All administrative tasks fulfilled with timely quality products |
A: 119. Manage and Administer Project |
|
02/28/2018 |
02/28/2018 |
Complete all required EC and obtain permits prior to implementation of project |
B: 165. Produce Environmental Compliance Documentation |
|
12/31/2017 |
12/29/2017 |
Completed Annual Report |
D: 132. Submit Progress Report for the period (Jan 2016) to (Dec 2016) |
|
04/30/2017 |
04/27/2017 |
Furnish and install a closed irrigation system. |
E: 203. LSWCD: Middle Pratt Creek Access Improvement Project (Snook) |
|
02/28/2018 |
09/23/2017 |
Relocate irrigation system intake to a new fish screen and improve irrigation. |
F: 203. LSWCD: Eighteenmile Creek Restoration Beyeler |
|
11/30/2017 |
12/21/2017 |
Furnish irrigation pipeline and appurtenances. |
G: 203. LSWCD: Upper Pratt Creek Access and Flow Enhancement Project (Moulton) |
|
02/28/2018 |
12/01/2017 |
Final engineering designs for Pratt Creek culvert on Lemhi County Back Road |
H: 175. LSWCD: Pratt Creek County Road Bridge- final design |
|
02/28/2018 |
01/22/2018 |
Manage vegetation through noxious weed treatments |
I: 199. LSWCD: Lemhi Vegetation Management: Noxious Weed Treatments |
|
11/30/2017 |
10/27/2017 |
Rehabilitate project sites through hydroseeding |
J: 47. LSWCD: Lemhi Vegetation Managment: Rehabilitate Project Sites |
|
06/15/2017 |
04/27/2017 |
Produce draft engineering designs for the Middle Eighteenmile Creek Habitat Improvement Project |
K: 175. LSWCD: Middle Eighteenmile Creek Habitat Improvement Project Breshears- draft design |
|
12/31/2017 |
08/30/2017 |
Furnish large woody debris for construction of woody debris habitat structures |
L: 29. TU: Wimpey Creek (Skinner) Restoration Project: Furnish LWD |
|
02/28/2018 |
02/28/2018 |
Construction Management Complete |
M: 100. TU: Wimpey Creek (Skinner) Restoration Project: Construction management |
|
02/28/2018 |
02/28/2018 |
Draft engineering designs for restoration/relocation of lower Pratt Creek |
N: 175. TU: Pratt Creek Channel Restoration: draft design |
|
02/28/2018 |
12/12/2017 |
Final engineering designs for creek restoration on Little Sawmill Creek. |
O: 175. TU: Little Sawmill Creek Restoration Project: final design |
|
02/28/2018 |
02/08/2018 |
Draft engineering designs for creek restoration on Haynes Creek. |
P: 175. TU: Haynes Creek Restoration Design: draft design |
|
02/28/2018 |
01/16/2018 |
Install small woody debris structures instream. |
Q: 47. TU: Little Springs Revegetation Project |
|
02/28/2018 |
02/28/2018 |
Data analysis complete |
R: 162. RMRS: Lemhi Hydrologic Modeling Using LiDAR Data 2017 |
|
12/31/2017 |
12/29/2017 |
Survey of Lower part of the Lemhi River |
S: 157. RMRS: Lemhi Hydrologic Modeling - Data Collection on Lower part of the Lemhi River |
|
12/31/2017 |
12/29/2017 |
All administrative tasks fulfilled with timely quality products |
T: 119. IDFG: Lemhi Basin Habitat Improvement Manage & Administer |
|
02/28/2018 |
02/28/2018 |
Bohannon Creek Diversion #3 Final Design - Stokes Segment |
U: 175. IDFG: Final Design for Bohannon Creek Diversion #3 Removal - Stokes Segment |
|
02/28/2018 |
|
Construction Management Complete |
V: 100. IDFG: Bohannon Cr #3 Diversion Construction Oversight - Stokes Segment |
|
02/28/2018 |
|
Final design Bohannon Creek 12 and 13 Diversion Consolidation |
W: 175. IDFG: Bohannon Cr 12/13 Diversion Consolidation Design |
|
02/28/2018 |
|
Lateral habitat development |
X: 35. IDFG: Amonson Pond Habitat Development - Upper Little Springs Creek |
|
10/31/2017 |
|
Highway 29 Culvert Replacement Final Design |
Y: 175. IDFG: Final Design for Highway 29 Culvert Replacement Project |
|
02/28/2018 |
|
Revegetated Lower Lemhi Rehabilitation Project Sites |
AA: 47. IDFG: Revegetate Eagle Valley Subreach 3 |
|
02/28/2018 |
|
Construction Management Complete |
AB: 100. IDFG: Provide Construction oversight and management of Eagle Valley Subreach 3 |
|
02/28/2018 |
|
Large Woody Structures Installed in Subreach #3 |
AC: 29. IDFG: Install Large Woody Structures in Eagle Valley Subreach 3 |
|
02/28/2018 |
|
Completed channel construction |
AD: 30. IDFG: Construct side channel in Eagle Valley Subreach 3 |
|
02/28/2018 |
|
Produce Plan |
AE: 174. LRLT - Big Timber 2 Produce Plan - Modeling of Project and Tech Team Presentations |
|
02/28/2018 |
11/30/2017 |
Final design for Big Timber 2 and L63 |
