Province | Subbasin | % |
---|---|---|
Blue Mountain | Grande Ronde | 100.00% |
Previous: | Next: |
---|---|
74017 REL 42: 1998-007-02 EXP GRANDE RONDE SUPPLEMENTATION/LOSTINE M&E |
|
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Arleen Henry | Nez Perce Tribe | No | Administrative Contact | arleenh@nezperce.org | (208) 621-3833 |
Jay Hesse | Nez Perce Tribe | No | Supervisor | jayh@nezperce.org | (208) 621-3552 |
Rebecca Johnson | Nez Perce Tribe | No | Interested Party | beckyj@nezperce.org | (208) 621-4629 |
Kristen Jule | Bonneville Power Administration | Yes | F&W Approver | krjule@bpa.gov | (503) 230-3588 |
Maureen Kavanagh | Bonneville Power Administration | Yes | COR | makavanagh@bpa.gov | (503) 230-4272 |
Claire McClory | Bonneville Power Administration | No | Env. Compliance Lead | cdmcclory@bpa.gov | (503) 230-5922 |
Tybee Sheidler | Bonneville Power Administration | No | Interested Party | tasheidler@bpa.gov | (503) 230-3820 |
Shane Vatland | Nez Perce Tribe | Yes | Contract Manager | shanev@nezperce.org | (541) 432-2508 |
Jason Vogel | Nez Perce Tribe | Yes | Supervisor | jasonv@nezperce.org | (208) 621-3602 |
Karen Wolfe | Bonneville Power Administration | Yes | Contracting Officer | ktwolfe@bpa.gov | (503) 230-3448 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Provide a Capture Summary of ESA Listed Species | B: 165. Ensure Environmental Compliance Requirements Have Been Met | 12/31/2020 | 12/21/2020 | |
Final Calendar Year Annual Operation Plan for the Lower Snake River Compensation Program | C: 191. LSRCP AOP Meetings for the Grande Ronde and Imnaha River Subbasins | 12/31/2020 | 12/21/2020 | |
Plan and prepare for the NPT 5-year supplementation symposium | D: 161. Planning and preparations for the NPT 5-year supplementation symposium | 02/10/2020 | 02/10/2020 | |
NPT 5-year supplementation symposium | E: 161. NPT 5-year supplementation symposium | 02/12/2020 | 02/12/2020 | |
Calendar Year 2019 Technical RM&E Report | F: 132. Submit an Annual Report to BPA for CY 2019 | 11/30/2020 | 10/26/2020 | |
Produce accessible, error-checked datasets | G: 157. Nez Perce Tribe Adult Weir Data Collection: Spring Chinook and Steelhead Lostine River | 12/31/2020 | 12/21/2020 | |
Produce accessible, error-checked datasets | H: 157. Nez Perce Tribe Spawning Ground Survey Data Collection: Spring Chinook NE Oregon | 12/31/2020 | 12/21/2020 | |
Produce accessible, error-checked datasets | I: 157. Nez Perce Tribe Spawning Ground Survey Data Collection: Bull Trout NE Oregon | 12/31/2020 | 12/21/2020 | |
Produce accessible, error-checked datasets | J: 157. Nez Perce Tribe In-Hatchery Data Collection : Spring Chinook Lookingglass Hatchery | 12/31/2020 | 12/21/2020 | |
Produce accessible, error-checked datasets | K: 157. Nez Perce Tribe PIT Tag Array Operation: Wallowa/Lostine/Minam River | 12/31/2020 | 12/21/2020 | |
Produce accessible, error-checked datasets | L: 157. Nez Perce Tribe Stream Temperature Data Collection: Spring Chinook Lostine River | 12/31/2020 | 12/21/2020 | |
Produce accessible, error-checked datasets | M: 157. Nez Perce Tribe Stream Flow Data Collection: Spring Chinook Lostine River | 12/31/2020 | 12/21/2020 | |
Produce accessible, error-checked datasets with metadata | N: 157. Nez Perce Tribe Radio Telemetry Data Collection: Spring Chinook Lostine River | 12/31/2020 | 12/21/2020 | |
Mark and Tag Chinook with data on marks transferred to the data repository | O: 158. Nez Perce Tribe Marking/Tagging: Juvenile Spring Chinook Lookingglass Hatchery | 11/01/2020 | 10/30/2020 | |
Produce accessible, error-checked datasets with metadata for reports | P: 162. Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lostine River | 12/31/2020 | 12/21/2020 | |
Produce accessible, error-checked datasets with metadata for reports | Q: 162. Nez Perce Tribe Adult Abundance and Life History Data Analysis: Spring Chinook Lostine River | 12/31/2020 | 12/21/2020 | |
