Contract 95700: 1992-026-01 CAP CATHERINE CREEK ELMER DAM FISHWAY
Project Number:
Title:
Grande Ronde Model Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
95700
Contract Title:
1992-026-01 CAP CATHERINE CREEK ELMER DAM FISHWAY
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Issued
Contract Description:
As identified in Catherine Creek Atlas CC2C fish passage at this location will address an anthropogenic barrier limiting factor and improve passage and access for adult and juvenile Chinook, steelhead, lamprey, and bull trout limiting life stages including ESA-listed SR Summer Steelhead who use lower Catherine Creek for migration and rearing at this location.

The proposed project is in Union County within the Catherine Creek River Basin, near the confluence of the Grande Ronde River. The project goals are to (a) improve irrigation water use efficiency, (b) decrease the negative hydrologic effects associated with Elmer Dam in its current state, (c) improve fish passage for all native fishes at all water levels and provide unimpeded passage to approximately 40 of miles of critical spawning and/or rearing habitat for ESA-listed salmon, (d) increase aquatic habitat quality, and (e) increase climate change resiliency.

The fishway and dam improvements coupled with on-farm improvements to off-channel reservoirs and intakes will result in unimpeded fish passage and more natural hydrologic scenarios throughout this migration corridor for all native fishes. Match funding has been secured for the fishway and dam improvements, we are seeking OWRD funds for the on-farm improvements to the off-channel reservoirs and intakes.

NRCS is supporting the Project with matching funds to convert the wheel line irrigation systems to center-pivots. This will increase the productivity and efficiency of the landowner’s field crop farming operations while conserving water.  These elements are not described in this SOW.

Project elements include: (1) New Vertical Slot Fishway with multiple entrances and exits to accommodate volitional passage for all species and life stages throughout a wider range of flow scenarios; (2) Elmer Dam Improvements adding an overshot gate to the dam to accommodate increased hydraulic capacity during spring high flow events; (3) On-Farm Improvements involving installation of two center-pivots, connecting the three off-channel reservoirs together through piping, and moving the two in-channel pumps to off-channel wet wells, allowing them to operate as one large system. Reducing the number of intakes from Catherine Creek into the reservoirs from three to one and providing NOAA-Fisheries and ODFW approved fish screens will improve screening operations, reduce fish impingement, and reduce the maintenance required to fill the reservoirs during high flows; and (4) Installing PIT antenna arrays to the new fishway and dam structure allowing project partners to track PIT-tagged fish through the migration corridor leading to better species escapement data.
Account Type(s):
Capital
Contract Start Date:
09/30/2024
Contract End Date:
12/31/2026
Current Contract Value:
$1,320,372
Expenditures:
$46,309

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Comply with all project permitting and HIP 4. A: 165. Environmental Compliance for Catherine Creek Elmer Dam Passage & Flow Project 10/01/2024
Elmer Dam Existing fishway removal B: 85. Remove existing fishway and install 6 ft wide fishway - Elmer Dam - Catherine Creek RM 13.1 12/31/2026
Complete the new fishway C: 184. Create new fish ladder the meets both state and federal standards - Elmer Fishway - Catherine Creek RM 13.1 12/31/2026
Complete erosion and sediment control D: 55. Erosion and Sediment control 12/31/2026
Construction Management Complete E: 100. Construction Oversight/Management - Elmer Dam - Catherine Creek RM 13.1 12/31/2026
Effective implementation management and timely contract administration F: 119. Habitat Implementation Contract Administration 12/31/2026
Upload Elmer Dam Completion Report G: 132. Elmer Dam Fishway, Dam modification and pump station Completion Report 12/31/2026

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 100 Construction Management
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 100 Construction Management

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance for Catherine Creek Elmer Dam Passage & Flow Project
B 85 Remove existing fishway and install 6 ft wide fishway - Elmer Dam - Catherine Creek RM 13.1 10/08/2024
C 184 Create new fish ladder the meets both state and federal standards - Elmer Fishway - Catherine Creek RM 13.1 10/08/2024
D 55 Erosion and Sediment control 10/08/2024
E 100 Construction Oversight/Management - Elmer Dam - Catherine Creek RM 13.1
F 119 Habitat Implementation Contract Administration
G 132 Elmer Dam Fishway, Dam modification and pump station Completion Report
H 185 Quarterly Status Reports