1995-001-00 EXP KALISPEL RESIDENT FISH HABITAT CONTRACT
Contract Start Date:
3/1/2021
Contract End Date:
2/28/2022
Title:
B: 165 - Environmental Compliance Documentation
Description:
Environmental compliance to implement habitat assessment and restoration activities.
WE Agreement Type:
Contracted
Deliverable Specification:
Environmental compliance documentation will be required for habitat restoration work to proceed.
WSE Effective Budget:
$10,000
% of Total WSE Effective Budget:
2.14%
WSE Start:
03/01/2021
WSE End:
02/28/2022
WSE Completion:
02/28/2022
WSE Progress:
Concluded
WSE ID Continued From:
n/a
WSE ID Continued To:
n/a
Finite or Recurring:
Recurring

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $10,000 $10,000

11 Milestones
Sort Type Title Start End Status Modified By Modified Date
A 1-HIP HIP Risk Determination (F&W HABITAT ACTIONS ONLY) : Contact BPA EC Lead for risk determination 3/1/2021 7/31/2021 Concluded Virgil Watts III 12/2/2020 7:28:13 PM
Description: FOR HABITAT ACTIONS ONLY: The EC Lead will determine if work under this work element may be able to have full ESA-coverage (NMFS & USFWS) under the Habitat Improvement Program Biological Opinion (HIP). The HIP has expanded coverage for projects that may pose a moderate to high risk of impacting an ESA-listed species or critical habitat that would normally require a Biological Assessment. For work that qualifies, projects will undergo a review by the EC Lead and Engineering Technical Services (ETS) team. Before conceptual design commences, contact the EC Lead for HIP consideration, instruction, and information needs and requirements for coverage eligibility. The HIP activity categories and risk criteria are located in the current HIP Handbook located here: https://www.bpa.gov/efw/Analysis/NEPADocuments/Pages/ESA-Process.aspx
B VEG BMPS Use Best Management Practices to stabilize soils and prevent spread of noxious weeds 3/1/2021 2/28/2022 Concluded Virgil Watts III 10/6/2020 9:53:00 AM
Description: Use applicable BMPs to retain existing vegetation and achieve re-establishment of vegetation in disturbed areas to at least 70% of pre-disturbance levels. For example, see "Shrub-Steppe and Grassland Restoration Manual For the Columbia River Basin" (http://wdfw.wa.gov/publications/01330/wdfw01330.pdf), or "Revegetation for Stream Restoration and Fish Passage Projects" (https://www.wsdot.wa.gov/publications/manuals/fulltext/M25-30/830.pdf) for guidance on re-vegetation in the Columbia River Basin.
C ANS Inspect water craft, waders, boots, etc. to be used in or near water for aquatic invasive species 3/1/2021 2/28/2022 Concluded Virgil Watts III 11/30/2020 2:24:08 PM
Description: Aquatic invasive Species Guidance: Uniform Decontamination Procedures: http://www.aquaticnuisance.org/wordpress/wp-content/uploads/2009/01/Recommended-Protocols-and-Standards-for-Watercraft-Interception-Programs-for-Dreissenid-Mussels-in-the-Western-United-States-September-8.pdf -- Best management guidance for boaters: http://www.westernais.org -- Aquatic Nuisance Species newsletter: http://www.aquaticnuisance.org/newsletters -- State Aquatic Invasive Species Management Plans: Oregon: http://www.aquaticnuisance.org/wordpress/wp-content/uploads/2009/01/Recommended-Protocols-and-Standards-for-Watercraft-Interception-Programs-for-Dreissenid-Mussels-in-the-Western-United-States-September-8.pdf -- Washington: http://www.wdfw.wa.gov/publications/pub.php?id=00105 -- Montana: http://www.anstaskforce.gov/Montana-FINAL_PLAN.pdf -- Idaho: http://www.anstaskforce.gov/stateplans.php
D NOXIOUS Inspect and, if necessary, wash vehicles and equipment infested with terrestrial invasive species 3/1/2021 2/28/2022 Concluded Virgil Watts III 11/30/2020 2:24:08 PM
Description: Prevent spread of invasive species by identifying and removing invasive species from work vehicles and equipment. Consult resources such as the Plants Database (http://plants.usda.gov/index.html) or the NatureServe Explorer (http://www.natureserve.org/explorer/) with assistance identifying invasive plants. Other resources include state natural resource offices (https://www.fws.gov/offices/statelinks.html) or a local U.S. Fish and Wildlife Service Office (https://www.fws.gov/offices/).
E PI Complete and document public involvement activities and provide to EC Lead 3/1/2021 2/28/2022 Concluded Virgil Watts III 11/30/2020 2:24:08 PM
Description: Public involvement is any outreach to the public or landowners about specific actions that are proposed. This could be public letters, meetings, newspaper notices, posted notices at local facilities, or information booths at local events.
F ESA Participate in ESA Consultation 3/1/2021 2/28/2022 Concluded Virgil Watts III 11/30/2020 2:24:08 PM
Description: Work may include drafting BA (or other ESA documentation), completing HIP forms, submitting high risk project designs to the EC Lead, providing copies of Section 10, 4(d), or 6 permits, etc., or submitting Hatchery Genetic Management Plan to BPA for review and ESA consultation initiation, and providing input for the ensuing consultation. Once the program has completed Section 7 consultation and has obtained relevant permits or authorizations (Section 10, 4(d), etc), be familiar with and follow all terms and conditions, including annual reporting, associated with the ESA consultation or permit. Notify BPA immediately of any instances when take has been exceeded or terms and conditions or conservation measures have been violated.
G 106 Provide information for Section 106 Cultural review 3/1/2021 2/28/2022 Concluded Virgil Watts III 11/30/2020 2:24:08 PM
Description: Email EC Lead detailed project description, map, and shapefiles so that BPA can initiate Section 106 review.
H 106 Plan for field inventory if required 3/1/2021 2/28/2022 Concluded Virgil Watts III 1/5/2021 10:43:38 AM
Description: Coordinate with EC Lead and BPA archaeologist to determine appropriate approach and methodology for field inventory, if determined necessary by BPA archaeologist.
I 106 Cultural resource surveys if needed 3/1/2021 2/28/2022 Concluded Virgil Watts III 1/5/2021 10:43:38 AM
Description: Coordinate with EC Lead to schedule cultural resources surveys if required by BPA archaeologist.
J PERMS Obtain/Renew applicable local, state, federal and tribal environmental permits as required 3/1/2021 2/28/2022 Concluded Virgil Watts III 1/5/2021 10:43:38 AM
Description: Work done to obtain permits such as Sec. 401 or 404 (including RGP process), shoreline, NPDES, or any other required federal, state, or local permits. Send copies of final permits to EC Lead as requested.
K DELIV Environmental Compliance Documentation as Needed 2/28/2022 Concluded Virgil Watts III 11/30/2020 2:24:08 PM
Description: Environmental compliance documentation will be required for habitat restoration work to proceed.

This work element does not require Focal Species
This work element does not require Environmental Compliance
This work element does not require RM&E metadata