Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 80590: 1991-019-01 EXP HUNGRY HORSE MITIGATION/FLATHEAD
Project Number:
Title:
Hungry Horse Mitigation/Flathead Lake Restoration and Research, Monitoring and Evaluation (RM&E)
Stage:
Implementation
Area:
Province Subbasin %
Mountain Columbia Flathead 100.00%
Contract Number:
80590
Contract Title:
1991-019-01 EXP HUNGRY HORSE MITIGATION/FLATHEAD
Contract Continuation:
Previous: Next:
78183: 1991-019-01 EXP HUNGRY HORSE MITIGATION/FLATHEAD
  • 83531: 1991-019-01 EXP HUNGRY HORSE MITIGATION/FLATHEAD
Contract Status:
Closed
Contract Description:
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote "Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam" in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam.  On November 12, 1991, the Northwest Power and Conservation Council (NPCC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7).  A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993.  The problem this project addresses is the loss of habitat, both in quality and quantity, in the interconnected Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam, and the inundation of 72 miles of the South Fork of the Flathead River and its tributaries upstream of the dam.  

This project addresses basin-level objectives of the 2000 Fish and Wildlife Program of (1) maintenance and restoration of healthy ecosystems and watersheds, (2) protection and expansion of habitat and ecosystem functions, and (3) the achievement of desired population characteristics of resident fish species.  The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and creating spawning habitats within Flathead Lake tributaries.  The project also addresses the unstable shoreline habitat within Flathead Lake and shifts in species composition within the lake and consequent dominance of introduced species that might restrict the success of mitigation measures.  

Monitoring of the experimental kokanee reintroduction in Flathead Lake was a primary activity of this project between 1992 and 1997.  Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 and suppressed since 2002.  Recently this project has partially funded a major incentivized angling effort  that has successfully engaged the public in the suppression of lake trout and conservation on native fishes.

Since 1995 the restoration component of the project has addressed several stream channel, riparian, and fish passage problems.  Since 2011 restoration of acquired riparian lands has dominated the project workload.  The CSKT have acquired title or easement to 59 riparian properties since 2005 which has placed enormous demands on the project for access development, weed control, trespass restrictions, structure and debris removal, and vegetative restoration. The research component of the project began in FY 2000 and measured trophic links between Mysis diluviana, lake trout and Daphnia thorata, investigated bull trout and lake trout life history parameters, and evaluated causes of shoreline erosion. Results of the research have assisted in guiding future mitigation strategies.  

The Tribes obtain cost share funds from other sources for the majority of the objectives within this workplan, while at the same time this project assists with the implementation of projects conducted with Tribal dollars.

This project also incorporates the watershed coordination project.  The watershed coordinator was previously a stand alone project but was merged into this project at the request of BPA.  The watershed coordinator helps to coordinate private landowners and agencies for addressing the issues mentioned above.  For recovery of the fisheries resources to be successful in the drainage, local involvement is necessary.  This project is a coordinated effort toward addressing resource concerns and limiting factors within the Flathead River basin from a watershed perspective.  Pilot projects and all other restoration or enhancement projects coordinated and implemented under this project will help address the fisheries losses from Hungry Horse Dam construction and operation.  This project coordinates agencies, landowners, funding sources, and contractors to facilitate on-the-ground actions which benefit resident fish and wildlife.

The primary focus of work in FY2018 is the restoration and maintenance of lands acquired by CSKT to mitigate fisheries losses caused by Hungry Horse Dam.  These activities include writing of land management plans to identify problems and prioritize solutions.  Subsequent work prescribed in these plans consists of such activities as weed management, debris removal, fencing, access development, preventing trespass and habitat restoration.

