Effective implementation management and timely contract administration |
A: 119. Manage and Administer Project |
|
02/28/2022 |
02/28/2022 |
Complete all required EC and obtain permits prior to implementation of project |
B: 165. Produce Environmental Compliance Documentation |
|
02/28/2022 |
02/28/2022 |
Completed Annual Report |
D: 132. Submit Progress Report for the period (Mar 2020) to (Feb 2021) |
|
02/28/2022 |
|
Effective implementation management and timely contract administration |
E: 119. IDFG: Manage and Administer Project |
|
02/28/2022 |
02/11/2022 |
Complete construction of Henry Reach habitat improvement project on Lemhi River |
F: 29. IDFG: Complete Middle Lemhi Henry Reach Implementation |
|
02/28/2022 |
02/11/2022 |
Submit final design and bid documents for phase 2 of EVR Subreach 1 |
G: 175. IDFG: Lower Lemhi Eagle Valley Ranch Subreach 1 - Complete Phase 2 Final Design |
|
10/01/2021 |
09/15/2021 |
Complete construction on phase 1 & 2 EVR Subreach 1 on lower Lemhi River. |
H: 29. IDFG: Lower Lemhi Eagle Valley Ranch Subreach 1 Phase 1 & 2 Implementation |
|
02/28/2022 |
02/11/2022 |
Effective implementation management and timely contract administration |
I: 119. Lemhi SWCD: Project Implementation: Manage and Administer |
|
02/28/2022 |
02/15/2022 |
Provide project management and construction oversight |
J: 100. Lemhi SWCD Project Implementation: Provide Project Implementation Support and Construction Oversight |
|
02/28/2022 |
02/15/2022 |
Develop or update (out-year) prioritized Habitat Project list: upload to Pisces |
K: 114. Lemhi SWCD Project Implementation: Identify and Select Projects |
|
02/28/2022 |
02/15/2022 |
Planting Completed |
L: 47. Lemhi SWCD: Lemhi Vegetation Management: Rehabilitate Project Sites |
|
12/31/2021 |
11/30/2021 |
Vegetation managed through noxious and non-native weed herbicide treatments |
M: 199. Lemhi SWCD: Lemhi Vegetation: Initial treatment |
|
11/30/2021 |
10/29/2021 |
Vegetation maintenance activities complete |
N: 198. Lemhi SWCD: Lemhi Vegetation: Ongoing treatment |
|
02/28/2022 |
10/29/2021 |
Completed installation of natural streambed surface and open bottom culvert |
O: 184. Lemhi SWCD - Little Sawmill Creek Highway 28 Culvert Purchase/Install |
|
02/25/2022 |
02/15/2022 |
Construction Management Complete |
P: 100. Lemhi SWCD - Little Sawmill Creek Highway 28 Culvert Construction Mgt. |
|
11/30/2021 |
11/30/2021 |
Construction Management Complete |
R: 100. Lemhi SWCD - Middle Eighteenmile Creek Habitat Improvement Project Ellsworth |
|
12/31/2021 |
12/31/2021 |
Planting Completed |
S: 47. Lemhi SWCD - Middle Eighteenmile Creek Habitat Improvement Project Ellsworth |
|
11/30/2021 |
11/30/2021 |
Completion of all structure implementation for the specific system |
T: 29. Lemhi SWCD Hawley Creek BDAs: Project Implementation |
|
12/31/2021 |
10/22/2021 |
Fall planting completed |
U: 47. Lemhi SWCD Hawley Creek BDAs: Vegetation Planting |
|
12/31/2021 |
11/19/2021 |
Final designs completed and submitted to BPA |
V: 175. Lemhi SWCD: Middle Lemhi Hayden Reach Phase I - Design |
|
02/28/2022 |
|
2021 construction is complete |
W: 29. Lemhi SWCD: Middle Lemhi Hayden Reach Phase I - Implementation |
|
02/28/2022 |
|
Final Designs Complete and Submitted |
X: 175. Lemhi SWCD: Reference Reach Seifert Bank Phase I - Design |
|
08/31/2021 |
09/30/2021 |
Implementation complete |
Y: 29. Lemhi SWCD: Reference Reach Seifert Bank Phase I - Implementation |
|
02/28/2022 |
11/30/2021 |
Construction Management Complete |
Z: 100. LRLT: Upper Big Springs and Pond Outlet Restoration |
|
02/28/2022 |
|
Instream structures installed to create and promote aquatic and floodplain complexity on Big Springs Creek |
AA: 29. LRLT: Upper Big Springs and Pond Outlet Restoration |
|
12/31/2021 |
|
Completed channel construction |
AB: 30. LRLT- Upper Big Springs and Pond Outlet Restoration |
|
12/31/2021 |
|
Construction complete |
AC: 35. LRLT: Upper Big Springs and Pond Outlet Restoration |
|
12/31/2021 |
|
Fence installed |
AD: 40. LRLT: Upper Big Springs and Pond Outlet Restoration |
|
12/31/2021 |
|
Planting completed |
AE: 47. LRLT: Upper Big Springs and Pond Outlet Restoration |
|
12/31/2021 |
|
Kiosk installed |
AF: 188. LRLT: Lemhi Kiosks |
|
12/31/2021 |
|
Upload draft plan |
AG: 174. LRLT: L-63 Project Development |
|
02/28/2022 |
|
Provide construction schedule and completed 80% design |
AH: 175. LRLT: Canyon Creek LLP Triangle Project: Engineering |
|
12/31/2021 |
|
Phase I implementation complete. |
AL: 29. TU: Hayden Creek Hermits Phase I - Implementation |
|
09/30/2021 |
08/08/2021 |
Planting completed |
AM: 47. TU: Hayden Creek Hermits Phase I - Plant Vegetation |
|
02/28/2022 |
12/17/2021 |
Completion of all structures implementation for the specific system |
AN: 29. TU: Beyeler Ranch Upper Lemhi Habitat Enhancement Project, Phase 1: Implementation |
|
10/31/2021 |
08/20/2021 |
Planting Completed |
AP: 47. TU: Beyeler Ranch Upper Lemhi Habitat Enhancement Project, Springs Phase: Plant Vegetation |
|
12/31/2021 |
11/19/2021 |
Implement vegetation maintenance activity |
AQ: 40. TU: Beyeler Ranch Upper Lemhi Habitat Enhancement Project, Springs Phase: Exclosure Fencing |
|
12/31/2021 |
05/28/2021 |
Fall Planting Completed |
AT: 47. TU: Lower Canyon Creek: Plant Vegetation |
|
06/01/2021 |
|
Unscheduled maintenance on habitat/passage/structures completed as needed. |
AU: 186. Perform Unscheduled Maintenance of Habitat Project Sites |
|
02/28/2022 |
02/11/2022 |