Contract 96692: 2017-005-00 EXP PLCI FLOATING LAMPREY COLLECTOR
Project Number:
Title:
Pacific Lamprey Conservation Initiative
Stage:
Implementation
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
96692
Contract Title:
2017-005-00 EXP PLCI FLOATING LAMPREY COLLECTOR
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Issued
Contract Description:
The novel floating elver trap was successfully fabricated with key lamprey modifications and deployed inside a large circular tank at Bonneville Hatchery and underwent several weeks of testing and refinement in 2024 as a result of FY23 PLCI BPA funding. Due to unforeseeable delays in the initiation of tank testing and limited funding, this new collector (now called “Floating Adult Lamprey Collector Operation Nocturnal” [FALCON]) did not get a chance to be tested at a river site in 2024. With this new PLCI funding, Cramer Fish Sciences will 1) conduct additional lab testing at Bonneville Hatchery (3.5 weeks) to fine tune some additional key design elements to maximize efficiency, 2) implement those changes and modifications, 3) deploy FALCON at the best suitable river site that is feasible to accomplish by 2024/2025, and 4) test efficacy of FALCON during the peak of the migration period (3.5 weeks) at the selected deployment site. Additional recommendati... ons will be made for modification based on this site testing. Finally, this project will create opportunities for additional FALCON to be fabricated and deployed at many other locations using additional funding, including key bottlenecks at mainstem Columbia River hydroelectric dams. These traps are novel in that they provide access to adult lamprey even before they enter the fish ladder. Given that lamprey (especially weak swimmers) in large numbers turn around at the entrance of many dams, this collector provides additional opportunities for lamprey to effectively bypass passage barriers within the Columbia River Basin.   
Account Type(s):
Expense
Contract Start Date:
04/01/2025
Contract End Date:
12/31/2026
Current Contract Value:
$48,281
Expenditures:

* Expenditures data includes accruals and are based on data through 31-Mar-2025.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Marker
5 m
10 ft
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Hans Berge Cramer Fish Sciences Yes Contract Manager hans.berge@fishsciences.net (503) 446-5942
Dan Bingham Cramer Fish Sciences Yes Supervisor dan.bingham@fishsciences.net (732) 278-3808
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Daphne Day Bonneville Power Administration Yes Env. Compliance Lead deday@bpa.gov (503) 230-5263
David Kaplowe Bonneville Power Administration Yes F&W Approver djkaplowe@bpa.gov (503) 230-5365
Ralph Lampman Yakama Confederated Tribes Yes Technical Contact lamr@yakamafish-nsn.gov (509) 388-3871
Jessica Power Bonneville Power Administration No CO Assistant jdpower@bpa.gov (503) 230-4023
Elizabeth Santana Bonneville Power Administration Yes COR easantana@bpa.gov (503) 230-3560


Viewing of Work Statement Elements
Loading...
Sort Order
WSEV ID
WE ID
Work Element Name
Title
Description
WSE Effective Budget
% of Total WSE Effective Budget
WSE Start
WSE End
         

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Routine administration of work elements 12/31/2026
Environmental compliance complete C: 165. Environmental Compliance 12/31/2026
Produce accessible, error-checked datasets D: 157. Deploy FALCON 12/31/2026
Completed Progress (Annual) Report E: 132. Submit Progress Report for the period (4/1/25) to (12/31/26) 12/31/2026

Viewing of Implementation Metrics
Loading...
Sort Order
WE ID
Work Element Name
Title
Description
Metric ID
Metric
End Fiscal Year
Planned
Actual
Contractor Comments
All Measures
Annual Progress Report Measures
Populations
Viewing of Environmental Metrics Customize
Loading...
WSE ID
WSE Start
WSE End
WE ID
Title
WSE Progress
Study Plan
Protocol
Category
Subcategory
Focus 1
Focus 2
Specific Metric Title

Primary Focal Species Work Statement Elements
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Routine administration of work elements
C 165 Environmental Compliance
D 157 Deploy FALCON
E 132 Submit Progress Report for the period (4/1/25) to (12/31/26)