This project complements and coordinates closely with other projects such as Secure and Restore Critical Resident Fish Habitat (200200300), Hungry Horse Mitigation/Habitat Improvements (9101903), Hungry Horse Mitigation (9101904) and its sister project in the Kootenai River system (9608702).
Account Type(s):
Expense
Contract Start Date:
10/01/2018
Contract End Date:
09/30/2019
Current Contract Value:
$543,876
Expenditures:
$543,876

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration Yes Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Amanda Bourdon Salish and Kootenai Confederated Tribes Yes Administrative Contact amanda.bourdon@cskt.org (406) 883-2888
Cecilia Brown Bonneville Power Administration Yes COR ckbrown@bpa.gov (503) 230-3462
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Lynn DuCharme Salish and Kootenai Confederated Tribes Yes Technical Contact lynn.ducharme@cskt.org (406) 883-2888x7279
Les Evarts Salish and Kootenai Confederated Tribes Yes Supervisor les.evarts@cskt.org (406) 675-2700
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Barry Hansen Salish and Kootenai Confederated Tribes Yes Contract Manager barry.hansen@cskt.org (406) 883-2888
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration A: 119. Manage and administer projects 09/30/2019 09/26/2019
All applicable EC documents B: 165. NEPA and ESA documents, & other cultural or environmental clearance 09/30/2019 09/26/2019
Removal of 10,000 - 20,000 lake trout from Flathead Lake by incentivized angling C: 190. Remove lake trout from Flathead Lake by fishing events 05/21/2019 05/21/2019
Construction of a new boundary fence on Schall property totaling 1,400 feet. D: 40. Install and maintain fence on Schall property (fencing subcontract) 09/30/2019 08/29/2019
Construction of a new boundary fence totaling 425 feet. E: 40. Install and maintain fence on Owen property (fencing subcontract) 09/30/2019 09/26/2019
Construction of a new boundary fence on Vergeront property totaling 500 feet. F: 40. Install and maintain fence on Vergeront property (fencing subcontract) 09/30/2019 08/29/2019
Construction of a new boundary fence on Miland property totaling 600 feet. G: 40. Install and maintain fence on Miland property (fencing subcontract) 09/30/2019 09/26/2019
Construction of a new boundary fence totaling 1,700 feet. H: 40. Install and maintain fence Ravalli property (fencing subcontract) 09/30/2019
Construction of a new boundary fence on Zeimet property totaling 5,200 feet. I: 40. Install and maintain fence on Zeimet property (fencing subcontract) 09/30/2019
Control noxious weeds on 20 acquired properties totaling 300 acres J: 198. Control noxious weeds and/or re-seed acquired properties 09/30/2019 09/26/2019
Monitoring results on up to 51 acquired properties for trespass and unforeseen problems K: 26. Monitor acquired properties for trespass and unforeseen problems 09/30/2019 09/26/2019
Maintenance of access points and parking areas on five properties L: 188. Construct new access points and parking areas on newly acquired properties 09/30/2019 09/26/2019
Seed up to 10 acres with native grasses to replace weed infestations. M: 47. Seed Howes acquisition with native grasses to replace weed infestations (weed subcontract) 09/30/2019 09/26/2019
Remove structures/debris N: 27. Remove structures/debris from Jocko Hollow property 09/30/2019 09/26/2019
Remove debris O: 27. Remove structures/debris from Upper Demonstration Reach property 09/30/2019
Complete all planned debris removal P: 27. Remove structures/debris from Schall Ranch property 09/30/2019 09/26/2019
Complete all debris removal Q: 27. Remove structures/debris from Ravalli property 09/30/2019 09/26/2019
Remove debris R: 27. Remove structures/debris from the Bird's Eye View property 09/30/2019
Remove debris S: 27. Remove structures/debris from the Howes property 09/30/2019 09/26/2019
Land management plans for up to three newly acquired properties T: 193. Produce land management plans on newly acquired properties 09/30/2019 09/26/2019
Coordination meetings and new project/cost share opportunities U: 191. New and ongoing coordination activities 09/30/2019 09/26/2019
List of projects for FY2019 and beyond V: 114. Identify problems and coordinate solutions 09/30/2019 09/26/2019
