Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 80649: 2007-396-00 EXP WALLA WALLA BASINWIDE TRIB PASSAGE
Project Number:
Title:
Walla Walla Basinwide Tributary Passage and Flow
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Walla Walla 100.00%
Contract Number:
80649
Contract Title:
2007-396-00 EXP WALLA WALLA BASINWIDE TRIB PASSAGE
Contract Continuation:
Previous: Next:
77247: 2007-396-00 EXP WALLA WALLA BASINWIDE TRIB PASSAGE
  • 83750: 2007-396-00 EXP WALLA WALLA BASINWIDE TRIB PASSAGE
Contract Status:
Closed
Contract Description:
This contract will work to improve stream flows and reduce fish passage barriers in the Walla Walla Basin for the migration and rearing of summer steelhead, spring Chinook salmon, and bull trout. Limited stream flows and fish passage barriers are two primary limiting factors for aquatic species in the Walla Walla Basin. Under this contract the Walla Walla Basin Watershed Council (WWBWC) will address several fish passage issues with the construction of the Couse Creek Fish Passage project, development of designs and permitting for the Lampson Side Channel Entrance, an alternatives assessment and initiation of designs for North Fork Walla Walla Push Up Dams. The Eastside ASR Delivery System designs will look at creating an alternate irrigation source in order to provide more water instream for fish passage and rearing during critical low flow months of the year, and the Walla Walla River Flow Gauge at Tumulum Bridge will help to ensure the 20.05 cfs that has been conserved in Oregon can be protected as instream water rights through Washington.

The WWBWC identified these projects through staff conversations with basin partners, working with property owners, and referring to fish recovery plans. WWBWC held a basin-wide meeting which included representatives from BPA, CTUIR, ODFW, WDFW, USFWS, NOAA, OWRD, local irrigation districts, and other interested parties to review identified projects. These projects were identified as priorities and selected for BPA funded implementation.
Account Type(s):
Expense
Contract Start Date:
11/01/2018
Contract End Date:
12/31/2019
Current Contract Value:
$543,923
Expenditures:
$543,923

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Lindsey Arotin Bonneville Power Administration Yes Env. Compliance Lead ldarotin@bpa.gov (503) 230-4039
Lisa Dexter Bonneville Power Administration Yes Contracting Officer lldexter@bpa.gov (503) 230-3893
Minda Donnelly Department of Energy - IGE No Interested Party minda.donnelly@doe.gov (702) 295-0874
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Wendy Harris Walla Walla Basin Watershed Council Yes Contract Manager wendy.harris@wwbwc.org (541) 938-2170
David Kaplowe Bonneville Power Administration Yes F&W Approver djkaplowe@bpa.gov (503) 230-5365
Douglas Knapp Bonneville Power Administration No Interested Party ddknapp@bpa.gov (503) 230-3285
Crystal Miller Department of Energy - IGE No Interested Party crystal.miller@doe.gov (702) 295-0779
Corrie Veenstra Bonneville Power Administration Yes COR cxveenstra@bpa.gov (503) 230-3503
Emily Wiegert Department of Energy - IGE No Interested Party emily.wiegert@doe.gov (123) 456-7890
Brian Wolcott Walla Walla Basin Watershed Council No Supervisor brian.wolcott@wwbwc.org (541) 938-2170
Jae Woo Department of Energy - IGE No Interested Party jae.woo@doe.gov (702) 295-0874


