Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 96530: 1983-436-00 EXP UMATILLA PASSAGE O&M
Project Number:
Title:
Umatilla Passage Operations and Maintenance (O&M)
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Umatilla 100.00%
Contract Number:
96530
Contract Title:
1983-436-00 EXP UMATILLA PASSAGE O&M
Contract Continuation:
Previous: Next:
94188: 1983-436-00 EXP UMATILLA PASSAGE O&M
Contract Status:
Issued
Contract Description:
Westland Irrigation District as contractor to Bonneville Power Administration (and West Extension Irrigation district, as subcontractor to WID), will provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facilities on the Umatilla River. Westland Irrigation District is the contractor of record.

Job sites to be covered are:  Three Mile Right, Three Mile Left, Three Mile Adult Spawning, WEID Sampling Facility, Maxwell Screen Site, Westland Screen Site/Ladder/Juvenile Sampling Facility, Feed Canal Ladder/Screen Site, Stanfield Ladder/Screen Site, Minthorn Holding Facility, Thornhollow Acclimation Site, Imeques Acclimation Site, Pendleton Acclimation Site, and South Fork Walla Walla Spawning Facility.

Contractor O & M personnel will coordinate with Confederated Tribes of the Umatilla Indian Reservation and Oregon Department of Fish and Wildlife personnel in performing tasks under this contract including providing labor, equipment, and materials for trap and haul operations, sampling, acclimation site maintenance, and other related activities as needed.  
Account Type(s):
Expense
Contract Start Date:
03/01/2025
Contract End Date:
02/28/2026
Current Contract Value:
$469,437
Expenditures:

* Expenditures data includes accruals and are based on data through 31-Jan-2025.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Curtis Engbretson Westland Irrigation District Yes Supervisor curtis@westlandirrigation.com (541) 377-2408
David Kaplowe Bonneville Power Administration Yes F&W Approver djkaplowe@bpa.gov (503) 230-5365
Jennifer Plemons Bonneville Power Administration Yes COR jeplemons@bpa.gov (503) 230-3837
Jessica Power Bonneville Power Administration No CO Assistant jdpower@bpa.gov (503) 230-4023
Tina Richardson Westland Irrigation District Yes Contract Manager trichardson@westlandirrigation.com (541) 667-2030
Jacquelyn Schei Bonneville Power Administration No Env. Compliance Lead jlschei@bpa.gov (503) 230-5893


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Manage and administer project 02/28/2026
All project work complies with environmental regulations C: 165. Ensure project has environmental clearance from BPA 02/28/2026
O&M at Stanfield Diversion Site complete D: 186. Stanfield Diversion Site O&M 02/28/2026
O&M at Stanfield Ladder complete E: 186. Stanfield Ladder O&M 02/28/2026
O&M at Feed Canal Diversion Site complete F: 186. Feed Canal Diversion Site O&M 02/28/2026
O&M at Feed Canal Ladder complete G: 186. Feed Canal Ladder O&M 02/28/2026
O&M at Westland Fish Screens and Diversion complete H: 186. Westland Fish Screens and Diversion O&M 02/28/2026
O&M at Westland Juvenile Sampling Facility complete I: 61. Westland Juvenile Sampling Facility O&M 02/28/2026
O&M complete for Westland Ladder and Hydraulic system for Gate Operation J: 186. Westland Ladder and Hydraulic System O&M 02/28/2026
O&M at Maxwell Diversion site comlete K: 186. Maxwell Diversion Site O&M 02/28/2026
O&M at Three Mile Left Diversion Site complete L: 186. Three Mile Left Diversion Site O&M 02/28/2026
O&M at Three Mile Site Spawning Facility complete M: 61. Three Mile Right Spawning Facility O&M 02/28/2026
O&M at WEID Diversion Fish By-Pass and Sampling Area complete N: 61. Fish By-Pass and Sampling Area at WEID Diversion O&M 02/28/2026
O&M at Three Mile Right Ladder and Trap complete O: 186. Three Mile Right Ladder and Trap O&M 02/28/2026
O&M at Thornhollow Acclimation Site complete P: 61. Thornhollow Acclimation Site O&M 02/28/2026
O&M at Pendleton Acclimation Site complete Q: 61. Pendleton Acclimation Site O&M 02/28/2026
O&M at Imeques Acclimation Site complete R: 61. Imeques Acclimation Site O&M 02/28/2026
O&M at Minthorn Trapping Site complete S: 61. Minthorn Acclimation Site O&M 02/28/2026
O&M at South Fork of Walla Walla Spawning Site complete T: 61. South Fork of Walla Walla Spawning Site O&M 02/28/2026
Completed Progress (Annual) Report U: 132. Annual report 02/28/2026
Produce annual operation plan and upload Plan to CBfish V: 174. Annual Operation and Maintenance Plan 12/31/2025

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 9 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 7 instances of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
Coho (O. kisutch) - Unspecified Population
  • 9 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 4 instances of WE 61 Maintain Artificial Production Facility/Infrastructure
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 9 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 5 instances of WE 61 Maintain Artificial Production Facility/Infrastructure
Trout, Bull (S. confluentus) (Threatened)
  • 8 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 61 Maintain Artificial Production Facility/Infrastructure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Manage and administer project
C 165 Ensure project has environmental clearance from BPA
D 186 Stanfield Diversion Site O&M
E 186 Stanfield Ladder O&M
F 186 Feed Canal Diversion Site O&M
G 186 Feed Canal Ladder O&M
H 186 Westland Fish Screens and Diversion O&M
I 61 Westland Juvenile Sampling Facility O&M 12/13/2024
J 186 Westland Ladder and Hydraulic System O&M
K 186 Maxwell Diversion Site O&M
L 186 Three Mile Left Diversion Site O&M
M 61 Three Mile Right Spawning Facility O&M 12/13/2024
N 61 Fish By-Pass and Sampling Area at WEID Diversion O&M 12/13/2024
O 186 Three Mile Right Ladder and Trap O&M
P 61 Thornhollow Acclimation Site O&M 12/13/2024
Q 61 Pendleton Acclimation Site O&M 12/13/2024
R 61 Imeques Acclimation Site O&M 12/13/2024
S 61 Minthorn Acclimation Site O&M 12/13/2024
T 61 South Fork of Walla Walla Spawning Site O&M 12/13/2024
U 132 Annual report
V 174 Annual Operation and Maintenance Plan 12/13/2024