Province | Subbasin | % |
---|---|---|
Mountain Snake | Salmon | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Mar-2025.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Effective implementation management and timely contract administration | B: 119. Routine contract actions | 12/31/2024 | 12/24/2024 | |
Completed Annual Report | C: 132. Annual Report for the period September 1, 2022 Through December 31, 2023 | 03/31/2024 | 02/09/2024 | |
Complete all Environmental Compliance Documentation for Contract | D: 165. Produce Environmental Compliance Documents for projects | 12/31/2024 | 12/03/2024 | |
Complete inspections of fence that needs to be maintained and oversee work. | E: 186. Evaluate BPA funded fences to ensure they are maintained as a properly functioning fence that keeps livestock out of the riparian area. | 10/31/2024 | 10/31/2024 | |
Complete reporting requirements to BPA | F: 26. Investigate Trespass on Easement Property | 12/31/2024 | 09/20/2024 | |
Complete outreach and education within the District boundaries. | G: 99. Provide Outreach and Education for Habitat Projects | 12/31/2024 | 12/03/2024 | |
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish | H: 114. Identify and develop habitat projects collaboratively with local partners | 11/30/2024 | 11/30/2024 | |
Complete all design elements contracted for this SOW for Phase I and Phase II. | I: 175. Produce Design for In-stream complexity project for Pole Creek Phase II in the Upper Stanley Basin. | 10/31/2024 | 10/31/2024 | |
Complete Phase I of the Habitat complexity project on Pole Creek. | J: 29. Create in-stream complexity in Pole Creek at the lower reach as Phase I | 12/31/2024 | 11/04/2024 | |
Complete bridge installation and removal of undersized culvert. | K: 85. Remove the private culvert that is a fish barrier at high flows on Road Creek and is at risk of failure in high flows therefore contributing sediment into the East Fork of the Salmon River. | 11/30/2024 | 10/31/2024 | |
Complete stock-water well | L: 34. Install well for alternative livestock water on Morgan Creek/Salmon River Fence project | 11/15/2024 | 10/24/2024 | |
Complete fence construction on riparian fence. | M: 40. Install approximately 1.3 miles of Jack post and pole fence on Lower Morgan Creek and the Salmon River. | 10/31/2024 | ||
Complete construction of the alternative water source facility | N: 34. Develop off stream stock-water for livestock in conjunction with fencing of approximately 1.8 miles of fence on main Salmon River in the 12-Mile Reach. | 10/31/2024 | 10/31/2024 | |
Complete and submit breach plan for culvert removal and new crossing design to meet BPA Easement Requirements | O: 175. Produce plan and develop design for Warm Springs crossing and culvert removal | 12/31/2024 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU |
|
Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | |||||||
B | 119 | Routine contract actions | |||||||
C | 132 | Annual Report for the period September 1, 2022 Through December 31, 2023 | |||||||
D | 165 | Produce Environmental Compliance Documents for projects | |||||||
E | 186 | Evaluate BPA funded fences to ensure they are maintained as a properly functioning fence that keeps livestock out of the riparian area. | 05/22/2024 | ||||||
F | 26 | Investigate Trespass on Easement Property | |||||||
G | 99 | Provide Outreach and Education for Habitat Projects | |||||||
H | 114 | Identify and develop habitat projects collaboratively with local partners | |||||||
I | 175 | Produce Design for In-stream complexity project for Pole Creek Phase II in the Upper Stanley Basin. | 12/01/2023 | ||||||
J | 29 | Create in-stream complexity in Pole Creek at the lower reach as Phase I | 03/27/2024 | ||||||
K | 85 | Remove the private culvert that is a fish barrier at high flows on Road Creek and is at risk of failure in high flows therefore contributing sediment into the East Fork of the Salmon River. | 05/10/2024 | ||||||
L | 34 | Install well for alternative livestock water on Morgan Creek/Salmon River Fence project | 05/22/2024 | ||||||
M | 40 | Install approximately 1.3 miles of Jack post and pole fence on Lower Morgan Creek and the Salmon River. | 05/22/2024 | ||||||
N | 34 | Develop off stream stock-water for livestock in conjunction with fencing of approximately 1.8 miles of fence on main Salmon River in the 12-Mile Reach. | 05/22/2024 | ||||||
O | 175 | Produce plan and develop design for Warm Springs crossing and culvert removal | 12/01/2023 |