Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 77111 REL 30: 1992-010-00 EXP FORT HALL HABITAT RESTORATION
Project Number:
Title:
Fort Hall Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Upper Snake Snake Upper 100.00%
Contract Number:
77111 REL 30
Contract Title:
1992-010-00 EXP FORT HALL HABITAT RESTORATION
Contract Continuation:
Previous: Next:
77111 REL 19: 1992-010-00 EXP FORT HALL HABITAT RESTORATION
  • 77111 REL 40: 1992-010-00 EXP FORT HALL HABITAT RESTORATION
Contract Status:
Closed
Contract Description:
The primary goal of the Fort Hall Habitat Restoration project is to restore, enhance, and protect Fort Hall Indian Reservation (Reservation) streams so they can support native fish populations at near historic levels. The Fort Hall Bottoms area provides a range of ecosystem services important to the Shoshone-Bannock Tribes, which includes  sustaining populations of Yellowstone cutthroat trout (Oncorhynchus clarkii bouvieri) and other native fish. The range and distribution of Yellowstone cutthroat trout have been impacted in many tributaries of the Snake River by competition with other salmonids and by habitat degradation. Streams on the Reservation have been negatively affected (i.e. loss of riparian vegetation, down cutting, and lateral scouring of stream banks) by a variety of sources, including livestock grazing, American Falls Reservoir construction and operations, and the 1976 Teton Dam collapse.  Damage to stream banks from years of unrestricted grazing continues to be a problem on Reservation streams. Rapid flooding and drafting of American Falls Reservoir in conjunction with seasonal freeze-thaw cycles is a cause of stream bank failures on lowland Reservation streams.  Negative impacts from stream bank failures include, but are not limited to:  widened channels, a reduction in riparian vegetation and in stream cover; increased summer water temperatures, and deposition of fines on critical spawning and rearing substrates.  Stream restoration will continue to be the focus of the Fort Hall restoration work on the Bottoms.

Habitat restoration will remain the primary focus for the Fort Hall project in this contract.  As in the previous contract, restoration work in this contract will address the Doug's Sloping reach of Spring Creek.  Design and engineering work for this project was initiated in contract 77111 Rel 10, and Phase 1 was begun in early 2020 under contract 77111 Rel 19.

Doug's Sloping Project Status and Schedule

The Doug's Sloping restoration project was designed to be constructed in two phases to accommodate the project’s physical size (footprint), available funding, and associated funding schedules. Phase 1 reconstructed the downstream reach and created the foundation for the upstream improvements that will be done in Phase 2 (in the FY20 contract). Phase 2 will enhance the upstream reach and the side channel/beaver pond complexes east and west of the mainstem of the stream. The design will use similar restoration techniques as were applied to the Diggie Creek restoration project in previous contracts.

Work from September 1, 2020 to August 31, 2021 will include completion of Phases 1 and 2 of the Doug's Sloping restoration project on head-end areas of Spring Creek on the Fort Hall Bottoms. Phase 1 will be complete in September 2020, and work will move into Phase 2 as outlined in the plan set and design. Project designs have been reviewed and approved by BPA EC and ETS staff.  Revegetation work will continue through June 2021.  

Annual monitoring of Yellowstone cutthroat trout densities in project areas will continue as in previous contracts. Monitoring will also include post-implementation data collection of some silt and water depth readings to compare pre- and post-construction site conditions.  

This contract also includes work on finalizing the ISRP response package (including a Fish Management Plan), community outreach, and out-year planning.  



Account Type(s):
Expense
Contract Start Date:
09/01/2020
Contract End Date:
08/31/2021
Current Contract Value:
$1,119,124
Expenditures:
$1,119,124

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes No Supervisor chad.colter@sbtribes.com (208) 239-4553
Lisa Dexter Bonneville Power Administration No Interested Party lldexter@bpa.gov (503) 230-3893
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
David Kaplowe Bonneville Power Administration Yes Supervisor djkaplowe@bpa.gov (503) 230-5365
Elsha Leavitt Shoshone-Bannock Tribes No Interested Party eleavitt@sbtribes.com (208) 478-3795
Eric Leitzinger Bonneville Power Administration Yes F&W Approver ejleitzinger@bpa.gov (503) 230-3534
Jennifer Lord Bonneville Power Administration Yes COR jklord@bpa.gov (503) 230-5192
Jennifer McKenna Bonneville Power Administration No CO Assistant jmmckenna@bpa.gov (503) 314-8915
Hunter Osborne Shoshone-Bannock Tribes Yes Contract Manager Hunter.Osborne@sbtribes.com (208) 239-4564
Pam Waterhouse Shoshone-Bannock Tribes No Administrative Contact pamela.waterhouse@sbtribes.com (208) 478-3819
Jacee Weed Shoshone-Bannock Tribes No Administrative Contact jacee.weed@sbtribes.com (208) 239-4551
Elham Zolmajd-Haghighi Bonneville Power Administration Yes Contracting Officer ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Administer contract B: 119. Routine administration of contract Budgets, CR, modifications 08/31/2021 08/31/2021
Obtain all EC from BPA C: 165. Complete all permitting and environmental compliance for contract work and obtain clearance from BPA 08/31/2021 08/31/2021
Community Coordination and Presentations D: 99. Community Presentations 08/31/2021 08/31/2021
Response to ISRP deliverables E: 174. Develop ISRP response package for the 2019-2020 Categorical Review 08/31/2021 08/31/2021
Develop analysis of restoration effectiveness at project reach sites F: 174. Assess habitat conditions and fish response at current and previous project sites 07/31/2021 07/31/2021
Remove non-native fish species in Spring and Clear Creeks G: 190. Remove non-native/exotic fish 07/30/2021 07/30/2021
Complete Phase 1 of the Doug's Sloping project H: 29. Complete Phase 1 of the Doug's Sloping project 07/31/2021 08/31/2021
Complete instream restoration project at Doug's Sloping reach of Spring Creek I: 29. Doug's Sloping Restoration Phase 2: Increase and enhance habitat for Yellowstone Cutthroat Trout (and other native fish and aquatic species). 08/31/2021 08/31/2021
Completed Annual Report J: 132. Submit Progress Report for the period (09/01/2019) to (08/31/2020) 08/31/2021
Completed Annual Report K: 132. Submit Progress Report for the period (09/01/2018) to (08/31/2019) 08/31/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Cutthroat Trout, Yellowstone (O. c. bouvieri)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Routine administration of contract Budgets, CR, modifications
C 165 Complete all permitting and environmental compliance for contract work and obtain clearance from BPA
D 99 Community Presentations
E 174 Develop ISRP response package for the 2019-2020 Categorical Review 01/06/2021
F 174 Assess habitat conditions and fish response at current and previous project sites 01/06/2021
G 190 Remove non-native/exotic fish 01/06/2021
H 29 Complete Phase 1 of the Doug's Sloping project 09/01/2020
I 29 Doug's Sloping Restoration Phase 2: Increase and enhance habitat for Yellowstone Cutthroat Trout (and other native fish and aquatic species). 02/01/2021
J 132 Submit Progress Report for the period (09/01/2019) to (08/31/2020)
K 132 Submit Progress Report for the period (09/01/2018) to (08/31/2019)