SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
1. 67971 (02/01/2015 - 01/31/2016) | $960 | $960 | ||
Work Element Budget (Current Performance Period) | $960 | $960 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | ECCOMP | Obtain BPA's EC Lead sign-off that EC requirements are complete | 2/1/2015 | 2/13/2015 | Concluded | David Byrnes (Inactive) | 4/7/2015 1:07:39 PM |
Description: The EC? column on the contract SOW tab in Pisces must have a "full moon" for each work element requiring environmental compliance before ground-disturbing implementation of that work element can begin. You will receive verbal or email notification from the EC Lead when a work element or, in rare instances, a portion of a work element is approved for implementation. | |||||||
B | LAMP | Determine if contract work could adversely affect Pacific lamprey | 2/1/2015 | 2/13/2015 | Concluded | David Byrnes (Inactive) | 4/7/2015 1:07:39 PM |
Description: Contractor will review work proposed under this contract and determine the following: 1) Will field work take place in any area where lamprey may be present? (Any tributary or subbasin where anadromous fish exist is also accessible Pacific lamprey habitat.) 2) Are there any stream disturbing activities or instream activities that could adversely impact Pacific lamprey? Examples of activities posing a threat to lamprey may include (this list is not intended to be all-inclusive): aquatic habitat improvements, fish passage improvements, culvert replacements, water diversions, altered management of water flows, dewatering of any portions of streams, or alteration of irrigation practices. If the answer is yes to BOTH 1 and 2, the contractor must implement USFWS Best Management Practices to Minimize Adverse Effects to Pacific Lamprey (Entosphenus tridentatus) http://www.fws.gov/pacific/Fisheries/sphabcon/lamprey/pdf/Best%20Management%20Practices%20for%20Pacific%20Lamprey%20April%202010%20Version.pdf (BMPs). | |||||||
C | ESA | Report lamprey observation and catch data to USFWS by Feb. 15 | 2/1/2015 | 2/15/2015 | Concluded | David Byrnes (Inactive) | 4/7/2015 1:07:39 PM |
Description: All contractors doing instream work (e.g., surveys, habitat improvements, electrofishing, screwtraps, etc.) in anadromous fish areas are required to annually report lamprey observations or catch, including zero, by Feb 15 for the previous calendar year’s work. A data template is available at: (https://efw.bpa.gov/contractors/docs/Lamprey_Database_Template.xls) As per instructions on the form, email your data to christina_luzier@fws.gov at US Fish and Wildlife Service and CC your COTR. For identification of lamprey life stages see page 10 of USFWS Best Management Practices to Minimize Adverse Effects to Pacific Lamprey (Entosphenus tridentatus) http://www.fws.gov/pacific/Fisheries/sphabcon/lamprey/pdf/Best%20Management%20Practices%20for%20Pacific%20Lamprey%20April%202010%20Version.pdf. | |||||||
D | ANS | Inspect water craft, waders, boots, etc. to be used in or near water for aquatic invasive species | 2/1/2015 | 1/31/2016 | Concluded | David Byrnes (Inactive) | 4/7/2015 1:07:39 PM |
Description: Aquatic invasive Species Guidance: Uniform Decontamination Procedures: http://www.aquaticnuisance.org/wordpress/wp-content/uploads/2009/01/Recommended-Protocols-and-Standards-for-Watercraft-Interception-Programs-for-Dreissenid-Mussels-in-the-Western-United-States-September-8.pdf -- Best management guidance for boaters: http://www.coastal.ca.gov/ccbn/bmp-boaters.pdf -- Aquatic Nuisance Species newsletter: http://www.aquaticnuisance.org/newsletters -- State Aquatic Invasive Species Management Plans: Oregon: http://www.clr.pdx.edu/publications/files/OR_ANS_Plan.pdf -- Washington: http://www.wdfw.wa.gov/publications/pub.php?id=00105 -- Montana: http://www.anstaskforce.gov/Montana-FINAL_PLAN.pdf -- Idaho: http://www.idahoag.us/Categories/Environment/InvasiveSpeciesCouncil/documents/Idaho%20Aquatic%20Nuisance%20Species%20Plan.pdf | |||||||
E | NOXIOUS | Inspect and, if necessary, wash vehicles and equipment infested with terrestrial invasive species | 2/1/2015 | 1/31/2016 | Concluded | David Byrnes (Inactive) | 4/7/2015 1:07:39 PM |
Description: Prevent spread of invasive species | |||||||
F | PERMS | Obtain/Renew applicable local, state, federal and tribal environmental permits | 2/1/2015 | 3/31/2015 | Concluded | David Byrnes (Inactive) | 4/7/2015 1:07:39 PM |
Description: Work done to obtain permits such as Sec. 401 or 404 (including RGP process), shoreline, NPDES, or any other required federal, state, or local permits. | |||||||
G | Submit copies of permits to BPA EC | 2/1/2015 | 3/31/2015 | Concluded | David Byrnes (Inactive) | 4/7/2015 1:07:39 PM | |
Description: Submit copies of permits to BPA EC | |||||||
H | DELIV | Sign-off from BPA's Environmental Compliance Group that EC requirements are met | 3/31/2015 | Concluded | David Byrnes (Inactive) | 4/7/2015 1:07:39 PM | |
Description: Submit permit reports to permitting agencies (NOAA, USFWS, WDFW) describing 2014 fieldwork and take. Documentation and assistance to support BPA's Environmental Compliance Group (such as maps, design drawings, survey reports, permit applications). |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1479. Are herbicides used as part of work performed under this contract? | No | No | |||
1722. Will water craft, heavy equipment, waders, boots, or other equipment be used from outside the local watershed as part of work performed under this contract? | No | No |