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
All administrative tasks fulfilled with timely quality products B: 119. Admin oversight for Exp Activities 10/31/2019 10/31/2019
Environmental Compliance complete C: 165. Environmental Compliance Documentation for all Exp actions 10/31/2019 10/31/2019
Annual Progress Report D: 132. Annual Progress Report (11-1-17 to 10-31-18) 03/15/2019 03/27/2019
Youth and Adult Presentations E: 99. Youth and adult presentations 10/31/2019 10/31/2019
Lampson Side Channel Entrance Final Design F: 175. Lampson Side Channel Entrance Final Design and Permitting 10/31/2019 10/31/2019
North Fork WW Push Up Dams Alternatives Assessment/Initial Design Complete G: 175. North Fork WW Push Up Dams Alternatives Assessment/Initial Design - NF8 10/31/2019
North Fork WW Push Up Dam NF8 Alternatives Designed H: 175. North Fork WW Push Up Dams Alternatives Assessment/Initial Design - NF7 10/31/2019
Couse Creek Fish Passage Construction Complete I: 184. Couse Creek Fish Passage Construction 10/31/2019
Walla Walla River at Tumulum Bridge Flow Gauge J: 148. Walla Walla River Flow Gauge at Tumulum Bridge 10/31/2019 10/31/2019
Eastside Recharge Delivery ASR Designs completed. K: 175. Eastside Recharge Delivery ASR Design 10/31/2019
Surface Water Data collected for fish passage and habitat water monitoring L: 157. Collect Surface Water Data for Fish Passage and Flow Restoration 10/31/2019 10/31/2019
Produce accessible, error-checked datasets M: 157. Collect Water Temperature Data for Fish Passage and Flow Restoration 10/31/2019 10/31/2019
Updated WWBWC Database N: 160. Maintain Surface Water Database for Water Monitoring 10/31/2019 10/31/2019
Maintain water temperature database O: 160. Maintain Water Temperature Database for Fish Habitat Monitoring 10/31/2019 10/31/2019
Results on the success of the Recharge Project, On-farm Efficiency, and Water Management P: 162. Analyze Surface Water Data for Fish Habitat Monitoring 10/31/2019 10/31/2019
Results on the success of the Recharge Project, On-farm Efficiency, and Water Management Q: 162. Analyze Water Temperature Data for Fish Habitat Monitoring 10/31/2019 10/31/2019
Watershed coordination R: 191. Walla Walla basin watershed coordination 10/31/2019 10/31/2019
Develop or update (out-year) prioritized Habitat Project list: upload to Pisces S: 114. Identify and select projects for Walla Walla Basin 05/03/2019 05/03/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 184 Install Fish Passage Structure
  • 4 instances of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 162 Analyze/Interpret Data
  • 1 instance of WE 148 Install Flow Measuring Device
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 114 Identify and Select Projects
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 184 Install Fish Passage Structure
  • 4 instances of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 162 Analyze/Interpret Data
  • 1 instance of WE 148 Install Flow Measuring Device
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 4 instances of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 162 Analyze/Interpret Data
  • 1 instance of WE 148 Install Flow Measuring Device

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 11/01/2018
B 119 Admin oversight for Exp Activities 11/01/2018
C 165 Environmental Compliance Documentation for all Exp actions 11/01/2018
D 132 Annual Progress Report (11-1-17 to 10-31-18) 11/01/2018
E 99 Youth and adult presentations 11/01/2018
F 175 Lampson Side Channel Entrance Final Design and Permitting 11/01/2018
G 175 North Fork WW Push Up Dams Alternatives Assessment/Initial Design - NF8 08/17/2018
H 175 North Fork WW Push Up Dams Alternatives Assessment/Initial Design - NF7 08/17/2018
I 184 Couse Creek Fish Passage Construction 03/04/2019
J 148 Walla Walla River Flow Gauge at Tumulum Bridge 08/17/2018
K 175 Eastside Recharge Delivery ASR Design 08/17/2018
L 157 Collect Surface Water Data for Fish Passage and Flow Restoration 11/01/2018
M 157 Collect Water Temperature Data for Fish Passage and Flow Restoration 08/17/2018
N 160 Maintain Surface Water Database for Water Monitoring 11/01/2018
O 160 Maintain Water Temperature Database for Fish Habitat Monitoring 11/01/2018
P 162 Analyze Surface Water Data for Fish Habitat Monitoring 11/01/2018
Q 162 Analyze Water Temperature Data for Fish Habitat Monitoring 11/01/2018
R 191 Walla Walla basin watershed coordination 11/01/2018
S 114 Identify and select projects for Walla Walla Basin 11/01/2018