Show new navigation
On
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
Select a work element:
Contract Number:
Contract Title:
2003-017-00 EXP ISEMP - SO FORK RESEARCH
Contract Start Date:
12/1/2014
Contract End Date:
11/30/2015
Title:
B: 165 - Provide Environmental Compliance Documentation for Work Element M
Description:
The NOAA BiOp for the Bridge Creek IMW and BLM NEPA documentation will be provided as Environmental Compliance documentation.

The Bridge Creek IMW work is shared with EcoLogical Research. South Fork Research is responsible for the riparian planting and monitoring, groundwater well monitoring, climate data stewardship, and permitting related activities while ELR is responsible for fish, geomorphological, in-stream habitat, and temperature monitoring, along with actual restoration implementation actions. SFR and ELR work together closely to coordinate the individual monitoring efforts.
WE Agreement Type:
Contracted
Deliverable Specification:
Deliver BLM NEPA Categorical Exclusion and NOAA BiOp as documentation of the Environmental Compliance necessary for work element M.
WSE Effective Budget:
$500
% of Total WSE Effective Budget:
0.10%
WSE Start:
12/01/2014
WSE End:
11/30/2015
WSE Completion:
11/30/2015
WSE Progress:
Concluded
WSE ID Continued From:
n/a
WSE ID Continued To:
n/a
Finite or Recurring:
Recurring

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $500 $500

9 Milestones
Sort Type Title Start End Status Modified By Modified Date
A ECCOMP Obtain BPA's EC Lead sign-off that EC requirements are complete 12/1/2014 1/30/2015 Concluded Carol Volk 10/20/2014 9:53:41 AM
Description: The EC? column on the contract SOW tab in Pisces must have a "full moon" for each work element requiring environmental compliance before ground-disturbing implementation of that work element can begin. You will receive verbal or email notification from the EC Lead when a work element or, in rare instances, a portion of a work element is approved for implementation.
B VEG BMPS Use Best Management Practices to stabilize soils and prevent spread of noxious weeds 12/1/2014 11/30/2015 Concluded Carol Volk 10/20/2014 9:59:56 AM
Description: Use applicable BMPs to retain existing vegetation and achieve re-establishment of vegetation in disturbed areas to at least 70% of pre-disturbance levels. Visit chapter 7.3 of http://www.ecy.wa.gov/pubs/0410076.pdf for BMPs to consider for construction contracts and http://wdfw.wa.gov/publications/01330/wdfw01330.pdf for guidance on re-vegetation in the Columbia River Basin.
C LAMP Determine if contract work could adversely affect Pacific lamprey 12/1/2014 1/30/2015 Concluded Carol Volk 10/20/2014 9:53:41 AM
Description: Contractor will review work proposed under this contract and determine the following: 1) Will field work take place in any area where lamprey may be present? (Any tributary or subbasin where anadromous fish exist is also accessible Pacific lamprey habitat.) 2) Are there any stream disturbing activities or instream activities that could adversely impact Pacific lamprey? Examples of activities posing a threat to lamprey may include (this list is not intended to be all-inclusive): aquatic habitat improvements, fish passage improvements, culvert replacements, water diversions, altered management of water flows, dewatering of any portions of streams, or alteration of irrigation practices. If the answer is yes to BOTH 1 and 2, the contractor must implement USFWS Best Management Practices to Minimize Adverse Effects to Pacific Lamprey (Entosphenus tridentatus) http://www.fws.gov/pacific/Fisheries/sphabcon/lamprey/pdf/Best%20Management%20Practices%20for%20Pacific%20Lamprey%20April%202010%20Version.pdf (BMPs).
D ESA Report lamprey observation and catch data to USFWS by Feb. 15 12/1/2014 1/30/2015 Concluded Carol Volk 10/20/2014 9:53:41 AM
Description: [IF ALL WORK UNDER THE SOW IS IN SUBBASINS BLOCKED TO ANADROMOUS SPECIES, ASK YOUR COTR TO CANCEL THIS MILESTONE.] All contractors doing instream work (e.g., surveys, habitat improvements, electrofishing, screwtraps, etc.) in anadromous fish areas are required to annually report lamprey observations or catch, including zero, by Feb 15 for the previous calendar year’s work. A data template is available at: (https://efw.bpa.gov/contractors/docs/Lamprey_Database_Template.xls) As per instructions on the form, email your data to christina_luzier@fws.gov at US Fish and Wildlife Service and CC your COTR. For identification of lamprey life stages see page 10 of USFWS Best Management Practices to Minimize Adverse Effects to Pacific Lamprey (Entosphenus tridentatus) http://www.fws.gov/pacific/Fisheries/sphabcon/lamprey/pdf/Best%20Management%20Practices%20for%20Pacific%20Lamprey%20April%202010%20Version.pdf.
E ANS Inspect water craft, waders, boots, etc. to be used in or near water for aquatic invasive species 12/1/2014 11/30/2015 Concluded Carol Volk 10/20/2014 9:59:57 AM
Description: Aquatic invasive Species Guidance: Uniform Decontamination Procedures: http://www.aquaticnuisance.org/wordpress/wp-content/uploads/2009/01/Recommended-Protocols-and-Standards-for-Watercraft-Interception-Programs-for-Dreissenid-Mussels-in-the-Western-United-States-September-8.pdf -- Best management guidance for boaters: http://www.coastal.ca.gov/ccbn/bmp-boaters.pdf -- Aquatic Nuisance Species newsletter: http://www.aquaticnuisance.org/newsletters -- State Aquatic Invasive Species Management Plans: Oregon: http://www.clr.pdx.edu/publications/files/OR_ANS_Plan.pdf -- Washington: http://www.wdfw.wa.gov/publications/pub.php?id=00105 -- Montana: http://www.anstaskforce.gov/Montana-FINAL_PLAN.pdf -- Idaho: http://www.idahoag.us/Categories/Environment/InvasiveSpeciesCouncil/documents/Idaho%20Aquatic%20Nuisance%20Species%20Plan.pdf
F NOXIOUS Inspect and, if necessary, wash vehicles and equipment infested with terrestrial invasive species 12/1/2014 11/30/2015 Concluded Carol Volk 10/20/2014 9:59:58 AM
Description: Prevent spread of invasive species
G ESA Participate in ESA Consultation 12/1/2014 11/30/2015 Concluded Carol Volk 10/20/2014 9:59:59 AM
Description: Work may include drafting BA, completing HIP III BO Project Notification Form, submitting high risk project designs to Restoration Review Team (RRT), providing copy of Section 10, 4(d), or 6 permit, etc., or submitting Hatchery Genetic Management Plan to BPA for ESA consultation initiation, and providing input for the ensuing consultation.
H PERMS Obtain/Renew applicable local, state, federal and tribal environmental permits 12/1/2014 11/30/2015 Concluded Carol Volk 10/20/2014 9:59:59 AM
Description: Work done to obtain permits such as Sec. 401 or 404 (including RGP process), shoreline, NPDES, or any other required federal, state, or local permits.
I DELIV Documentation of Environmental Compliance 11/30/2015 Concluded Carol Volk 10/20/2014 10:00:00 AM
Description: Deliver BLM NEPA Categorical Exclusion and NOAA BiOp as documentation of the Environmental Compliance necessary for work element M.

This work element does not require Focal Species
This work element does not require Environmental Compliance
This work element does not require RM&E metadata