Effective implementation management and timely contract administration |
A: 119. Manage and Administer Project |
|
02/28/2019 |
02/28/2019 |
Complete all required EC and obtain permits prior to implementation of project |
B: 165. Produce Environmental Compliance Documentation |
|
02/28/2019 |
02/28/2019 |
Completed Annual Report |
D: 132. Submit Progress Report for the period (Jan 2017) to (Feb 2018) |
|
08/10/2018 |
08/10/2018 |
Stockwater system installation complete |
E: 34. Lemhi SWCD- Hawley Creek Stockwater |
|
01/31/2019 |
02/28/2019 |
Furnish irrigation pipeline and appurtenances. |
F: 203. Lemhi SWCD: Upper Pratt Creek Access and Flow Enhancement Project (Moulton) |
|
02/28/2019 |
02/28/2019 |
Produce final engineering designs for the Middle Eighteenmile Creek Habitat Improvement Project |
G: 175. Lemhi SWCD: Middle Eighteenmile Creek Habitat Improvement Project Breshears: final design |
|
02/28/2019 |
02/26/2019 |
Draft 30% engineering designs for the highway crossing on Little Sawmill Creek. |
I: 175. Lemhi SWCD: Little Sawmill Creek Highway Crossing: 30% design |
|
02/28/2019 |
02/28/2019 |
Bridge purchase completed |
J: 184. Lemhi SWCD - Pratt Creek Lemhi Back Road Bridge |
|
12/31/2018 |
10/09/2018 |
Rehabilitate project sites through hydroseeding, plant or seed purchase, and planting |
K: 47. Lemhi SWCD: Lemhi Vegetation Managment: Rehabilitate Project Sites |
|
02/28/2019 |
02/13/2019 |
Vegetation maintenance activities complete |
L: 198. Lemhi SWCD: Lemhi Vegetation Management: Noxious Weed Treatments |
|
02/28/2019 |
09/10/2018 |
Effective implementation management and timely contract administration |
M: 119. IDFG: Lemhi Basin Habitat Improvement Manage & Administer |
|
02/28/2019 |
02/28/2019 |
IDFG: Produce design and cost estimate Eagle Valley Subreach 1 |
N: 175. IDFG: Produce design and cost estimate Eagle Valley Subreach 1 |
|
02/28/2019 |
|
Highway 29 Culvert Replacement Final Design |
O: 175. IDFG: Final Design for Highway 29 Culvert Replacement Project |
|
06/30/2018 |
06/28/2018 |
IDFG: Produce final design Eagle Valey Subreach 3 |
R: 175. IDFG: Produce final design Eagle Valley Subreach 3 |
|
06/30/2018 |
06/30/2018 |
Large Woody Structures Installed in Subreach #3 |
S: 29. IDFG: Install Large Woody Structures in Eagle Valley Subreach 3 |
|
02/28/2019 |
|
Revegetated Lower Lemhi Rehabilitation Project Sites |
T: 47. IDFG: Revegetate Eagle Valley Subreach 3 |
|
02/28/2019 |
02/28/2019 |
Construction Management Complete |
U: 100. IDFG: Provide Construction oversight and management of Eagle Valley Subreach 3 |
|
02/28/2019 |
|
Woody debris structures installed |
V: 47. TU: Little Springs Revegetation Project |
|
08/31/2018 |
08/05/2018 |
Willow transplanting completed |
W: 47. TU: Little Sawmill Creek Restoration Project: planting |
|
12/31/2018 |
12/31/2018 |
Fence Installation Complete |
X: 40. TU: Little Sawmill Creek Restoration project: fence |
|
02/28/2019 |
02/28/2019 |
Fish Screen Removal Complete |
Y: 84. TU: Little Sawmill Creek Restoration Project: fish screen removal |
|
12/31/2018 |
10/16/2018 |
SWPP, surveying and as built designs |
Z: 175. TU: Little Sawmill Creek Restoration project: as built drawings |
|
02/28/2019 |
12/14/2018 |
Final engineering designs for creek restoration on Haynes Creek. |
AA: 175. TU: Lower Haynes Creek and Lemhi River Rehabilitation: final design |
|
02/28/2019 |
|
Final engineering designs for restoration/relocation of lower Pratt Creek |
AB: 175. TU: Pratt Creek Channel Rehabilitation: final design |
|
10/31/2018 |
05/18/2018 |
Construction Management Complete |
AC: 100. TU: Pratt Creek Channel Rehabilitation: Construction management |
|
02/28/2019 |
02/28/2019 |
Final design for Big Springs Restoration, Phase 2 |
AD: 175. LRLT - Big Springs Restoration, Phase 2: final engineering |
|
07/31/2018 |
06/30/2018 |
Construct new channel sections, point bars, and islands on Big Springs |
AE: 30. LRLT - Big Springs Restoration, Phase 2: create channel |
|
08/24/2018 |
08/24/2018 |
installation of structures to create and promote aquatic and floodplain complexity |
AF: 29. LRLT - Big Springs Restoration, Phase 2: instream, bank, and floodplain complexity |
|
08/24/2018 |
08/23/2018 |
Purchase and install plants, sodmats, seed |
AG: 47. LRLT - Big Springs Restoration, Phase 2: planting |
|
11/30/2018 |
09/30/2018 |
Install fence |
AH: 40. LRLT - Big Springs Restoration, Phase 2: fence |
|
12/31/2018 |
12/31/2018 |
Devices installed |
AI: 148. RMRS: Lemhi Hydrologic Modeling - Install sensors |
|
09/14/2018 |
09/08/2018 |
collect data from 12 sensors to measure hyporheic flux and scour and deposition |
AJ: 157. RMRS: Lemhi Hydrologic Modeling - Data Collection |
|
02/28/2019 |
02/28/2019 |
Data analysis complete |
AK: 162. RMRS: Lemhi Hydrologic Modeling 2018 |
|
02/28/2019 |
02/28/2019 |
Pipe, pump and appurtenances delivered to project site |
AL: 203. Lemhi SWCD: Little Sawmill Creek Restoration Project 2018: Irrigation |
|
02/28/2019 |
02/28/2019 |
Construction and checklist complete |
AM: 84. IDFG: Bohannon Ck Diversion #3 Removal - Stokes and Jolley Segments |
|
02/28/2019 |
02/28/2019 |
Construction Management Complete |
AN: 100. IDFG: Bohannon Creek Diversion #3 Removal - Construction management |
|
02/28/2019 |
02/28/2019 |