Appraisal reports, NEPA documents, surveys, and title reports W: 172. Work with project 200200300 on acquisitions & easements 09/30/2019 09/26/2019
Completed Annual Report X: 132. Submit Progress Report for the period (10/1/2017) to (9/30/2018) 09/30/2019 09/26/2019
Seed up to 60 acres with native grasses to replace weed infestations. Z: 47. RESCHEDULE: Seed Trosper acquisition with native grasses to replace weed infestations 10/31/2018 10/31/2018
Seed up to 50 acres with native grasses to replace weed infestations. AA: 47. RESCHEDULE: Seed Schall Ranch acquisition with native grasses to replace weed infestations 10/31/2018 10/31/2018
Seed up to 15 acres with native grasses to replace weed infestations. AB: 47. RESCHEDULE: Seed Otopaulik acquisition with native grasses to replace weed infestations 10/31/2018 10/31/2018
Construction of a new boundary fence totaling 425 feet. AC: 40. RESCHEDULE: Install and maintain fence on Jocko Hollow property 11/30/2018 11/29/2018
Construction of a new boundary fence totaling 1,700 feet. AD: 40. RESCHEDULE: Install and maintain fence Fyant property 11/30/2018 11/29/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 193 Produce Land Management Plan
  • 1 instance of WE 26 Investigate Trespass
  • 6 instances of WE 27 Remove Debris
  • 8 instances of WE 40 Install Fence
  • 4 instances of WE 47 Plant Vegetation
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 114 Identify and Select Projects
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 193 Produce Land Management Plan
  • 1 instance of WE 26 Investigate Trespass
  • 6 instances of WE 27 Remove Debris
  • 8 instances of WE 40 Install Fence
  • 4 instances of WE 47 Plant Vegetation
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 114 Identify and Select Projects
Trout, Lake (S. namaycush) [OBSOLETE]
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage and administer projects 10/01/2018
B 165 NEPA and ESA documents, & other cultural or environmental clearance 10/01/2018
C 190 Remove lake trout from Flathead Lake by fishing events 10/01/2018
D 40 Install and maintain fence on Schall property (fencing subcontract) 08/23/2019
E 40 Install and maintain fence on Owen property (fencing subcontract) 08/23/2019
F 40 Install and maintain fence on Vergeront property (fencing subcontract) 08/23/2019
G 40 Install and maintain fence on Miland property (fencing subcontract) 08/23/2019
H 40 Install and maintain fence Ravalli property (fencing subcontract) 08/23/2019
I 40 Install and maintain fence on Zeimet property (fencing subcontract) 08/23/2019
J 198 Control noxious weeds and/or re-seed acquired properties 08/23/2019
K 26 Monitor acquired properties for trespass and unforeseen problems 10/01/2018
L 188 Construct new access points and parking areas on newly acquired properties 08/23/2019
M 47 Seed Howes acquisition with native grasses to replace weed infestations (weed subcontract) 08/23/2019
N 27 Remove structures/debris from Jocko Hollow property 08/23/2019
O 27 Remove structures/debris from Upper Demonstration Reach property 08/23/2019
P 27 Remove structures/debris from Schall Ranch property 08/23/2019
Q 27 Remove structures/debris from Ravalli property 08/23/2019
R 27 Remove structures/debris from the Bird's Eye View property 08/23/2019
S 27 Remove structures/debris from the Howes property 08/23/2019
T 193 Produce land management plans on newly acquired properties
U 191 New and ongoing coordination activities 10/01/2018
V 114 Identify problems and coordinate solutions 10/01/2018
W 172 Work with project 200200300 on acquisitions & easements 10/01/2018
X 132 Submit Progress Report for the period (10/1/2017) to (9/30/2018) 10/01/2018
Y 185 Periodic Status Reports for BPA 10/01/2018
Z 47 RESCHEDULE: Seed Trosper acquisition with native grasses to replace weed infestations 10/01/2018
AA 47 RESCHEDULE: Seed Schall Ranch acquisition with native grasses to replace weed infestations 10/01/2018
AB 47 RESCHEDULE: Seed Otopaulik acquisition with native grasses to replace weed infestations 10/01/2018
AC 40 RESCHEDULE: Install and maintain fence on Jocko Hollow property 10/01/2018
AD 40 RESCHEDULE: Install and maintain fence Fyant property 10/01/2018