Province | Subbasin | % |
---|---|---|
Columbia Gorge | Hood | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Project administration requirements completed | A: 119. Manage Project | 09/28/2018 | 09/28/2018 | |
All work complies with environmental regulations | B: 165. Work with BPA on Environmental Compliance requirements. | 08/03/2018 | 09/28/2018 | |
FY 2017 Annual Progress Report complete | C: 132. Prepare and submit annual progress report for FY 17 work | 01/26/2018 | 01/05/2018 | |
HRSWCD support | D: 114. Provide implementation support | 09/28/2018 | 09/28/2018 | |
Six planting projects evaluated. | F: 198. Inspect riparian spray buffer planting projects | 09/28/2018 | 09/28/2018 | |
One instream restoration project in Hood River basin identified and design started. | H: 114. Identify and develop instream fish habitat improvement projects in the Hood River Watershed. | 09/30/2018 | 09/28/2018 | |
Pipe fittings and valves installed on Highline Lateral Canal Piping Project | I: 203. East Fork Irrigation District - Highline Lateral Canal Piping Project | 09/28/2018 | 05/30/2018 | |
Nine LWD placement projects inspected. | J: 186. Inspect large wood placement projects. | 09/28/2018 | 09/28/2018 | |
East Fork Mills LWD project design set complete. | K: 175. East Fork Hood River - Mills Large Wood Placement Project Engineering | 04/15/2018 | 04/13/2018 | |
Maintain vegetation under Big Eddy Power to 4 ft. high where it crosses West Fork Hood River | M: 198. BPA Powerline Vegetation Maintenance | 09/28/2018 | 06/07/2018 | |
EFID by-pass reach instream flow maintained. | N: 154. Record East Fork stream flows in the EFID by-pass reach | 09/30/2018 | 09/28/2018 | |
2,000 tons of boulders delivered to Kingsley Reservior | O: 203. Farmers Irrigation District – Reservoir Expansion and Lowline Pipeline Replacement | 09/28/2018 | 09/28/2018 | |
Hood River basin instream flows protected | P: 154. Maintain instream flows | 09/30/2018 | 09/28/2018 | |
Riparian fences maintained. | Q: 186. Maintain riparian fences | 09/28/2018 | 09/28/2018 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (Oncorhynchus tshawytscha) - All Populations |
|
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened) |
|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened) |
|
Steelhead (Oncorhynchus mykiss) - All Populations |
|
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened) |
|
Lamprey, Pacific (Entosphenus tridentata) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 119 | Manage Project | 10/01/2017 | ||||||
B | 165 | Work with BPA on Environmental Compliance requirements. | 10/01/2017 | ||||||
C | 132 | Prepare and submit annual progress report for FY 17 work | 10/01/2017 | ||||||
D | 114 | Provide implementation support | 10/01/2017 | ||||||
E | 29 | Neal Creek Denton-Doherty LWD Placement Project Implementation | 08/28/2018 | ||||||
F | 198 | Inspect riparian spray buffer planting projects | 10/02/2017 | ||||||
G | 114 | Neal Creek Restoration Scoping | 10/01/2017 | ||||||
H | 114 | Identify and develop instream fish habitat improvement projects in the Hood River Watershed. | 10/01/2017 | ||||||
I | 203 | East Fork Irrigation District - Highline Lateral Canal Piping Project | |||||||
J | 186 | Inspect large wood placement projects. | 10/02/2017 | ||||||
K | 175 | East Fork Hood River - Mills Large Wood Placement Project Engineering | 01/01/2018 | ||||||
L | 29 | East Fork Hood River – Mills Large Wood Placement Project Implementation | |||||||
M | 198 | BPA Powerline Vegetation Maintenance | 10/02/2017 | ||||||
N | 154 | Record East Fork stream flows in the EFID by-pass reach | 10/01/2017 | ||||||
O | 203 | Farmers Irrigation District – Reservoir Expansion and Lowline Pipeline Replacement | 11/28/2018 | ||||||
P | 154 | Maintain instream flows | 10/01/2017 | ||||||
Q | 186 | Maintain riparian fences | 10/02/2017 | ||||||
R | 185 | Periodic Status Reports for BPA | 10/01/2017 |