River-Baker Project 03/01/2017
G 198 Maintain Vegetation on Projects with ODFW Easements 01/18/2017
H 186 Maintain Projects With ODFW Easements 01/18/2017
I 26 Monitor Current Projects with ODFW Easements for Livestock Trespass 03/01/2017
J 186 Maintain Reconstructed Stream Channels and Instream Structures 03/01/2017
K 186 Collect and Analyze Stream Temperatures at Represenative Restoration Projects 12/13/2016
L 186 Document Representative Restoration Project Changes Using Photo Points 12/28/2016
M 122 Participation in BPA Catherine Creek and Upper Grande Ronde Atlas Process 03/01/2017
N 122 Participate in Wallowa, Joseph Creek, and Imnaha Atlas Development 03/01/2017
O 114 Identify and Assess Potential Projects in the Grande Ronde Basin 03/01/2017
P 191 Coordinate Project Activities with Regional Partners 03/01/2017
Q 34 Install Off-Site Water Systems on Crow Creek-Krebs Project 12/20/2016
R 55 Improve Floodplain Connectivity on Crow Creek-Krebs Project 12/20/2016
S 47 Plant Riparian Vegetation on Crow Creek-Krebs Project 03/01/2017
T 175 Develop Detailed Designs for Hall Ranch Habitat Improvement Project 01/11/2018
U 175 Develop Detailed Designs for Upper Grande Ronde - Bowman Project 12/20/2016
V 185 Quarterly Status Reports 03/01/2017
W 132 Submit Progress Report for the Period January 1, 2016 to December 31, 2016 03/01/2017