Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 77111 REL 10: 1992-010-00 EXP FORT HALL HABITAT RESTORATION
Project Number:
Title:
Fort Hall Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Upper Snake Snake Upper 100.00%
Contract Number:
77111 REL 10
Contract Title:
1992-010-00 EXP FORT HALL HABITAT RESTORATION
Contract Continuation:
Previous: Next:
77126: 1992-010-00 EXP FORT HALL HABITAT RESTORATION
  • 77111 REL 19: 1992-010-00 EXP FORT HALL HABITAT RESTORATION
Contract Status:
Closed
Contract Description:
The primary goal of the Fort Hall Habitat Restoration project is to restore, enhance, and protect Fort Hall Indian Reservation (Reservation) streams so they can support native fish populations at near historic levels. The Fort Hall Bottoms area provides a range of ecosystem services important to the Shoshone-Bannock Tribes, which includes
sustaining populations of Yellowstone cutthroat trout (Oncorhynchus clarkii bouvieri) and other native fish. The range and distribution of Yellowstone cutthroat trout have been impacted in many tributaries of the Snake River by competition with other salmonids and by habitat degradation. Streams on the Reservation have been negatively affected (i.e. loss of riparian vegetation, down cutting, and lateral scouring of stream banks) by a variety of sources, including livestock grazing, American Falls Reservoir construction and operations, and the 1976 Teton Dam collapse.  Damage to stream banks from years of unrestricted grazing continues to be a problem on Reservation streams. Rapid flooding and drafting of American Falls Reservoir in conjunction with seasonal freeze-thaw cycles is a cause of stream bank failures on lowland Reservation streams.  Negative impacts from stream bank failures include, but are not limited to:  widened channels, a reduction in riparian vegetation and in stream cover; increased summer water temperatures, and deposition of fines on critical spawning and rearing substrates.  Stream restoration will continue to be the focus of the Fort Hall restoration work on the Bottoms.

Habitat restoration will remain as the primary focus for the Fort Hall project in this contract.  Restoration work in this contract will address two reaches of Spring Creek: the upper reach of Spring Creek below Broncho Bridge, and the Dougs Sloping reach.  Work in this contract will include producing designs and on permitting for these project sites. Construction for these two Spring Creek project reaches will occur in the subsequent contract (FY19).  

Work in this contract will also focus on addressing ISRP deliverables outlined in the most recent project review, and submitting final management plan documents.
Account Type(s):
Expense
Contract Start Date:
09/30/2018
Contract End Date:
08/31/2019
Current Contract Value:
$230,029
Expenditures:
$230,029

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes No Supervisor chad.colter@sbtribes.com (208) 239-4553
Lisa Dexter Bonneville Power Administration No Interested Party lldexter@bpa.gov (503) 230-3893
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
David Kaplowe Bonneville Power Administration Yes F&W Approver djkaplowe@bpa.gov (503) 230-5365
Elsha Leavitt Shoshone-Bannock Tribes No Interested Party eleavitt@sbtribes.com (208) 478-3795
Jennifer Lord Bonneville Power Administration Yes COR jklord@bpa.gov (503) 230-5192
Hunter Osborne Shoshone-Bannock Tribes Yes Contract Manager Hunter.Osborne@sbtribes.com (208) 239-4564
Christopher Roper Bonneville Power Administration No Interested Party cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Pam Waterhouse Shoshone-Bannock Tribes No Administrative Contact pamela.waterhouse@sbtribes.com (208) 478-3819
Jacee Weed Shoshone-Bannock Tribes No Administrative Contact jacee.weed@sbtribes.com (208) 239-4551
Elham Zolmajd-Haghighi Bonneville Power Administration Yes Contracting Officer ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Administer contract A: 119. Routine administration of contract Budgets, CR, modifications 08/31/2019 08/30/2019
Obtain all EC from BPA C: 165. Clearance from BPA 08/31/2019 08/30/2019
Community Coordination and Presentations D: 99. Community Presentations 08/31/2019
Response to ISRP deliverables E: 174. ISRP response package to include Plan and limiting factors, efficacy of projects and protocols for Monitoring and Efficacy of Projects on Bottoms Fish Populations 08/31/2019
Develop analysis of restoration effectiveness at project reach sites F: 174. Assess habitat conditions and fish response at current and previous project sites 08/31/2019 08/30/2019
Remove non-native fish species in Spring and Clear Creeks G: 190. Remove non-native/exotic fish 08/31/2019 08/29/2019
Produce design and engineering documents for Spring Creek Doug's Broncho project H: 175. Produce designs for Spring Creek Broncho 08/31/2019 08/29/2019
Produce final designs for Spring Creek Dougs Sloping project I: 175. Produce designs for Dougs Sloping project 08/31/2019 08/30/2019
Completed Annual Report J: 132. Submit Progress Report for the period (09/2014 to 08/2015) 11/30/2018 11/02/2018
Completed Annual Report K: 132. Submit Progress Report for the period (09/2015 to 08/2016) 11/30/2018 11/05/2018
Completed Annual Report L: 132. Submit Progress Report for the period (09/2016 to 08/2017) 11/30/2018 11/05/2018
Completed Annual Report M: 132. Submit Progress Report for the period (09/2017 to 08/2018) 12/31/2018 11/30/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Cutthroat Trout, Yellowstone (O. c. bouvieri)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 2 instances of WE 174 Produce Plan
  • 2 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Routine administration of contract Budgets, CR, modifications 09/01/2018
B 185 Periodic Status Reports for BPA 09/01/2018
C 165 Clearance from BPA 09/01/2018
D 99 Community Presentations 09/01/2018
E 174 ISRP response package to include Plan and limiting factors, efficacy of projects and protocols for Monitoring and Efficacy of Projects on Bottoms Fish Populations 09/01/2018
F 174 Assess habitat conditions and fish response at current and previous project sites 09/30/2018
G 190 Remove non-native/exotic fish 09/01/2018
H 175 Produce designs for Spring Creek Broncho
I 175 Produce designs for Dougs Sloping project
J 132 Submit Progress Report for the period (09/2014 to 08/2015) 09/01/2018
K 132 Submit Progress Report for the period (09/2015 to 08/2016) 09/01/2018
L 132 Submit Progress Report for the period (09/2016 to 08/2017) 09/01/2018
M 132 Submit Progress Report for the period (09/2017 to 08/2018) 09/01/2018