Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Produce Environmental Compliance Documentation | B: 165. Produce Compliance Documentation | 10/31/2025 | ||
Effective implementation management and timely contract administration | C: 119. Project Management | 10/31/2025 | ||
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish | D: 114. Project Identification and Selection Process & Coordination w/BPA | 06/10/2025 | ||
Complete Coordination | E: 191. Subbasin Coordination | 10/31/2025 | ||
Complete Hwy 20 Construction | F: 29. Methow River Hwy 20 | 10/31/2025 | ||
Complete assistance of Peshastin Creek project | G: 29. Peshastin creek confluence project | 10/31/2025 | ||
Submit Final Design | H: 175. Chewuch Ramsey (Hummingbird) | 10/31/2025 | ||
Submit Final Design | I: 175. Lower Chewuch LW and complexity | 10/31/2025 | ||
Submit Final Design | J: 175. Upper Chewuch floodplain enhancement | 10/31/2025 | ||
Complete Pope Entiat River Restoration Design | K: 175. Pope Entiat River Restoration | 10/31/2025 | ||
Submit Final Design | L: 175. Little Wenatchee River floodplain restoration | 10/31/2025 | ||
Submit 30% Designs | M: 175. Peshastin RM 3.2 | 10/31/2025 | ||
Submit 30% Designs | N: 175. White River Restoration | 10/31/2025 | ||
Provide outreach and education to support upper Columbia salmon restoration efforts. | O: 99. Upper Columbia education and outreach | 10/31/2025 | ||
Project Complete | Q: 33. Decommission Roads End Camp Ground on the Upper Twisp River | 08/15/2025 | ||
Planting Complete | R: 47. Decommission Roads End Camp Ground on the Upper Twisp River | 10/31/2025 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Lamprey, Pacific (Entosphenus tridentata) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | |||||||
B | 165 | Produce Compliance Documentation | |||||||
C | 119 | Project Management | |||||||
D | 114 | Project Identification and Selection Process & Coordination w/BPA | |||||||
E | 191 | Subbasin Coordination | |||||||
F | 29 | Methow River Hwy 20 | |||||||
G | 29 | Peshastin creek confluence project | 10/16/2024 | ||||||
H | 175 | Chewuch Ramsey (Hummingbird) | |||||||
I | 175 | Lower Chewuch LW and complexity | |||||||
J | 175 | Upper Chewuch floodplain enhancement | |||||||
K | 175 | Pope Entiat River Restoration | |||||||
L | 175 | Little Wenatchee River floodplain restoration | |||||||
M | 175 | Peshastin RM 3.2 | |||||||
N | 175 | White River Restoration | |||||||
O | 99 | Upper Columbia education and outreach | |||||||
P | 132 | No report is required per COR | |||||||
Q | 33 | Decommission Roads End Camp Ground on the Upper Twisp River | |||||||
R | 47 | Decommission Roads End Camp Ground on the Upper Twisp River |