2010-028-00 EXP ADULT STEELHEAD ABUNDANCE: TUCANNON-ASOTIN
Contract Start Date:
12/1/2017
Contract End Date:
11/30/2018
Title:
E: 202 - Submit 2017 RPA (FCRPS BiOp) Report (01/01/2017 - 12/31/2017)
Description:
BiOp RM&E Projects: BPA requires a structured report of results for projects that have claimed that they support one or more RM&E RPAs under the FCRPS BiOp (i.e., RPAs 50-73). Separate BiOp RPA reports are now required to be completed online in a template to: a) facilitate a consistent summary of results; b) enable a synthesis of information across the entire Columbia River Basin; c) promote a standardized presentation of information to relate outcomes among projects; and d) provide clarity about format requirements for reports under the BiOp.

The online BiOp RPA report in Taurus (www.cbfish.org) should include the data, analyses, and data management completed by your project through December 31st. Any activity after the last day of the Calendar Year should be included in a subsequent BiOp report. For example, if you have completed redd surveys, but have not completed the analyses, you will report the preliminary data (# of redds). You do not need to rush your analyses; they may be reported in the subsequent RPA report.

For each RPA, follow the directions in Taurus for each of the three sections and, as appropriate, input graphical or tabular data, accompanied by explanatory text. These are cumulative summary reports and should show relevant results for the life of your project. Each year, note trends and whether they are changing from one year (or groups of years) to the next.

Upload into Taurus for the FCRPS BiOp (for other BiOps, upload in Pisces as an appendix to the annual report); and notify RMESupport@bpa.gov, and your BPA COTR, that the report is complete. For more guidance see: https://www.cbfish.org/Content/tutorials/Reporting_Guidance_BiOp_2013.pdf.
WE Agreement Type:
Contracted
Deliverable Specification:
The online BiOp RPA report in Taurus (https://www.cbfish.org/BiologicalOpinionAction.mvc/Index/2014/BiOpRpaStatus) should include the data, analyses, and data management completed no later than December 31st. Any activity after the last day of the Calendar Year should be included in a subsequent BiOp report. For example, if you have completed redd surveys, but have not completed the scale analyses, you will report the preliminary data (# of redds), but not (incomplete) age distributions of carcasses, which would be reported in the subsequent CY report.

For each RPA, follow the directions in Taurus for each of the three sections and, input completed graphical or tabular data, accompanied by any complete explanatory text. These are cumulative summary reports and should show relevant results for the life of your project. Each year, note trends and whether they are changing from one year (or groups of years) to the next.
WSE Effective Budget:
$0
% of Total WSE Effective Budget:
0.00%
WSE Start:
12/01/2017
WSE End:
07/15/2018
WSE Completion:
07/15/2018
WSE Progress:
Concluded
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $1,000 $0 RPA report was not completed at the direction of the COTR.

3 Milestones
Sort Type Title Start End Status Modified By Modified Date
A RPA.1 Lead project proponent will download RPA questions from cbfish.org 12/1/2017 7/15/2018 Concluded Russell Scranton 10/20/2017 10:46:11 AM
Description: To prepare for your RPA report, 1) Go to www.cbfish.org and log in, 2) Navigate to your project and select "BiOp Annual Report" from the “Views/Action” menu button, 3) Click on "Input Needed" for each applicable RPA to find your RPA reporting requirements so you will know how much time to set aside for this task. You may also click the “download RPA doc” button to get all RPA questions in one MS Word document. 4). For further guidance or to request help, email BPA RM&E RPA support RMESupport@bpa.gov or email your COTR. (Milestone start/end: July 1 – September 30)
B RPA.3 Lead project proponent will finalize calendar year report in cbfish.org 2/1/2018 7/15/2018 Concluded Russell Scranton 10/20/2017 10:46:11 AM
Description: The final version is due by March 15. (Milestone start/end: December 31 - March 15)
C DELIV Submit BiOp RPA Report in Taurus 7/15/2018 Concluded Russell Scranton 10/20/2017 1:18:35 PM
Description: The online BiOp RPA report in Taurus (https://www.cbfish.org/BiologicalOpinionAction.mvc/Index/2014/BiOpRpaStatus) should include the data, analyses, and data management completed no later than December 31st. Any activity after the last day of the Calendar Year should be included in a subsequent BiOp report. For example, if you have completed redd surveys, but have not completed the scale analyses, you will report the preliminary data (# of redds), but not (incomplete) age distributions of carcasses, which would be reported in the subsequent CY report. For each RPA, follow the directions in Taurus for each of the three sections and, input completed graphical or tabular data, accompanied by any complete explanatory text. These are cumulative summary reports and should show relevant results for the life of your project. Each year, note trends and whether they are changing from one year (or groups of years) to the next.

This work element does not require Metrics
This work element does not require Focal Species
This work element does not require Environmental Compliance
This work element does not require RM&E metadata