Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 78040 REL 11: 1996-020-00 EXP PSMFC CSS COMPONENT FY19
Project Number:
Title:
Comparative Survival Study (CSS)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
78040 REL 11
Contract Title:
1996-020-00 EXP PSMFC CSS COMPONENT FY19
Contract Continuation:
Previous: Next:
77836: 1996-020-00 EXP PSMFC CSS COMPONENT FY18
Contract Status:
Closed
Contract Description:
The Comparative Survival Study (CSS) is a management-oriented, large scale, life-cycle monitoring study of spring/summer/fall Chinook, steelhead, and sockeye, utilizing PIT tags.  The CSS was designed to address several of the basin-wide monitoring needs and to provide demographic and other data for Snake River and Columbia River wild and hatchery salmon and steelhead populations.  One product of the CSS is annual estimates of SARs for Snake River hatchery and wild steelhead and salmon.  Estimation of the overall, aggregate SARs of fish that are transported and those that migrate entirely in-river is key to evaluation of avoidance of jeopardy (i.e., put at risk of extinction) as well as progress toward recovery goals.  Monitoring survival probability over the entire life-cycle can help identify where survival bottlenecks are occurring, which is critical input for informed management decisions (Good et al. 2007).  The CSS also examines environmental factors associated with life-cycle survival probability and evaluates the hypothesized mechanisms for variations in those probabilities.

An overall goal of CSS is to emphasize marking wild fish and to mark wild populations as representatively as possible.  Part of that effort involves marking wild fish at finer geographic scales by relying more on traps located in tributaries and reducing marking at mainstem traps.  This allows marking wild fish at the Major Population Group (MPG) level versus at the Ecologically Significant Unit (ESU) level.  Although truly representative marking is likely impossible, given constraints on fish handling, trapping operations during peak runoff and other limitations to sampling, the CSS has implemented changes to marking to attempt to improve representativeness of major population groups, transition toward finer geographic scale marking, and reduce the handling of listed hatchery stocks.  To accomplish these goals, CSS reduced or eliminated marking at mainstem traps in the Clearwater and Salmon rivers in 2015, and transitioned those tags to traps in tributaries higher up in the watersheds.  

The foundational objectives of the CSS design translate these issues about the efficacy of transportation into key response variables.  The CSS uses the following two aspects for evaluating the efficacy of transportation:  (1) empirical SARs compared to those needed for survival and recovery of the ESU; and (2) SAR comparisons between transport and in-river migration routes.  In this broader context, the primary objective is to answer:  “Are the direct and delayed impacts of the configuration and operation of the FCRPS sufficiently low to ensure that cumulative life-cycle survival is high enough to recover threatened and endangered populations?”  The secondary objective is to answer:  “Is the survival of transported fish (SAR) higher than the survival (SAR) of fish migrating in-river?”  Beginning in 2003, the NPCC Fish and Wildlife Program adopted the goal to achieve smolt-to-adult survival probabilities (SARs) in the range of 2% to 6% (average 4%) for federal ESA-listed Snake and Upper Columbia river salmon and steelhead.  The objective continued through 2009 and most recently the amended 2014 Fish and Wildlife Program (NPCC 2003, 2009, 2014).  Combining these objectives, effectiveness of transportation is assessed by whether (1) the overall SAR(LGR-to-LGR) meets the NPCC regional objective (2%–6% with 4% average) for the ESU and (2) the SAR of fish collected at Snake River dams and diverted into barges is higher than that of fish that migrate through reservoirs and pass these dams via the spillways and turbines.
