Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 93928: 2007-217-00 EXP O&M WALLA WALLA PASSAGE HUDSON BAY
Project Number:
Title:
Walla Walla River Passage Operations and Maintenance (O&M)
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Walla Walla 100.00%
Contract Number:
93928
Contract Title:
2007-217-00 EXP O&M WALLA WALLA PASSAGE HUDSON BAY
Contract Continuation:
Previous: Next:
91586: 2007-217-00 EXP O&M WALLA WALLA PASSAGE HUDSON BAY
  • CR-373237: 2007-217-00 EXP O&M WALLA WALLA PASSAGE HUDSON BAY
  • 96266: 2007-217-00 EXP O&M WALLA WALLA PASSAGE HUDSON BAY
Contract Status:
Issued
Contract Description:
This contract continues work from previous years.

Scope - Hudson Bay District Improvement Company performs daily, weekly, monthly, and annual maintenance tasks at the Little Walla Walla Fish Screen and the Nursery Bridge Fish Ladder and Screen. The facilities will be kept operational and performing within specifications for fish passage, screening, and trapping operations. HBDIC will provide labor, equipment, supplies, and material necessary for the care and maintenance of these fish facilities. The O&M Manuals provided by Montgomery Watson Harza (Little Walla Walla) and the Army Corps of Engineers (Nursery Bridge) will provide guidance for scheduling and scoping of specific maintenance tasks.

Coordination - HBDIC O&M personnel will coordinate closely with CTUIR/ODFW Walla Walla Fish Passage Operations (FPO) personnel in performing tasks under this contract. FPO staff visit the two sites regularly to examine O&M of the facilities to ensure proper function and determine recommendations for any changes to ongoing activities. HBDIC will rely on FPO biologists to determine O&M needs for fish passage and screening and HBDIC O&M personnel will perform in accordance with their direction on matters related to fish passage and screening. HBDIC will participate in reviewing the Walla Walla Annual Operations Plan process with FPO personnel and other stakeholders to determine necessary changes to O&M activities on a yearly basis.    

The FY24 contract includes the following non-recurring maintenance work: Repair/replace rubber dam; upgrade Programmable Logic Controller (PLC) panel and replace Variable Frequency Drive (VFD) for screen cleaner system; replace/upgrade air compressor system used to operate bladder dam and Obermeyer gate; and maintain/upgrade other irrigation infrastructure as needed.
Account Type(s):
Expense
Contract Start Date:
01/01/2024
Contract End Date:
12/31/2024
Current Contract Value:
$254,332
Expenditures:
$200,490

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Cody Grant Hudson Bay District Improvement Company No Supervisor redcaffeine2@yahoo.com (541) 938-6105
David Kaplowe Bonneville Power Administration Yes F&W Approver djkaplowe@bpa.gov (503) 230-5365
Jennifer Plemons Bonneville Power Administration Yes COR jeplemons@bpa.gov (503) 230-3837
Jessica Power Bonneville Power Administration No CO Assistant jdpower@bpa.gov (503) 230-4023
Jacquelyn Schei Bonneville Power Administration Yes Env. Compliance Lead jlschei@bpa.gov (503) 230-5893
Jason Zerba Hudson Bay District Improvement Company Yes Contract Manager jason@azaccounting.tax (541) 938-6105


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Manage and administer project 12/31/2024
Completion of all environmental compliance permitting C: 165. Coordinate with BPA on environmental compliance 10/31/2024
Completed Annual Report D: 132. Produce and Upload 2023 Annual Report 07/31/2024 09/30/2024
Provide O&M for the Little Walla Walla Fish Screen Facility E: 186. Provide O&M for the Little Walla Walla River Fish Screen Facility 12/31/2024
Provide O&M for the Nursery Bridge Fish Ladder F: 186. Provide O&M for the Nursery Bridge Fish Ladder 12/31/2024
Send staff logs to Washington State and tribal fish co-managers that document O&M activities H: 141. Other Reports for BPA 12/31/2024

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 208 Irrigation Infrastructure Construction or Replacement
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 208 Irrigation Infrastructure Construction or Replacement
Trout, Bull (S. confluentus) (Threatened)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 208 Irrigation Infrastructure Construction or Replacement

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Manage and administer project
C 165 Coordinate with BPA on environmental compliance
D 132 Produce and Upload 2023 Annual Report
E 186 Provide O&M for the Little Walla Walla River Fish Screen Facility 04/22/2024
F 186 Provide O&M for the Nursery Bridge Fish Ladder 04/22/2024
G 208 Little Walla Walla River Diversion Replacement 06/06/2024
H 141 Other Reports for BPA