This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $5,000 | $8,100 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | PUBNOTICE | Manuscript: Internal technical review | 12/1/2014 | 1/1/2015 | Concluded | Carol Volk | 10/20/2014 12:05:18 PM |
Description: Distribute manuscript for in-house, internal technical review. | |||||||
B | PRLMTITLRVW | Manuscript: External technical review | 1/1/2015 | 6/1/2015 | Concluded | Carol Volk | 10/20/2014 12:05:18 PM |
Description: Review manuscript externally before sending to the journal: It may include submission to interagency cooperators, a request for technical review by posting on the BPA website, sending the manuscript to the COTR for review or other such requests for technical review before submission to a peer-reviewed journal. It may also include policy review and obtaining internal or cooperator signatures internally required by the contractor. BPA does not require these signatures. | |||||||
C | COPYREQ | Manuscript: Request for copyright release. | 3/1/2015 | 11/30/2015 | Active | Carol Volk | 10/20/2014 12:05:19 PM |
Description: As part of the manuscript submission to the journal, BPA requests that all authors sign a request that would allow BPA to post the full, published article (instead of just the link to the Abstract), should the manuscript be publishable. Most journals require all authors to sign this request. | |||||||
D | MANSUBMIT | Manuscript: Submit to a journal for peer review | 4/1/2015 | 4/1/2015 | Concluded | Carol Volk | 10/20/2014 12:05:19 PM |
Description: Submit manuscript to [insert journal name(s) here, if known at the time of contracting]. | |||||||
E | DELIV | Produce article documenting riparian monitoring for Bridge Creek | 5/1/2015 | Concluded | Carol Volk | 10/20/2014 1:22:49 PM | |
Description: Produce article documenting riparian monitoring for Bridge Creek. Monitoring methods for Bridge Creek riparian areas will be developed into a manuscript for peer-reviewed publication. Continued task from 2014. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1469. # of draft manuscripts and draft final reports of research findings submitted for publication | 1 | 1 | draft reports submitted |