Effective implementation management and timely contract administration |
A: 119. Manage and Administer Project |
|
02/28/2021 |
02/28/2021 |
Complete all required EC and obtain permits prior to implementation of project |
B: 165. Produce Environmental Compliance Documentation |
|
02/28/2021 |
02/28/2021 |
Completed Annual Report |
D: 132. Submit Progress Report for the period (Mar 2019) to (Feb 2020) |
|
02/28/2021 |
|
Effective implementation management and timely contract administration |
E: 119. Lemhi SWCD: Project Implementation: Manage and Administer |
|
02/28/2021 |
02/28/2021 |
Provide project management and construction oversight |
F: 100. Lemhi SWCD Project Implementation: Provide Project Implementation Support and Construction Oversight |
|
02/28/2021 |
02/28/2021 |
Develop or update (out-year) prioritized Habitat Project list: upload to Pisces |
G: 114. Lemhi SWCD Project Implementation: Identify and Select Projects |
|
02/28/2021 |
|
Conduct outreach activities |
H: 99. Lemhi SWCD Project Implementation: Outreach and Education |
|
02/28/2021 |
02/28/2021 |
Rehabilitate project sites through hydroseeding, plant or seed purchase, planting, and/or fencing |
I: 47. Lemhi SWCD: Lemhi Vegetation Management: Rehabilitate Project Sites |
|
02/28/2021 |
11/30/2020 |
Vegetation managed through noxious and non-native weed herbicide treatments |
J: 199. Lemhi SWCD: Lemhi Vegetation: Initial treatment |
|
11/30/2020 |
10/30/2020 |
Vegetation maintenance activities complete |
K: 198. Lemhi SWCD: Lemhi Vegetation: Ongoing treatment |
|
11/30/2020 |
10/30/2020 |
Provide final design |
M: 175. Lemhi SWCD - Middle Eighteenmile Creek Habitat Improvement Project Ellsworth |
|
02/28/2021 |
|
Effective implementation management and timely contract administration |
N: 119. IDFG: Manage and Administer Project |
|
02/28/2021 |
02/28/2021 |
Final design and bid documents prepared for Middle Lemhi Henry Reach habitat improvement project. |
O: 175. IDFG: Middle Lemhi Henry Reach Produce Final Design |
|
07/01/2020 |
06/19/2020 |
Complete construction of Henry Reach habitat improvement project on Lemhi River |
P: 29. IDFG: Middle Lemhi Henry Reach Implementation |
|
02/28/2021 |
|
Submit final design and bid documents for phase 1 of EVR Subreach 1 |
Q: 175. IDFG: Lower Lemhi Eagle Valley Ranch Subreach 1 - Complete Phase 1 Final Design |
|
08/21/2020 |
08/14/2020 |
Complete construction on phase 1 EVR Subreach 1 on lower Lemhi River. |
R: 29. IDFG: Lower Lemhi Eagle Valley Ranch Subreach 1 Phase 1 Implementation |
|
02/28/2021 |
|
Submit 60% design for Hayden Reach |
S: 175. IDFG: Middle Lemhi Hayden Reach Produce Draft Design - 60% |
|
02/28/2021 |
01/08/2021 |
Final design provided by engineers |
T: 175. LRLT- L-61 Side Channel Enhancement and Restoration Project: produce final design |
|
02/28/2021 |
|
Sign off on completed construction by project engineers |
U: 100. LRLT - Canyon Creek LLP Triangle Project: construction oversight |
|
11/30/2020 |
|
Instream structures installed to create and promote aquatic and floodplain complexity on Canyon Creek |
V: 29. LRLT - Canyon Creek LLP Triangle Project: install willow weave structures instream |
|
02/28/2021 |
|
Plants, sod mats, and seed purchased and installed |
W: 47. LRLT - Canyon Creek LLP Triangle Project: planting |
|
11/30/2020 |
|
Construction Management Complete |
X: 100. LRLT - Big Springs Lemhi River Confluence Restoration Project, Phase 3: engineering oversight |
|
11/30/2020 |
12/31/2020 |
Structures installed to produce an accurate floodplain grade |
Y: 29. LRLT - Big Springs Lemhi River Confluence Restoration Project, Phase 3: streambank and floodplain adjustment |
|
10/31/2020 |
07/31/2020 |
New diversion and headgate installed |
Z: 84. LRLT - Big Springs Lemhi River Confluence Restoration Project, Phase 3: remove and reinstall diversion |
|
09/30/2020 |
09/01/2020 |
Fence installed |
AA: 40. LRLT - Big Springs Lemhi River Confluence Restoration Project, Phase 3: fence |
|
12/31/2020 |
09/15/2020 |
Two kiosks installed |
AF: 188. LRLT- Lemhi Kiosks |
|
12/31/2020 |
06/30/2020 |
Provide final design |
AG: 175. TU Hayden Creek Hermits- Produce Final Design |
|
02/28/2021 |
02/26/2021 |
Provide 80% design |
AH: 175. TU Lower Canyon Creek- Produce Final Design |
|
02/28/2021 |
|
Fence installed |
AI: 198. TU: Beyeler Ranch Upper Lemhi Habitat Enhancement Project, Phase 1: plant protection fence |
|
02/28/2021 |
11/26/2020 |
Site prepared for inwater work. |
AJ: 29. TU: Beyeler Ranch Upper Lemhi Habitat Enhancement Project, Phase 1: tree procurement and dryland floodplain work |
|
02/26/2021 |
02/11/2021 |
Analyze data |
AK: 162. RMRS: Lemhi Hydrologic Modeling 2020 |
|
02/28/2021 |
|
Collect data and write report |
AL: 157. RMRS: Lemhi Hydrologic Modeling - Data Collection and Report 2020 |
|
02/28/2021 |
|
Inspect and approve of tube railings on Eighteenmile Ck Bridge |
AM: 85. IDFG: Eighteenmile Creek Culvert Replacement |
|
09/30/2020 |
09/30/2020 |
Repairs completed and flow meter is functional |
AN: 186. Lemhi SWCD: Upper Pratt Creek Flow Meter |
|
02/28/2021 |
12/21/2020 |
Develop Memorandum of Understanding between Lemhi SWCD and ITD |
AO: 114. Lemhi SWCD: Highway 28 Little Sawmill Culvert Develop MOU for ITD Participation |
|
02/28/2021 |
12/31/2020 |
Pivot and appurtenances purchased |
AP: 203. TU Lower Canyon Creek Project - Purchase Pivot & Appurtenances |
|
02/28/2021 |
01/05/2021 |