Show new navigation
On
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 82741: 2009-012-00 EXP LSNA FLOODPLAIN RECONNECTION
Project Number:
Title:
Willamette Bi-Op Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Lower Columbia Willamette 100.00%
Contract Number:
82741
Contract Title:
2009-012-00 EXP LSNA FLOODPLAIN RECONNECTION
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
Project will enhance surface water connection to Willamette River floodplain at Luckiamute State Natural Area and revegetate disturbed areas plus an additional 20 acres of floodplain forest.
Account Type(s):
Expense
Contract Start Date:
08/15/2019
Contract End Date:
03/01/2021
Current Contract Value:
$270,200
Expenditures:
$270,200

* Expenditures data includes accruals and are based on data through 31-Mar-2025.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Grant
Pricing Method:
Cost Reimbursement (CNF)
MarkerMarkerMarker
20 m
50 ft
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Eric Andersen Bonneville Power Administration Yes COR (503) 230-4094
Lisa Dexter Bonneville Power Administration Yes Contracting Officer lldexter@bpa.gov (503) 230-3893
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Kristen Larson Luckiamute Watershed Council Yes Supervisor director@luckiamutelwc.org (503) 837-0237
John Skidmore Bonneville Power Administration Yes F&W Approver jtskidmore@bpa.gov (503) 230-5494
Shawn Skinner Bonneville Power Administration Yes Env. Compliance Lead srskinner@bpa.gov (503) 230-3727
Jean-Paul Zagarola Bonneville Environmental Foundation Yes Contract Manager jpzagarola@b-e-f.org (971) 832-9097


Viewing of Work Statement Elements
Loading...
Sort Order
WSEV ID
WE ID
Work Element Name
Title
Description
WSE Effective Budget
% of Total WSE Effective Budget
WSE Start
WSE End
         

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance Complete B: 165. EC Compliance Documentation 03/01/2021 03/01/2021
Effective implementation management and timely contract administration C: 119. BPA Required Administrative Tasks 03/01/2021 03/01/2021
Completed channel construction at SIA7 and SIA 8 D: 30. Floodplain Reconnection SIA7 and SIA8 03/01/2021 09/30/2020
Planting completed in SIA7 and SIA8. E: 47. Riparian Revegetation SIA7 and SIA 8 Wetland 03/01/2021 03/01/2021
Planting complete in N10 Unit F: 47. Riparian Revegetation Unit N10 Floodplain - non-wetland 03/01/2021 03/01/2021
Completed Annual Report G: 132. Submit Progress Report for the period (Aug 2019) to (Aug 2020) 03/01/2021 03/01/2021

Viewing of Implementation Metrics
Loading...
Sort Order
WE ID
Work Element Name
Title
Description
Metric ID
Metric
End Fiscal Year
Planned
Actual
Contractor Comments
All Measures
Annual Progress Report Measures
Populations
Viewing of Environmental Metrics Customize
Loading...
WSE ID
WSE Start
WSE End
WE ID
Title
WSE Progress
Study Plan
Protocol
Category
Subcategory
Focus 1
Focus 2
Specific Metric Title

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
Chinook (O. tshawytscha) - Upper Willamette River ESU (Threatened)
  • 2 instances of WE 47 Plant Vegetation
Steelhead (O. mykiss) - Upper Willamette River DPS (Threatened)
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 2 instances of WE 47 Plant Vegetation

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 EC Compliance Documentation
C 119 BPA Required Administrative Tasks
D 30 Floodplain Reconnection SIA7 and SIA8 05/18/2020
E 47 Riparian Revegetation SIA7 and SIA 8 Wetland 05/18/2020
F 47 Riparian Revegetation Unit N10 Floodplain - non-wetland 05/18/2020
G 132 Submit Progress Report for the period (Aug 2019) to (Aug 2020)