Produce accessible, error-checked datasets with metadata for reports | R: 162. Nez Perce Tribe Adult Abundance and Life History Data Analysis: Steelhead Lostine River | 12/31/2020 | 12/21/2020 | |
Produce accessible, error-checked datasets with metadata for reports | S: 162. Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Spring Chinook Lostine Rive | 12/31/2020 | 12/21/2020 | |
Produce accessible, error-checked datasets with metadata for reports | T: 162. Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook Lostine River | 12/31/2020 | 12/21/2020 | |
Produce accessible, error-checked datasets with metadata | U: 162. Nez Perce Tribe Habitat Data Analysis: Spring Chinook Lostine River | 12/31/2020 | 12/21/2020 | |
Produce accessible, error-checked datasets with metadata | V: 162. Nez Perce Tribe In-Hatchery Data Analysis: Spring Chinook Lookingglass Hatchery | 12/31/2020 | 12/21/2020 | |
Report life cycle modeling results pertinent to Lostine River Chinook supplementation | W: 162. Life cycle modeling to evaluate Chinook Salmon supplementation | 12/31/2020 | 12/21/2020 | |
Complete Administrative Tasks | X: 119. Manage and Administer the Project Contract | 12/31/2020 | 12/22/2020 | |
Placeholder: Calendar Year 2018 Technical RM&E Report | Y: 132. Placeholder: Annual Report to BPA for the period 1/1/2018 to 12/31/2018 | 04/30/2020 | 05/18/2020 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | |||||||
B | 165 | Ensure Environmental Compliance Requirements Have Been Met | |||||||
C | 191 | LSRCP AOP Meetings for the Grande Ronde and Imnaha River Subbasins | |||||||
D | 161 | Planning and preparations for the NPT 5-year supplementation symposium | |||||||
E | 161 | NPT 5-year supplementation symposium | |||||||
F | 132 | Submit an Annual Report to BPA for CY 2019 | |||||||
G | 157 | Nez Perce Tribe Adult Weir Data Collection: Spring Chinook and Steelhead Lostine River | 10/31/2019 | ||||||
H | 157 | Nez Perce Tribe Spawning Ground Survey Data Collection: Spring Chinook NE Oregon | 10/31/2019 | ||||||
I | 157 | Nez Perce Tribe Spawning Ground Survey Data Collection: Bull Trout NE Oregon | 10/31/2019 | ||||||
J | 157 | Nez Perce Tribe In-Hatchery Data Collection : Spring Chinook Lookingglass Hatchery | 10/31/2019 | ||||||
K | 157 | Nez Perce Tribe PIT Tag Array Operation: Wallowa/Lostine/Minam River | 10/31/2019 | ||||||
L | 157 | Nez Perce Tribe Stream Temperature Data Collection: Spring Chinook Lostine River | 10/31/2019 | ||||||
M | 157 | Nez Perce Tribe Stream Flow Data Collection: Spring Chinook Lostine River | 10/31/2019 | ||||||
N | 157 | Nez Perce Tribe Radio Telemetry Data Collection: Spring Chinook Lostine River | 10/31/2019 | ||||||
O | 158 | Nez Perce Tribe Marking/Tagging: Juvenile Spring Chinook Lookingglass Hatchery | 10/31/2019 | ||||||
P | 162 | Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lostine River | |||||||
Q | 162 | Nez Perce Tribe Adult Abundance and Life History Data Analysis: Spring Chinook Lostine River | |||||||
R | 162 | Nez Perce Tribe Adult Abundance and Life History Data Analysis: Steelhead Lostine River | |||||||
S | 162 | Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Spring Chinook Lostine Rive | |||||||
T | 162 | Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook Lostine River | |||||||
U | 162 | Nez Perce Tribe Habitat Data Analysis: Spring Chinook Lostine River | |||||||
V | 162 | Nez Perce Tribe In-Hatchery Data Analysis: Spring Chinook Lookingglass Hatchery | |||||||
W | 162 | Life cycle modeling to evaluate Chinook Salmon supplementation | |||||||
X | 119 | Manage and Administer the Project Contract | |||||||
Y | 132 | Placeholder: Annual Report to BPA for the period 1/1/2018 to 12/31/2018 | |||||||
Z | 202 | BiOp RPA Report for CY 2018 |