This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $530 | $530 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | HIPCOVER | Discuss HIP ESA coverage with Bonneville EC lead (if needed) | 7/1/2024 | 6/30/2025 | Active | Jennifer Plemons | 5/9/2024 12:33:07 PM |
Description: The EC Lead will determine if work under this work element may be able to have ESA-coverage (NMFS & USFWS) under the current version of the Habitat Improvement Program Biological Opinions (HIP BiOps). Work that qualifies must comply with conservation measures in the HIP Handbook. Medium to high risk projects will require a technical review by the Bonneville Engineering Technical Services. Before conceptual design commences, contact the EC lead for HIP applicability, instructions and information requirements. The HIP activity categories and risk criteria are located in the “Note” section of the work element background page here: https://www.cbfish.org/WorkElement.mvc/Summary/165 | |||||||
B | ESA | Participate in ESA Consultation (if needed) | 7/1/2024 | 6/30/2025 | Active | Jennifer Plemons | 5/9/2024 12:32:41 PM |
Description: Work may include drafting BA (or other ESA documentation), completing HIP forms, submitting high risk project designs to the EC Lead, providing copies of Section 10, 4(d), or 6 permits, etc., or submitting Hatchery Genetic Management Plan to BPA for review and ESA consultation initiation, and providing input for the ensuing consultation. Once the program has completed Section 7 consultation and has obtained relevant permits or authorizations (Section 10, 4(d), etc), be familiar with and follow all terms and conditions, including annual reporting, associated with the ESA consultation or permit. Notify BPA immediately of any instances when take has been exceeded or terms and conditions or conservation measures have been violated. | |||||||
C | PERMS | Obtain/Renew applicable local, state, federal and tribal environmental permits (if needed) | 7/1/2024 | 6/30/2025 | Active | Jennifer Plemons | 5/9/2024 12:32:41 PM |
Description: Work done to obtain permits such as Sec. 401 or 404 (including RGP process), shoreline, NPDES, or any other required federal, state, or local permits. Send copies of final permits to EC Lead as requested. | |||||||
D | DELIV | Environmental Compliance for the Clearwater Subbasin Inventory and Potlatch Geomorphic Assessment | 6/30/2025 | Active | Jennifer Plemons | 5/6/2024 2:56:31 PM | |
Description: Assist sponsors with environmental compliance as needed. Submit information necessary for BPA to provide environmental clearance for projects identified in this SOW. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1479. Are herbicides used as part of work performed under this contract? | No | ||||
1722. Will water craft, heavy equipment, waders, boots, or other equipment be used from outside the local watershed as part of work performed under this contract? | No |