Account Type(s):
Expense
Contract Start Date:
12/01/2018
Contract End Date:
11/30/2019
Current Contract Value:
$554,345
Expenditures:
$554,345

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Michael Arredondo Pacific States Marine Fisheries Commission Yes Administrative Contact marredondo@psmfc.org (503) 595-3100
Michele DeHart Fish Passage Center Yes Supervisor mdehart@fpc.org (503) 833-3901
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Tracy Hauser Bonneville Power Administration Yes COR tlhauser@bpa.gov (503) 230-4296
Pam Kahut Pacific States Marine Fisheries Commission No Administrative Contact pam_kahut@psmfc.org (503) 595-3100
Travis Kessler Bonneville Power Administration Yes Env. Compliance Lead tdkessler@bpa.gov (503) 230-5468
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Jerry McCann Fish Passage Center No Technical Contact jmccann@fpc.org (503) 833-3909
Chris McCarty Fish Passage Center Yes Technical Contact cmccarty@fpc.org (503) 833-3900
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Cliff Saint Fish Passage Center Yes Contract Manager CliffSaint@fpc.org (503) 833-3900


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
ESA applications and permits. A: 165. ESA Permit 11/30/2019 11/30/2019
Pit Tag Steelhead & Chinook B: 158. IDFG - PIT Tag steelhead & chinook at Idaho Hatcheries 11/30/2019 11/30/2019
PIT-Tag Hatchery Sockeye C: 158. IDFG - PIT Tag Springfield hatchery sockeye 11/30/2019 11/30/2019
PIT Tag wild Chinook and Steelhead D: 158. IDFG - PIT Tag Wild Spring Chinook and Wild Steelhead at Clearwater Tributary Traps 10/31/2019 10/31/2019
PIT Tag Wild Spring Chinook E: 158. IDFG - PIT Tag Wild Spring Chinook at the Salmon River Trap 06/15/2019 06/15/2019
PIT Tag Wild Spring/Summer Chinook F: 158. IDFG - PIT Tag Wild Spring Chinook at the Snake River Trap 06/15/2019 06/15/2019
PIT Tag Wild Chinook and Steelhead G: 158. IDFG - PIT Tag Wild Spring Chinook at Salmon River Tributary Traps 11/30/2019 11/30/2019
Operate hatcheries & traps H: 157. IDFG - Operate Idaho Hatcheries, Snake, and Salmon Traps 11/30/2019 11/30/2019
Tagging Status and Adult Return Report Completed by IDFG I: 162. IDFG - Hatcheries mark group data 11/30/2019 11/30/2019
Uploading & submission of data J: 159. IDFG - Submit files to PTAGIS database 11/30/2019 11/30/2019
2020 SOW, Budget & financial information K: 119. IDFG - Subcontract Administration 11/30/2019 11/30/2019
PIT Tag hatchery Chinook L: 158. ODFW - PIT tag Chinook at Lookingglass Hatchery 10/01/2019 10/01/2019
Tag Hatchery Steelhead M: 158. ODFW - PIT tag Steelhead at Irrigon Hatchey 06/15/2019 06/15/2019
Collect and tag wild Chinook N: 158. ODFW - PIT tag wild Chinook at Grande Ronde River Traps 06/15/2019 06/15/2019
Monitor and record tag loss & mortality O: 157. ODFW - Monitor/record tag loss & mortality at Lookingglass and Grand Ronde River trap 11/30/2019 11/30/2019
Survival Report Completed by ODFW P: 162. ODFW - Lookingglass Hatchery Migration Survival Data 11/30/2019 11/30/2019
Upload files to PTAGIS Q: 159. ODFW - Submit Files for Lookingglass, Irrigon Hatcheries and Lower Grande Ronde River Trap to PTAGIS database 11/30/2019 11/30/2019
2020 SOW and Budget, Invoice/financial information R: 119. ODFW - Subcontracts Administration 11/30/2019 11/30/2019
Pit Tag Steelhead S: 158. WDFW - PIT Tag Steelhead at the Lyons Ferry Hatchery 11/30/2019 11/30/2019
WDFW - PIT tag - Lower Wenatchee River, Entiat, and Methow River Traps T: 158. WDFW - PIT Tag - Lower Wenatchee, Entiat, and Methow River Traps 11/30/2019 11/30/2019
PIT Tag Wild Steelhead U: 158. WDFW - PIT Tag Wild Steelhead at Asotin Creek 11/30/2019 11/30/2019
Manage hatchery PIT tag data V: 157. WDFW - Lyons Ferry Hatchery PIT tag data 11/30/2019 11/30/2019
WDFW - Lower Wenatchee, Entiat, and Methow River Traps W: 157. WDFW - Lower Wenatchee, Entiat & Methow River Traps PIT data 11/30/2019 11/30/2019
Uploading & submission of data X: 159. WDFW - Submit files to PITAGIS for Lyons Ferry hatchery marking 11/30/2019 11/30/2019
Uploading & submission of data Y: 159. WDFW - Submit files to PITAGIS for Wenatchee, Methow and Entiat trap marking 06/30/2019 06/30/2019
Effective implementation management and timely contract administration Z: 119. WDFW - Subcontracts Administration 11/30/2019 11/30/2019
PIT tag - CTUIR - Lookingglass creek trap AA: 158. CTUIR - PIT Tag - Lookingglass 11/30/2019 11/30/2019