AF: 175. LRLT - Big Timber 2 Diversion Removal Suite: final engineering |
|
02/01/2018 |
10/30/2017 |
Remove Big Timber 2 diversion |
AG: 84. LRLT - Big Timber 2 Diversion Removal Suite: diversion removal |
|
02/28/2018 |
|
Install pump, pipeline and pod system |
AH: 84. LRLT - Big Timber 2 Diversion Removal Suite: alternate irrigation method |
|
02/28/2018 |
|
Use LWD to create aquatic complexity in Big Timber Creek |
AI: 29. LRLT - Big Timber 2 Diversion Removal Suite: install LWD |
|
02/28/2018 |
|
Purchase and install plants for bank rehabilitation, and seeding |
AJ: 47. LRLT - Big Timber 2 Diversion Removal Suite: planting |
|
02/28/2018 |
|
Install stockwater system |
AK: 34. LRLT - Big Timber 2 Diversion Removal Suite: stockwater |
|
02/28/2018 |
|
Final design for Big Springs Restoration |
AL: 175. LRLT - Big Springs Restoration: final engineering |
|
12/31/2017 |
10/30/2017 |
Construct new channel sections, point bars, and islands on Big Springs |
AM: 30. LRLT - Big Springs Restoration: create channel |
|
11/30/2017 |
11/30/2017 |
installation of structures to create and promote aquatic and floodplain complexity |
AN: 29. LRLT - Big Springs Restoration: instream, bank, and floodplain complexity |
|
11/30/2017 |
11/30/2017 |
Purchase and install plants, sodmats, seed |
AO: 47. LRLT - Big Springs Restoration: planting |
|
11/30/2017 |
11/30/2017 |
Install fence |
AP: 40. LRLT - Big Springs Restoration: fence |
|
02/28/2018 |
02/28/2018 |
Final design for Lemhi Fayle Restoration |
AQ: 175. LRLT- Lemhi Fayle Restoration: final engineering |
|
06/30/2017 |
05/31/2017 |
Construct new channel sections, point bars, and islands on the Lemhi River. |
AR: 30. LRLT- Lemhi Fayle Restoration: create channel |
|
11/30/2017 |
08/25/2017 |
installation of structures to create and promote aquatic and floodplain complexity |
AS: 29. LRLT- Lemhi Fayle Restoration: instream, bank, and floodplain complexity |
|
11/30/2017 |
08/25/2017 |
Purchase and installation of plants, sedge mats, and seeding. |
AT: 47. LRLT - Lemhi Fayle Restoration: planting |
|
11/30/2017 |
09/15/2017 |
Install fence |
AU: 40. LRLT - Lemhi Fayle Restoration: fence |
|
02/28/2018 |
02/28/2018 |
Install bridge on Sandy Creek |
AV: 184. LSWCD: Sandy Creek Culvert Replacement: Bridge installation |
|
11/15/2017 |
06/27/2017 |
Install stockwater system |
AW: 34. LSWCD - Sandy Creek Stockwater |
|
10/31/2017 |
09/28/2017 |
Operate and maintain Lemhi River adult weir |
AX: 157. IDFG: Monitoring-Install, operate, and maintain Lemhi River weir |
|
02/28/2018 |
08/31/2017 |
Juvenile survey data |
AY: 157. IDFG: Monitoring-Collect and sample juvenile salmonids in Lemhi River watershed |
|
02/28/2018 |
11/30/2017 |
Chinook salmon tagging records from Lemhi River weir and remote surveys |
AZ: 158. IDFG: Monitoring-Tag Chinook salmon captured at Lemhi River weir and remote surveys |
|
02/28/2018 |
11/30/2017 |
Steelhead tagging records at Lemhi River weir and remote surveys |
BA: 158. IDFG: Monitoring-Tag steelhead captured at Lemhi River weir and remote surveys |
|
02/28/2018 |
11/30/2017 |
Bull Trout tagging records from Lemhi River weir and remote surveys |
BB: 158. IDFG: Monitoring-Tag Bull Trout captured at Lemhi River weir and remote surveys |
|
02/28/2018 |
11/30/2017 |
Westslope Cutthroat Trout tagging records at Lemhi River weir and remote surveys |
BC: 158. IDFG: Monitoring-Tag Westslope Cutthroat Trout captured at Lemhi River weir and remote surveys |
|
02/28/2018 |
11/30/2017 |
Oncorhynchus mykiss tagging records from Lemhi River weir and remote surveys |
BD: 158. IDFG: Monitoring-Tag Oncorhynchus mykiss captured at Lemhi River weir and remote surveys |
|
02/28/2018 |
11/30/2017 |
Purchase plants |
BE: 47. LSWCD: Purchase plants for 2018 planting |
|
02/28/2018 |
02/26/2018 |
Completed channel construction |
BF: 30. LSWCD: Eighteenmile Creek Restoration Beyeler - Channel Reconstruction |
|
02/28/2018 |
01/26/2018 |
Install 1,000 feet of electric fence |
BG: 40. LSWCD: Eighteenmile Creek Restoration Beyeler- install fence |
|
02/28/2018 |
01/26/2018 |
Purchase of irrigation infrastructure |
BH: 203. LSWCD: Little Sawmill Creek Irrigation Enhancement: Irrigation purchase |
|
02/28/2018 |
02/28/2018 |
15% draft design for Big Springs Restoration |
BI: 175. LRLT - Big Springs Restoration: draft engineering, Phase 2 |
|
02/28/2018 |
02/28/2018 |