Province | Subbasin | % |
---|---|---|
Columbia Plateau | Walla Walla | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
All administrative tasks fulfilled with timely quality products | B: 119. Admin oversight for Exp Activities | 10/31/2019 | 10/31/2019 | |
Environmental Compliance complete | C: 165. Environmental Compliance Documentation for all Exp actions | 10/31/2019 | 10/31/2019 | |
Annual Progress Report | D: 132. Annual Progress Report (11-1-17 to 10-31-18) | 03/15/2019 | 03/27/2019 | |
Youth and Adult Presentations | E: 99. Youth and adult presentations | 10/31/2019 | 10/31/2019 | |
Lampson Side Channel Entrance Final Design | F: 175. Lampson Side Channel Entrance Final Design and Permitting | 10/31/2019 | 10/31/2019 | |
North Fork WW Push Up Dams Alternatives Assessment/Initial Design Complete | G: 175. North Fork WW Push Up Dams Alternatives Assessment/Initial Design - NF8 | 10/31/2019 | ||
North Fork WW Push Up Dam NF8 Alternatives Designed | H: 175. North Fork WW Push Up Dams Alternatives Assessment/Initial Design - NF7 | 10/31/2019 | ||
Couse Creek Fish Passage Construction Complete | I: 184. Couse Creek Fish Passage Construction | 10/31/2019 | ||
Walla Walla River at Tumulum Bridge Flow Gauge | J: 148. Walla Walla River Flow Gauge at Tumulum Bridge | 10/31/2019 | 10/31/2019 | |
Eastside Recharge Delivery ASR Designs completed. | K: 175. Eastside Recharge Delivery ASR Design | 10/31/2019 | ||
Surface Water Data collected for fish passage and habitat water monitoring | L: 157. Collect Surface Water Data for Fish Passage and Flow Restoration | 10/31/2019 | 10/31/2019 | |
Produce accessible, error-checked datasets | M: 157. Collect Water Temperature Data for Fish Passage and Flow Restoration | 10/31/2019 | 10/31/2019 | |
Updated WWBWC Database | N: 160. Maintain Surface Water Database for Water Monitoring | 10/31/2019 | 10/31/2019 | |
Maintain water temperature database | O: 160. Maintain Water Temperature Database for Fish Habitat Monitoring | 10/31/2019 | 10/31/2019 | |
Results on the success of the Recharge Project, On-farm Efficiency, and Water Management | P: 162. Analyze Surface Water Data for Fish Habitat Monitoring | 10/31/2019 | 10/31/2019 | |
Results on the success of the Recharge Project, On-farm Efficiency, and Water Management | Q: 162. Analyze Water Temperature Data for Fish Habitat Monitoring | 10/31/2019 | 10/31/2019 | |
Watershed coordination | R: 191. Walla Walla basin watershed coordination | 10/31/2019 | 10/31/2019 | |
Develop or update (out-year) prioritized Habitat Project list: upload to Pisces | S: 114. Identify and select projects for Walla Walla Basin | 05/03/2019 | 05/03/2019 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 11/01/2018 | ||||||
B | 119 | Admin oversight for Exp Activities | 11/01/2018 | ||||||
C | 165 | Environmental Compliance Documentation for all Exp actions | 11/01/2018 | ||||||
D | 132 | Annual Progress Report (11-1-17 to 10-31-18) | 11/01/2018 | ||||||
E | 99 | Youth and adult presentations | 11/01/2018 | ||||||
F | 175 | Lampson Side Channel Entrance Final Design and Permitting | 11/01/2018 | ||||||
G | 175 | North Fork WW Push Up Dams Alternatives Assessment/Initial Design - NF8 | 08/17/2018 | ||||||
H | 175 | North Fork WW Push Up Dams Alternatives Assessment/Initial Design - NF7 | 08/17/2018 | ||||||
I | 184 | Couse Creek Fish Passage Construction | 03/04/2019 | ||||||
J | 148 | Walla Walla River Flow Gauge at Tumulum Bridge | 08/17/2018 | ||||||
K | 175 | Eastside Recharge Delivery ASR Design | 08/17/2018 | ||||||
L | 157 | Collect Surface Water Data for Fish Passage and Flow Restoration | 11/01/2018 | ||||||
M | 157 | Collect Water Temperature Data for Fish Passage and Flow Restoration | 08/17/2018 | ||||||
N | 160 | Maintain Surface Water Database for Water Monitoring | 11/01/2018 | ||||||
O | 160 | Maintain Water Temperature Database for Fish Habitat Monitoring | 11/01/2018 | ||||||
P | 162 | Analyze Surface Water Data for Fish Habitat Monitoring | 11/01/2018 | ||||||
Q | 162 | Analyze Water Temperature Data for Fish Habitat Monitoring | 11/01/2018 | ||||||
R | 191 | Walla Walla basin watershed coordination | 11/01/2018 | ||||||
S | 114 | Identify and select projects for Walla Walla Basin | 11/01/2018 |