PIT Tag Subyearling Fall Chinook AB: 158. NPT – Fall Chinook – Captain Johns Rapids, Pittsburgh Landing & Big Canyon Creek Acclimation 08/31/2019 08/31/2019
Effective implementation management and timely contract administration AC: 119. CSS Oversight Committee with the Fish Passage Center 11/30/2019 11/30/2019
Coordination of CSS activities AD: 189. Intra-agency coordination to facilitate CSS marking with the Fish Passage Center 11/30/2019 11/30/2019
Comments/modifications on Annual CSS Study Plan AE: 156. Development/Refinement of Study Statistical Design with the Fish Passage Center 11/30/2019 11/30/2019
Comments for Draft CSS Annual Report AF: 122. Review & provide comments on Draft CSS Annual Report with the Fish Passage Center 12/31/2018 12/31/2018
Analysis for and respond to comments made by ISAB/ISRP AG: 162. Response to comments, questions, issues, recommendations with the Fish Passage Center 11/30/2019 11/30/2019
Successful Administration of Contract AH: 119. PSMFC & FPC Administration 11/30/2019 11/30/2019
Post FY18 Fish Research Report AJ: 141. Fish Research Report 11/30/2019 11/30/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 5 instances of WE 158 Mark/Tag Animals
  • 3 instances of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 2 instances of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 3 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data
Sockeye (Oncorhynchus nerka) - All Populations
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (Oncorhynchus mykiss) - All Populations
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 6 instances of WE 158 Mark/Tag Animals
  • 2 instances of WE 159 Transfer/Consolidate Regionally Standardized Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 4 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 ESA Permit 12/01/2018
B 158 IDFG - PIT Tag steelhead & chinook at Idaho Hatcheries 10/16/2018
C 158 IDFG - PIT Tag Springfield hatchery sockeye 10/15/2018
D 158 IDFG - PIT Tag Wild Spring Chinook and Wild Steelhead at Clearwater Tributary Traps 10/15/2018
E 158 IDFG - PIT Tag Wild Spring Chinook at the Salmon River Trap 10/15/2018
F 158 IDFG - PIT Tag Wild Spring Chinook at the Snake River Trap 10/15/2018
G 158 IDFG - PIT Tag Wild Spring Chinook at Salmon River Tributary Traps 10/15/2018
H 157 IDFG - Operate Idaho Hatcheries, Snake, and Salmon Traps 10/15/2018
I 162 IDFG - Hatcheries mark group data 12/01/2018
J 159 IDFG - Submit files to PTAGIS database 12/01/2018
K 119 IDFG - Subcontract Administration 12/01/2018
L 158 ODFW - PIT tag Chinook at Lookingglass Hatchery 10/15/2018
M 158 ODFW - PIT tag Steelhead at Irrigon Hatchey 10/15/2018
N 158 ODFW - PIT tag wild Chinook at Grande Ronde River Traps 10/15/2018
O 157 ODFW - Monitor/record tag loss & mortality at Lookingglass and Grand Ronde River trap 10/15/2018
P 162 ODFW - Lookingglass Hatchery Migration Survival Data 12/01/2018
Q 159 ODFW - Submit Files for Lookingglass, Irrigon Hatcheries and Lower Grande Ronde River Trap to PTAGIS database 12/01/2018
R 119 ODFW - Subcontracts Administration 12/01/2018
S 158 WDFW - PIT Tag Steelhead at the Lyons Ferry Hatchery 10/15/2018
T 158 WDFW - PIT Tag - Lower Wenatchee, Entiat, and Methow River Traps 10/15/2018
U 158 WDFW - PIT Tag Wild Steelhead at Asotin Creek 10/15/2018
V 157 WDFW - Lyons Ferry Hatchery PIT tag data 10/15/2018
W 157 WDFW - Lower Wenatchee, Entiat & Methow River Traps PIT data 10/15/2018
X 159 WDFW - Submit files to PITAGIS for Lyons Ferry hatchery marking 12/01/2018
Y 159 WDFW - Submit files to PITAGIS for Wenatchee, Methow and Entiat trap marking 12/01/2018
Z 119 WDFW - Subcontracts Administration 12/01/2018
AA 158 CTUIR - PIT Tag - Lookingglass 10/15/2018
AB 158 NPT – Fall Chinook – Captain Johns Rapids, Pittsburgh Landing & Big Canyon Creek Acclimation 10/15/2018
AC 119 CSS Oversight Committee with the Fish Passage Center 12/01/2018
AD 189 Intra-agency coordination to facilitate CSS marking with the Fish Passage Center 12/01/2018
AE 156 Development/Refinement of Study Statistical Design with the Fish Passage Center 10/15/2018
AF 122 Review & provide comments on Draft CSS Annual Report with the Fish Passage Center 12/01/2018
AG 162 Response to comments, questions, issues, recommendations with the Fish Passage Center 12/01/2018
AH 119 PSMFC & FPC Administration 12/01/2018
AI 132 2018 CSS Annual Report - December 1, 2017 to November 30, 2018 12/01/2018
AJ 141 Fish Research Report 12/01/2018
AK 185 Quarterly Status Reports 12/01/2018